• Title/Summary/Keyword: fault area

Search Result 802, Processing Time 0.025 seconds

Reliability analysis of the switch installation in the main feeder and in the radial/loop lateral feeders in distribution system (간선 및 분기선의 개폐기 설치 효과 분석(I))

  • Cho, Nam-Hun;O, Jae-Hyeong;Lee, Heung-Ho;Ha, Bok-Nam
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.79-82
    • /
    • 2002
  • The addition of switches to a distribution feeder does, in general, increase reliability by decreasing the duration of the outage of many to the customers on the feeder. To cover its service area so that feeder-level delivery reaches sufficiently close to all customers, feeders typically split their routes many times, in what is often called a lateral feeder. It is interesting to note, however, that the effectiveness of a switch is very much dependent on the types of lateral feeder. The types of lateral are classified into two types. The first is loop lateral feeder that can connect its load to an adjacent feeder through a tie line in case that a fault occurs in its feeder and it is laid out so that every feeder has complete fault backup through re-switching of its loads to other sources like a main feeder. The second is the radial lateral feeder cannot connect its load to an adjacent line, no provision is made for contingency backup of feeders. There are no other circuits in the radial lateral feeder form which to restore power. In this study, we evaluate the effectiveness of a switch installation between on the radial and loop lateral feeders to increase reliability by decreasing the duration of the outage. These results can help power utility to design the switch layouts on the radial and loop lateral feeder system.

  • PDF

A New Fault-Based Built-In Self-Test Scheme for 1.8GHz RF Front-End (1.8GHz 고주파 전단부의 결함 검사를 위한 새로운 BIST 회로)

  • Ryu Jee-Youl;Noh Seok-Ho
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.42 no.6 s.336
    • /
    • pp.1-8
    • /
    • 2005
  • This paper presents a new low-cost fault-based Built-In Self-Test (BIST) scheme and technique for 1.8GHz RF receiver front end. The technique utilizes input impedance matching measurement. The BIST block and RF receiver front end are designed using 0.25m CMOS technology on a single chip. The technique is simple and inexpensive. The overhead of the BIST circuit is approximately $10\%$ of the total area of the RF front end.

Study on the Electrical Insulation of Current Lead in the conduction-cooled 1-2kV Class High-Tc Superconducting DC Reactor (전도냉각되는 1-2kV급 고온초전도 직류리액터 전류도입부의 전기적 절연에 대한 연구)

  • 배덕권;안민철;이찬주;정종만;고태국;김상현
    • Progress in Superconductivity and Cryogenics
    • /
    • v.4 no.1
    • /
    • pp.30-34
    • /
    • 2002
  • In this Paper, Insulation of current lead in the conduction-cooled DC reactor for the 1.2kV class 3 high-Tc superconducting fault current limiter(SFCL) is studied. Thermal link which conducts heat energy but insulates electrical energy is selected as a insulating device for the current lead in the conduction-cooled Superconducting DC reactor. It consists of oxide free copper(OFC) sheets, Polyimide films, glass fiberglass reinforced Plastics (GFRP) plates and interfacing material such an indium or thermal compound. Through the test of dielectric strength in L$N_2$, polyimide film thickness of 125 ${\mu}{\textrm}{m}$ is selected as a insulating material. Electrical insulation and heat conduction are contrary to each other. Because of low heat conductivity of insulator and contact area between electrical insulator and heat conductor, thermal resistance of conduction-cooled system is increased. For the reducing of thermal resistance and the reliable contact between Polyimide and OFC, thermal compound or indium can be used As thermal compound layer is weak layer in electrical field, indium is finally selected for the reducing of thermal resistance. Thermal link is successfully passed the test. The testing voltage was AC 2.5kVrms and the testing time was 1 hour.

Effects of Samul-tang-gamibang against Focal Cerebral Ischemic Damage by Middle Cerebral Artery Occulusion of Rats (사물탕가미방이 백서의 좌우 중대뇌 동맥 폐쇄에 의한 뇌허혈 손상의 회복에 미치는 효과)

  • 서창훈;김영균;권정남
    • The Journal of Korean Medicine
    • /
    • v.25 no.1
    • /
    • pp.117-128
    • /
    • 2004
  • Objectives : This research was performed to investigate effect of Samul-tang-gamibang against focal cerebral ischemic damage after middle cerebral artery occlusion(MCAO). Methods : This research was used rats which were against focal cerebral ischemic damage by MCAO. It was used Zea Longa's theory and Belayev's methods to give rise to focal cerebral ischemic damage by MCAO. After 7days later, we drew out the brain and then had frozen and dyeing it and we had taken a picture to measure of the damaged area in each brain section. We determined the Neurological Index and tested the Foot-fault test and Roatated test to appraise the fall of motion ability result from cerebral ischemic damage. Results : The results of the experiment are as follows. 1. Samul-tang-gamibang reduced infarct size of sample group compared to control group at 7 day after MCAO. 2. Samul-tang-gamibang reduced infarct volume of sample group compared to control group at 7 day after MCAO. 3. Samul-tang-gamibang reduced foot-fault index of sample group compared to control group at 5,7 day after MCAO. Conclusions : Samul-tang-gamibang has protective effects against ischemic brain damage and had significant reduced infarct size and infarct volume of Rt-MCAO.

  • PDF

Detection and Diagnosis of Power Distribution Supply Facilities Using Thermal Images (열화상 이미지를 이용한 배전 설비 검출 및 진단)

  • Kim, Joo-Sik;Choi, Kyu-Nam;Lee, Hyung-Geun;Kang, Sung-Woo
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.1
    • /
    • pp.1-8
    • /
    • 2020
  • Maintenance of power distribution facilities is a significant subject in the power supplies. Fault caused by deterioration in power distribution facilities may damage the entire power distribution system. However, current methods of diagnosing power distribution facilities have been manually diagnosed by the human inspector, resulting in continuous pole accidents. In order to improve the existing diagnostic methods, a thermal image analysis model is proposed in this work. Using a thermal image technique in diagnosis field is emerging in the various engineering field due to its non-contact, safe, and highly reliable energy detection technology. Deep learning object detection algorithms are trained with thermal images of a power distribution facility in order to automatically analyze its irregular energy status, hereby efficiently preventing fault of the system. The detected object is diagnosed through a thermal intensity area analysis. The proposed model in this work resulted 82% of accuracy of detecting an actual distribution system by analyzing more than 16,000 images of its thermal images.

A Fast Contingency Screening Algorithm for On-line Transient Security Assessment Based on Stability Index

  • Nam, Hae-Kon;Kim, Yong-Hak;Song, Sung-Geun;Kim, Yong-Gu
    • KIEE International Transactions on Power Engineering
    • /
    • v.2A no.4
    • /
    • pp.131-135
    • /
    • 2002
  • This paper describes a new ultra-fast contingency screening algorithm for on-line TSA without time simulation. All machines are represented in a classical model and the stability index is defined as the ratio between acceleration power during a fault and deceleration power after clearing the fault. Critical clustering of machines is done based on the stability index, and the power-angle curve of the critical machines is drawn assuming that the angles of the critical machines increase uniformly, while those of the non-critical ones remain constant. Finally, the critical clearing time (CCT) is computed using the power-angle curve. The proposed algorithm is tested on the KEPCO system comprised of 900-bus and 230-machines. The CCT values computed with the screening algorithm are in good agreement with those computed using the detailed model and the SIME method. The computation time for screening about 270 contingencies is 17 seconds with 1.2 GHz PC.

The Development of Multi-Fault Restoration Algorithm for Distribution Network (배전계통 광역 정전복구 알고리즘 개발)

  • Jung, Jin-Soo;Lee, Seung-Jae;Jung, Jong-Wook;Lim, Young-Bae;Bae, Seok-Myung;Yi, Geon-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.3
    • /
    • pp.69-77
    • /
    • 2006
  • This paper presents the service restoration in electric power distribution systems. The aim of the service restoration is to control an emergency taken place in distribution systems and to restore out-of service areas as soon as possible when a fault occurs in distribution systems. For this reason, new service restoration strategies in multi-outage area are suggested in this paper. The suggested algorithm consist of two schemes. One is an individual restoration scheme, the other is an integrated restoration scheme. The former determines a restoration order of outage areas based on a restoration index. Unless the former scheme can generate a feasible restoration plan, the latter one will try to find out a new configuration without an overloaded section through tie exchange method.

An Expert System for Operational Aids of Security Control by Incorporation with Conventional Program Packages (기존 전산 프로그램 연계에 의한 신뢰도 제어 운전 지원을 위한 전문가시스템)

  • 문영현;최병윤;김세호
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.39 no.3
    • /
    • pp.240-246
    • /
    • 1990
  • The security control can be defined as all control actions and counter-measures to return the operating state of the system to a normal state. In an emergency state, fault clearing and/or overload suppression is enabled as a security control in order to prevent the extension of the fault. In the alert state, counter-measures should be set up in advance for the dangerous points of the system operation in drder to protect the system from expected accidents. In the normal state, the routine scenario is conducted to analyze system state. In the decision-making of the classification of system states, the heuristic and experienced knowledge can be well applied and thus application of expert system to this area attains considerable achievements. In this study, it is attempted to extract empirical rules through heuristic analysis and establish the knowledge base. Finally, the incorporation method with the conventional program packages in proposed. The expert system is designed to select an appropriate method and to perform the corresponding package. The input data can be automatically set up by using the data base. The computation results can be automatically added to the data base.

  • PDF

An Effective Algorithm for Diagnosing Sensor Node Faults (효율적인 센서 노드 고장 진단 알고리즘)

  • Oh, Won-Geun;Lee, Sung-Keun
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.10 no.2
    • /
    • pp.283-288
    • /
    • 2015
  • The possible erroneous output data of the sensor nodes can cause the performance limit or the degradation of the reliability in the whole wireless sensor networks(WSN). In this paper, we propose a new sensor node scheme with multiple sensors and a new fault diagnostic algorithm. The algorithm can increase the reliability of the whole WSNs by utilizing measurements of the multiple sensors on the node and by determining the validity of the date by comparing the value of each sensor. It can increase the cost and complexity of the node, but is suitable for the area where the high reliability is critical.

Analysis of Conductive Interference Around Substation Exclusively Fed by Cables Under Ground Fault Condition (도심지 변전소 지락사고시 인근 저항성간섭 영향 해석)

  • Choi Jong-kee;Lee Dong-il;Kim Jae-joon;Yoo Yeon-pyo;Jung Chang-soo;Kim Kyung-chul
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.12
    • /
    • pp.592-596
    • /
    • 2005
  • Recently, substations have been constructed in GIS (Gas Insulated Switchgear) and indoor type because of the increasing difficulties of securing locations. In case of urban substations, it is also common that the substations are exclusively fed by underground cables. Sometimes, the infrastructures in urban area, such as communication facilities, are located near substations to be constructed. In this paper, we examined such a case that a branch office building of KT(Korea Telecom) was located near 154 kV underground GIS substation under construction with about 100 meters of the lateral distance between two facilities. GPR (Ground Potential Rise) at the substation and the transferred earth potential at the KT building through the earth in SLG (Single-Line-to- Ground) fault condition were investigated based on a series of computer simulations. The calculated earth potential at a distance of 100 m from the substation was below 120 V which satisfying the limit value of 650 V.