• Title/Summary/Keyword: feasibility analysis

Search Result 3,658, Processing Time 0.033 seconds

Feasibility Study of Multi-regional Transmission Main Stabilization for Sustainable Water Supply (수돗물 공급 안정화를 위한 광역상수도 관로 안정화 타당성 연구)

  • Lee, Jae Bum;Yi, Choong Sung;Jung, Kwan Sue
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.3
    • /
    • pp.395-404
    • /
    • 2013
  • The risk of pipe-bursting in multi-regional transmission mains consisting of 89 % of singled pipeline is so high that pipeline stabilization project is required such as renewal and replacement, pipe paralleling, emergency ties. Pipeline stabilization projects could be postponed at the step of initial decision-making because effect of this project is intangible benefit like activation of economic, improvement of welfare related to water. This study is to suggest quantified economical feasibility model for intangible benefit presumption to solve above problem. Cost reduction of emergency water supply, leakage, burst restore and energy efficiency improvement was altered and applied. As a result of economic analysis taking into account estimated benefit and cost under discount rate 5.5 %, service life 40 years, sufficient economic feasibility analyzed with B/C 2.45, NPV 317,700 million won, IRR 9.09 %.

Application of Risk Management to Forecasting Transportation Demand by Delphi Technique (Delphi기법을 통한 교통수요예측 Risk Management 적용 방안)

  • Chung, Sung-Bong
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.2
    • /
    • pp.267-273
    • /
    • 2011
  • Since 'The Act on Private Investment of The Infrastructure' was established in 1994, private investment as well as government's investment in transport infrastructure has been active. However investment in transport infrastructure has more risks than others' due to uncertainty both in traffic volume and in construction cost. In the current appraisal procedure of deciding transportation infrastructure investment, instead of risk management, the sensitivity analysis considering only the changes of benefit, cost and social discount rate which are main factor affecting economic feasibility is carried out. Therefore the uncertainty of various factors affecting demand, cost and benefit are not considered in feasibility study. In this study the problems in current investment appraisal system were reviewed. Using Delphi technique the major factors which have high uncertainty in feasibility study were surveyed and then improvement plan was suggested in the respective of classic 4 step demand forecasting method. The range estimation technique was also mentioned to deal with the uncertainty of the future.

The Feasibility Study of Offshore Outsourcing in Korea SI Industry: Comparison between India and China case (한국 SI 산업의 Offshore 아웃소싱 가능성 검토: 인도/중국 사례 비교)

  • Yoo, Jin-Ho;Kwon, Yong-Min;Yi, Yoon-Sung
    • Journal of Information Technology Services
    • /
    • v.4 no.2
    • /
    • pp.135-144
    • /
    • 2005
  • The plenty of successful cases of Multi-national companies has been realized benefits of offshore outsourcing in particular "cost savings" from offshore IT outsourcing services, such as call center, software development, IT support and maintenance etc. A few Korean companies recently started to make the feasibility study of offshore IT outsourcing to catch up with the global trend. The objective of this study is to present the feasibility of offshore IT outsourcing of Korean companies through the analysis of pilot projects results between Indian and Chinese companies. The analysis include key elementsof cost, productivity, quality, practical issues as well as Gartner's framework, "AD Sourcing Cost Model", composed of 7 model factors. The findings of this study are not limited to understand offshore IT outsourcing but also provide useful guidelines covering wide range from the theoretical framework of selecting suitable offshore partner.

Feasibility Study of Fine Dust Removal Technology in Construction Site (건설현장 미세먼지 제거기술의 타당성 분석)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.120-121
    • /
    • 2019
  • The construction industry is known to be one of the representative industries that generate fine dust. Therefore, reducing the amount of fine dust generated in construction sites is very important for the overall fine dust management. Based on this, this study proposed the concept of fine dust measurement and removal technology combined with advanced technologies such as drones and IoT. The qualitative, quantitative and risk elimination effects that can be expected when applying the proposed technique are analyzed. We will verify the effectiveness of the proposed concept through system development and field application, and evaluate specific economic feasibility through cost analysis. The proposed concept will be validated through system development and field application and evaluated specific economics through cost analysis.

  • PDF

Financial Feasibility Study by Considering Risk Factors for High-Rise Development Project (초고층 개발사업의 리스크 요인을 고려한 재무적 타당성 분석)

  • Chun, Young-Jun;Cho, Joo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.3-16
    • /
    • 2017
  • Forecasting cash flow is very important but is difficult and complicated to analysis in high-rise development projects. And An expected value which was forecasted on the early stage is likely to fluctuate due to uncertainties around such complicated huge project to consider the probable uncertainty. There are not objectified method which are able to cope with uncertainty of project, and feasibility study based on selected financial analysis does not include liquidity of cash flow. Through such a stochastic method, developer can cope with cash flow fluctuation and set up a financial plan. Also this study is meaningful for laying the foundation for high-rise development project and feasibility study as well as the suitability and accuracy of feasibility study. Analysis showed that NPV and IRR include residential apartments shows surplus revenue as return of apartments offset deficit of hotel and office. Factors influencing the project feasibility for high-rise development project are sales account of $1^{st}$ year and annual vacancy rate of office.

A study on the Dynamic Cost-Benefit Analysis with System Dynamics: Modeling and Economic Feasibility (시스템 다이내믹스 기법을 활용한 동태적 비용편익분석 모델구축과 사업성 평가에 관한 연구)

  • 최남희;전재호
    • Korean System Dynamics Review
    • /
    • v.3 no.2
    • /
    • pp.113-140
    • /
    • 2002
  • The cost-benefit analysis is a technique for assisting with decision about the use of society's scare resources. There exists no detailed assessment like cost-benefit analysis. But recently, many policy analysts criticized the merit of cost-benefit analysis. As it is, it can be said that partial or approximate estimates of benefit and cost may be more dangerous than helpful. The purpose of this study is to overcome the limit of traditional cost-benefit analysis. For this purpose, we use the system dynamics approach for setting up new cost-benefit analysis, which we named that ‘Dynamics Cost-Benefit Analysis'. The usefulness of ‘Dynamics Cost-Benefit Analysis' is as follows; finding structural causal relationship between cost factors and benefit factors, understanding the long-term behavior of systems economic feasibility. In this study, we apply 'Dynamic Cost-Benefit Analysis' to case that is construction investment of funeral house by local government sector.

  • PDF

A Study on the Feasibility Assessment for Selecting Recreation Forest Sites: The Case of Gwangju-si in Gyeonggi-do (휴양림 조성 대상지 선정을 위한 타당성 평가 연구 - 경기도 광주시를 중심으로 -)

  • Seo, Jung-young;Yeom, Sung-Jin
    • Journal of Environmental Science International
    • /
    • v.28 no.11
    • /
    • pp.959-969
    • /
    • 2019
  • This study sought to contribute to the revitalization of local economy by developing a natural recreation forest, which is the base of ecotourism recreation, through utilizing forest resources and the natural environment of Gwangju-si. The study conducted a feasibility assessment through on-site surveys such as the suitability of the candidate sites, location analysis, and possibility of damage to the forest, before developing recreation forest sites in Gwangju-si and, based on the result, selected appropriate subject sites. The candidates for this study were 5 forest sites such as one site in the Mokheon-dong area, two in the Docheok-myeon area, and one in the Toechon-myeon area. For this study, the current status of the natural recreation forest was surveyed, its feasibility index and assessment process were investigated, and the local status and related regulations of Gyeonggi-do and Gwangju-si were reviewed. The final subject sites were selected after feasibility assessment utilizing assessment index in order to evaluate the candidate sites. The feasibility assessment was conducted after three separate on-site surveys for each candidate site between October 2018 and January 2019 utilizing "The Feasibility Assessment Criteria for Natural Recreation Forest (Notification 2018-71)" of the Korean Forest Service. The items instrumental to the feasibility assessment were classified into landscape, location, water system, induction of recreation, and development condition; the assessment was made after redefining each item into detailed items. Through this process, the Usan-ri area was selected as the final site for developing natural recreation forest, having obtained more than 100 points according to "The Feasibility Assessment Criteria for Natural Recreation Forest" of the Korean Forest Service. In order to develop natural recreation forest in the Usan-ri area in the future, further discussion is necessary with the relevant departments in consideration of the degree of ecological zoning map.

Economic Feasibility of a Hypothetical Shrimp Farm a Combination of Semi-Closed Raceways and Ponds (시범 새우양식장의 경제적 타당성 연구)

  • 이재후
    • The Journal of Fisheries Business Administration
    • /
    • v.13 no.1
    • /
    • pp.85-97
    • /
    • 1982
  • This study involves a blending of intensive and extensive shrimp culture techniques for a hypothetical shrimp farm which uses a combination of heated raceway nurseries and extensive grow-out ponds per year. The present value method of economic analysis is used to determine economic feasibility. The biological data in this reports were obtained from published or personal communications from leaders in the field of shrimp aquaculture. The proposed system showed economic feasibility using the present value method with discount rates of 10% and 12%. The most profitable scenario, the culture of three crops of Penaeus vannamei showed a 1.26 year payback period and 120% annual average rate of return. The breakeven price was $1.25/1b., which is $1.52 less than the market price of $2.77. Breakeven production was 724 1bs/acre, which is 8761bs. less than the assumed 1,600 1bs/acre. All other scenarios 1.2 and 3 crops for P. stylirostris and P. setiferus showed economic feasibility also.

  • PDF

An Economic Feasibility Study of Mackerel Offshore Aquaculture Production System (고등어 외해가두리양식의 경제성 분석)

  • Kim, Do-Hoon
    • The Journal of Fisheries Business Administration
    • /
    • v.43 no.3
    • /
    • pp.23-30
    • /
    • 2012
  • This study aimed to analyze the economic feasibility of Mackerel offshore aquaculture production performance in Jeju region, Korea. Based on the collected biological, costs and market price data, farming revenue and expenses during the farming period were evaluated, and the net present value and the internal rate of return of a 10-year cash inflow and cash outflow were estimated to determine the economic feasibility of Mackerel offshore aquaculture production system. Model results indicated that the Mackerel offshore aquaculture production performance would have high profitability under the current production and market situation. This is because of the relatively high survival rate, relatively low feed conversion ratio and good market prices. However, sensitivity analyses of main important biological and economic variables showed that the economic viability of Mackerel offshore aquaculture production system would be highly vulnerable to production and market condition changes.

Feasibility Study on Environment-friendly Project to Improve Habitability in National Rental Apartment - focused on Gwangju City - (국민임대주택 주거환경 개선을 위한 친환경사업의 타당성 분석 - 광주광역시를 대상으로 -)

  • Park, Hyeon-Ku;Lee, Hyun-Chul
    • Journal of the Korean housing association
    • /
    • v.20 no.5
    • /
    • pp.23-30
    • /
    • 2009
  • In case of national rental apartment, habitability is generally evaluated low comparing with typical apartments. So, researches and investment are required to increase the residential environment. In this point of view, present study aims to suggest the basic data for improvement of homeless masses' dwelling level through economic feasibility analysis. Firstly national rental apartment, which habitability is considered to be low in the point of environment-friendly, welfare, and convenience, is chosen as objective. Secondly environment-friendly project items including project flow were set up, and then basic model was formed to evaluate economic feasibility through priority survey to residents. In result, priority for two items among six different proposals were higher than the others. This result could be useful when trying to increase the dwelling level of national rental apartment being planned to construct in future.