건축물의 생산 프로세스를 성공적으로 진행하기 위한 시발점은 사업 타당성 분석에서부터 비롯된다. 사업타당성 분석이 부실하여 그 결과가 설계 및 시공과 같이 직접적인 생산단계에서 나타난다면 이미 돌이킬 수 없는 상황에서 기업에 많은 손실을 끼치게 된다. 정부에서는 IMF 이후 건설산업의 경쟁력 확보 차원에서 500억원 이상의 공사에 대해 반드시 사업타당성 분석을 시행토록 제도화하고 있지만 민간 건축개발사업의 타당성 분석과 관련해서는 체계적인 연구나 지침 마련을 위한 조직과 노력이 매우 미흡한 실정이다. 따라서 본 연구에서는 상업 건축물 중 사무소 건물을 대상으로 시스템 다이내믹스 기법을 활용하여 사업성에 영향을 미치는 여러 변수의 변화와 상호관계를 고려하여 체계적으로 분석을 하여 사업타당성 분석항목 및 평가기준 설정을 목적으로 한다.
This paper analyzed economic feasibility of aquacultural construction which of large-scale. The results of the economic analysis, cage cultural and water recycling cultural by post-water treatment were analyzed that NPV is 2,083,685 thousand won and -14,105,896 thousand won and B/C ratio is 0.590 and 0.855, respectively. These were shown economic infeasibility. But, running water culture by pre-water treatment(small scale) and running water culture by pre-water treatment(large scale) were analyzed that the one is 5,555,747 thousand won and 15,048,589 thousand won and the other is 1,154 and 1,1221, respectively. these were shown economic feasibility. In addition, measurement of B/C ratio through a sensitivity analysis on running water cultural by pre-water treatment(small scale) and running water cultural by pre-water treatment(large scale) is economic feasibility in all cases. However, these were analyzed when the selling price was falling to 20 percent, it has shown economic infeasibility and when the selling price rises to 20 percent, water recycling culture by post-water treatment has economic feasibility. The significance of the study analyzed a sensibility as well as economic feasibility by methods and scales. It is expected that used as basic materials when constructing and operating of land aquaculture in order to minimize the damage from natural disasters.
This study analyzed the feasibility of custom work service to deal with the imbalance of farm labor supply due to population aging. The economic feasibility analysis is based on the case of Bonghwang-myeon in Naju-si, where the majority of farm work is entrusted to local agricultural cooperative. To assess the project profitability and economic feasibility based on the projected cash flow for the next ten years, Return On Investment (ROI), Net Present Value (NPV), and Internal Rate of Return (IRR) of the projects were calculated. The results showed that ROI is estimated at 13.7%, and NPV and IRR are KRW 1,504,932,000 and 15.6%, respectively, with a discount rate of 4.5%, indicating a good enough profitability. Furthermore, a sensitivity analysis with government support as part of an assumption showed that without the support, NPV turns negative, implying that the project is not profitable, and that government support for at least 30% of the cost is needed to secure the economic feasibility of a project. Hence, to promote agricultural work entrustment, it is necessary for the government to partly support the agricultural machinery and facility costs, which require a considerable amount of initial investment.
This paper was researched on economic feasibility and sensibility of operation to offshore cage culture for cod. Offshore cage culture for cod needs to invest high budget what to construction and operation. And it was required variety methods about analysis of economic feasibility. Therefore, these were studied NPV, B/C and sensitivity for each by assuming a six scenarios considering the product performance according to the size of cod and culturing methods of fingerlings, etc. As a results, even though economy, if efficiency is low, it is a priority need the technical development to promote the feed efficiency to increase economic feasibility and should make efforts to enhance the business economy to strengthen the price competitiveness pricing with high quality products through quality control and brand recognition of cod. It expects to be used as a reference for related research in the future by deriving policy implications based on the method of analysis of the economic feasibility on offshore cage culture for cod.
This study deals with replacement analysis of deteriorated equipment for improving productivity of production system. Frequent breakdown of the deteriorated equipment causes a situation that reduces productivity such as low product quality, process delay, and repair cost. However, the replacement of new equipment will be required a high initial investment cost, so it is important to analysis the economic feasibility. Therefore, we analyze the effect of the production system due to the aging effect of the equipment and the feasibility of equipment replacement based on the economic analysis. The process flow, working time, logistics movement, etc. are analyzed in order to build the simulation modeling for a ship and land switchboard production system. Using numerical examples, the economic feasibility analysis of equipment replacement through replacement of existing deteriorated equipment and additional arrangement of new facilities is performed.
This study analyzes the economic feasibility of agrivoltaics in South Korea. The key findings are as follows. It was ascertained that an amendment to the Farmland Act, which currently has an 8-year permit period, is necessary to ensure the economic feasibility of agrivoltaic projects. Furthermore, economic feasibility improves when agrivoltaic projects are financed, as against cases without financing. Furthermore, the availability of low-interest loans through financial support programs significantly enhances economic feasibility. Scaling up projects leads to cost savings due to economies of scale, while community-based agrivoltaic initiatives generate higher revenue through the acquisition of additional Renewable Energy Certificates. These factors can help improve the economic feasibility of agrivoltaic projects. These incentives are emphasized as they can serve as a source of funding to foster community acceptance of agrivoltaic projects.
The 2th International Conference on Construction Engineering and Project Management
/
pp.820-829
/
2007
This paper presents an evaluation of feasibility studies conducted to justify investments in infrastructure projects. An analysis of a previous feasibility study for a highway construction project is presented in this paper with an emphasis on the estimates and forecasts presented in that study in order to weigh expected benefits from the project against expected costs. The forecasted numbers are compared with actual data collected during the operation phase about the usage of the facility. The comparison reveals a huge difference between estimated numbers and actual numbers. Based on the lessons learned from the analyzed case study, recommendations are presented to improve feasibility studies for infrastructure projects including: peer review of feasibility studies; before-and-after feasibility studies; and defined scope and methodology for feasibility studies. Decision makers are advised to take outcomes of feasibility studies for infrastructure projects with extreme caution as some studies may provide erroneous and misleading input to their decisions regarding investment in infrastructure projects.
With construction industry recession, many construction companies are increasingly conducting the development projects by themselves. However, housing projects requested by developers still stand large portion. Although many studies on feasibility analysis were released, they mainly focused on economic feasibility and lacked research on factors and criterions of overall project. Also, because previous studies overly break downed factors related to project, they rarely used in practice. Therefore, this study developed the feasibility analysis model of housing development projects to help main contractors to easily and effectively decide if it is feasible enough to promote the projects requested by developers, and verified the reliability of the model. In this study, thirty one driving factors were identified under seven different categories and the criterion of each factor was also developed. The survey on important index of each factor found 'salability', 'economic feasibility', 'site location' and 'method of raising fund' significant. 12 projects were tested by the model and its results showed resonable reliability.
사업기획 및 타당성분석단계는 사업을 추진하는데 가장 큰 영향을 미치는 단계로써, 정확한 프로젝트 타당성 검토 수행은 프로젝트를 추진하는데 결정적인 기회를 제공해주므로 직관적인 접근방식보다는 객관적이고 정확한 방법의 제시가 요구되는 바이다. 사업타당성을 정확하게 분석하기 위하여 본 논문에서는 프로젝트 진행에 영향을 주는 리스크 인자를 식별하고 이 인자들을 성격별로 그룹화한다. 소규모 임대주택의 사례를 바탕으로 기존 방식인 금융부분의 프로젝트 타당성 분석을 실시한다. 위에서 식별된 리스크 인자들 중 금융부분을 포함하여 인자들간의 상관관계를 Influence Diagram으로 파악하여 리스크를 분석하고, 각 인자별의 중요도를 판별하기 위한 민감도 분석을 실시한다. 이와 같은 과정을 통하여, 기존의 프로젝트 타당성분석에서 사용하는 금융부분의 타당성분석 뿐만 아니라, 프로젝트 진행시에 나타나는 비정형적이고 주관적인 요소들을 리스크 인자로써 포함하여 분석할 수 있는 장점이 있다. 또한, 도출된 모든 리스크 인자를 정량화하여 객관적인 분석 및 의사결정을 할 수 있기 때문에 기존 방법보다 발전된 프로젝트 타당성 분석 방안을 본 논문에서 제시하였다.
본 논문은 정부의 광대역통합망(BcN) 구축의 일환으로서 농어촌지역의 BcN 기반구축 사업의 타당성 분석을 목적으로 한다. 사업타당성 분석을 위하여 새로운 평가지표를 도출하고 전문가설문을 활용한 AHP 기법을 사용하여 사업타당성을 평가하였다. 그리고, 관련 선행연구를 살펴봄으로써 적합한 평가지표를 도출하고 계층화 분석법(AHP)을 사용하여 BcN 사업타당성을 평가하도록 한다. 그 결과 주요 타당성 지표로서 경제적 타당성, 기술적 타당성, 정책적 타당성 등이 BcN 사업타당성 지표로 도출되었으며, 평가기준으로 이해되었다. 연구결과 사업시행은 타당한 것으로 나타났으며, 분석의 신뢰도를 나타내는 비일관성지수는 0.0566으로 낮게 나타났다. 그리고, 향후 BcN 구축사업이 국민의 생활개선 향상에 크게 기여할 것으로 기대된다. 또한 BcN 사업을 합리적으로 추진하기 위한 기초자료로서 가치가 있을 것이다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.