A Study on Future System Construction Using WSCR Strengthness Index based on Python (Python 기반 WSCR 강건 지수를 이용한 미래계통 구축에 관한 연구)

  • Park, Seong-Jun;Hur, Jin;Kim, Hyun-Jin;Cho, Yoon-Sung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.8
    • /
    • pp.994-1001
    • /
    • 2018
  • In this paper, to studied about future power system construction using PSS / E-Python API. Python-based future system automatical construction methods and modeling of renewable sources. it confirmed the stability of the powert system for each renewable area by calculating the weighted short circuit ratio (WSCR) index. it calculated the short circuit ratio (SCR) and selected the transmission line linkage scenario to improve the stability of vulnerable areas. it confirmed the WSCR index improvement through the selected transmission line linkage of scenario, and analyzed the stability of the renewable power system applying the scenario. It describes Facts and Shunt devices adjustment for the load flow convergence. It describes the stable methed of the bus voltage through the transformer Ratio Tap adjustment. By performing PSS/E ASCC using the Python it was performed three-phase short circuit fault capacity analysis, it is confirmed whether excess of the fault current circuit breaker capacity. In order to contingency accident analysis, it have described the generation of one or two line list of each areas using the Python. The list is used to contingency analysis and describe the soluted of the transmission line overload through comparison before and after adding the scenario line.

A Study on Development of a New Algorithm to Solve Load Flow for Distribution Systems (배전계통조류계산을 위한 새로운 알고리즘에 관한 연구)

  • Moon, Young-Hyun;Yoo, Sung-Young;Choi, Byoung-Kon;Ha, Bock-Nam;Lee, Joong-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.918-922
    • /
    • 1998
  • With the development of industry, the qualitical advancement of power is needed. Since it is placed in the end step of power system, the fault at the distribution system causes some users blackout directly. So if the fault occurs, quick restoration is very important subject and, for the reason, induction of the distribution automation system is now being progressed briskly. For the quick restoration of the faulted distribution system, the load shedding of the blackout-area must be followed, and the other problems like the shedded load, faulted voltage and the rest may cause other accident. Accordingly load shedding must be based on the precise calculation technique during the distribution system load flow(dist flow) calculation. In these days because of its superior convergence characteristic the Newton-Raphson method is most widely used. The number of buses in the distribution system amounts to thousands, and if the fault occurs at the distribution system, the speed for the dist flow calculation is to be improved to apply to the On-Line system. However, Newton-Raphson method takes much time relatively because it must calculate the Jacobian matrix and inverse matrix at every iteration, and in the case of huge load, the equation is hard to converge. In this thesis. matrix equation is used to make algebraical expression and then to solve load flow equation and to modify above defects. Then the complex matrix is divided into real part and imaginary part to keep sparcity. As a result time needed for calculation diminished. Application of mentioned algorithm to 302 bus, 700 bus, 1004 bus system led to almost identical result got by Newton-Raphson method and showed constant convergence characteristic. The effect of time reduction showed 88.2%, 86.4%, 85.1% at each case of 302 bus, 700 bus system 86.4%, and 1004 bus system.

  • PDF

Design and Implementation of Web-based Home PNA Device Management System (웹 기반 Home PNA 장치 관리 시스템의 설계 및 구현)

  • An, Byeong-O;An, Seong-Jin;Jeong, Jin-Uk
    • The KIPS Transactions:PartC
    • /
    • v.8C no.6
    • /
    • pp.865-874
    • /
    • 2001
  • In this paper, we have designed and implemented Web based Home Phoneline Neworking Aliance(Home PNA)device management, system which can resolve the unfair bandwidth service form may subscribers and manage subscribes using these devices. To manage Home PNA device with Simple Network Management Protocol(SNMP) management elements are classified into system. Port performance, fault functional area based on Management Information Base(MIB) objects from Multi Dwelling Unit(MDU) devices MIB. System management provides configuration information of each MDU devices, and port management provides the current state of subscribes and performs filtering operation against the unauthorized users. And performance management provides traffic information about trunk and subscriber lines. Finally fault management provides fault logging fo the unexpected events and trap message from devices To verify the operability of the proposed system, we have tested it in real network environment.

  • PDF

Damage assessment of buildings after 24 January 2020 Elazığ-Sivrice earthquake

  • Nemutlu, Omer Faruk;Balun, Bilal;Sari, Ali
    • Earthquakes and Structures
    • /
    • v.20 no.3
    • /
    • pp.325-335
    • /
    • 2021
  • The majority of Turkey's geography is at risk of earthquakes. Within the borders of Turkey, including the two major active faults contain the North-Eastern and Eastern Anatolia, earthquake, threatening the safety of life and property. On January 24, 2020, an earthquake of magnitude 6.8 occurred at 8:55 p.m. local time. According to the data obtained from the stations in the region, peak ground acceleration in the east-west direction was measured as 0.292 g from the 2308 coded station in Sivrice. It is thought that the earthquake with a magnitude of Mw 6.8 was developed on the Sivrice-Puturge segment of the Eastern Anatolian Fault, which is a left lateral strike slip fault, and the tear developed in an area of 50-55 km. Aftershocks ranging from 0.8 to 5.1 Mw occurred following the main shock on the Eastern Anatolian Fault. The earthquake caused severe structural damages in Elazığ and neighboring provinces. As a result of the field investigations carried out in this study, significant damage levels were observed in the buildings since it did not meet the criteria in the earthquake codes. Within the study's scope, the structural damage cases in reinforced concrete and masonry structures were investigated. Many structural deficiencies and mistakes such as non-ductile details, poor concrete quality, short columns, strong beams-weak columns mechanism, large and heavy overhangs, masonry building damages and inadequate reinforcement arrangements were observed. Requirements of seismic codes are discussed and compared with observed earthquake damage.

An Object Recognition Performance Improvement of Automatic Door using Ultrasonic Sensor (초음파 센서를 이용한 자동문의 물체인식 성능개선)

  • Kim, Gi-Doo;Won, Seo-Yeon;Kim, Hie-Sik
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.54 no.3
    • /
    • pp.97-107
    • /
    • 2017
  • In the field of automatic door, the infrared rays and microwave sensor are much used as the important components in charge of the motor's operation control of open and close through the incoming signal of object recognition. In case of existing system that the sensor of the infrared rays and microwave are applied to the automatic door, there are many malfunctions by the infrared rays and visible rays of the sun. Because the automatic doors are usually installed outside of building in state of exposure. The environmental change by temperature difference occurs the noise of object recognition detection signal. With this problem, the hardware fault that the detection sensor is unable to follow the object moving rapidly within detection area makes the sensing blind spot. This fault should be improved as soon as possible. Because It influences safety of passengers who use the automatic doors. This paper conducted an experiment to improve the detection area by installing extra ultrasonic sensor besides existing detection sensor. So, this paper realize the computing circuit and detection algorithm which can correctly and rapidly process the access route of objects moving fast and the location area of fixed obstacles by applying detection and advantages of ultrasonic signal to the automatic doors. With this, It is proved that the automatic door applying ultrasonic sensor is improved detection area of blind spot sensing through field test and improvement plan is proposed.

TPC Algorithm for Fault Diagnosis of CAN-Based Multiple Sensor Network System (CAN 기반 다중센서 네트워크 시스템의 고장진단을 위한 TPC알고리즘)

  • Ha, Hwimyeong;Hwang, Yuseop;Jung, Kyungsuk;Kim, Hyunjun;Lee, Bongjin;Lee, Jangmyung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.22 no.2
    • /
    • pp.147-152
    • /
    • 2016
  • This paper proposes a new TPC (Transmission Priority Change) algorithm which is used to diagnose failures of a CAN (Controller Area Network) based network system for the oil tank monitoring. The TPC algorithm is aimed to increase the total amount of data transmission and to minimize the latency for an urgent message by changing transmission priority. The urgency of the data transmission has been determined by the conditions of sensors. There are multiple sensors inside of the oil tank, such as temperature, valve, pressure and level sensors. When the sensors operate normally, the sensory data can be collected through the CAN network by the monitoring system. However when there is a dangerous situation or failure situation happened at a sensor, the data need to be handled quickly by the monitoring system, which is implemented by using the TPC algorithm. The effectiveness of the TPC algorithm has been verified by the real experiments. In addition, this paper introduces a method that people can figure out the condition of oil tanks and also can perform the fault diagnosis in real-time by using transmitted packet data. By applying this TPC algorithm to various industries, the convenience and reliability of multiple sensors network system can be improved.

A Study on the Constructions of Fire Events Probabilistic Safety Assessment Model for Nuclear Power Plants (원자력발전소의 화재사건 확률론적안전성평가 모델 구축에 관한 연구)

  • Kang, Dae Il;Kim, Kilyoo
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.5
    • /
    • pp.187-194
    • /
    • 2016
  • A single fire event within a fire area can cause multiple initiating events considered in internal events probabilistic safety assessment (PSA). For an example, a fire event in turbine building fire area can cause a loss of the main feed-water and loss of off-site power initiating events. This fire initiating event could result in special plant responses beyond the scope of the internal events PSA model. One approach to address a fire initiating event is to develop a specific fire event tree. However, the development of a specific fire event tree is difficult since the number of fire event trees may be several hundreds or more. Thus, internal fire events PSA model has been generally constructed by modifications of the pre-developed internal events PSA model. New accident sequence logics not covered in the internal events PSA model are separately developed to incorporate them into the fire PSA model. Recently, many fire PSA models have fire induced initiating event fault trees not shown in an internal event PSA model. Up to now, there has been no analytical comparative study on the constructions of fire events PSA model using internal events PSA model with and without fault trees of initiating events. In this study, the changing process of internal events PSA model to fire events PSA model is analytically presented and discussed.

Estimation of probabilistic hazard for Bingol province, Turkey

  • Balun, Bilal;Nemutlu, Omer Faruk;Benli, Ahmet;Sari, Ali
    • Earthquakes and Structures
    • /
    • v.18 no.2
    • /
    • pp.223-231
    • /
    • 2020
  • Due to the fact that Bingöl province is at the intersection of the North Anatolian Fault and the Eastern Anatolian Fault, the seismicity of the region is important. In this study, probabilistic seismic hazard analyzes (PSHA) were conducted to cover the boundaries of Bingöl province. It occurred since 1900, the seismicity of the region was obtained statistically by considering the earthquake records with a magnitude greater than 4 and the Gutenberg-Richter correlation. In the study, magnitude-frequency relationship, seismic hazard and repetition periods were obtained for certain time periods (10, 20, 30, 40, 50, 75 and 100 years). Once a project area determined in this study, which may affect the peak ground acceleration according to various attenuation relationships are calculated and using the Turkey Earthquake Hazard Map, average acceleration value for Bingöl province were determined. As a result of the probabilistic seismic hazard analysis, the project earthquakes with a probability of exceeding 50 years indicate that the magnitude of the project earthquake is 7.4 and that the province is in a risky area in terms of seismicity. The repetition periods of earthquakes of 6.0, 6.5, 7.0 and 7.5 are 42, 105, 266 and 670 years respectively. Within the province of Bingöl; the probability of exceeding 50 years is 2%, 10% and 50%, while the peak ground acceleration values are 1.03 g, 0.58 g and 0.24 g. As a result, probabilistic seismic hazard analysis shows that the seismicity of the region is high and the importance of considering the earthquake effect during construction is emphasized for this region.

A Petrological Study on the Southwestern Contact Zone of the Boeun Granodiorite, Ogcheon Zone (보은화강섬록암(報恩花崗閃綠岩) 서남부(西南部) 접촉대(接觸帶)에 관(關)한 암석학적(岩石學的) 연구(硏究))

  • Lee, Dai Sung;Park, Jong Sim
    • Economic and Environmental Geology
    • /
    • v.14 no.2
    • /
    • pp.55-76
    • /
    • 1981
  • Southwestern contact zone of the Boeun granodiorite occurs near the thrust fault between the Ogcheon Group and Majeonri Limestone Formation. Ogcheon Group, metasediments composed of the Munjuri Formation, Changri Formation, and unconformably overlying Hwanggangri Formation, belongs to greenschist facies of regional metamorphism accompanied with deformation of two fold axes, $N10^{\circ}E$ and $N45-65^{\circ}E$ directions. Basic metamorphic rocks occurring in the Changri and Limestone Formations are the meta-basalts and meta-diabases of tholeiitic basalt series. The meta-basalts intruded in the Changri Formation as sills, whereas the meta-diabases in the Changri and Limestone Formations as stocks in appearance. They are considered to have emplaced before the formation of two fold axes and related with the thrust fault, based on the geologic setting of the area. The metamorphic facies are identified to be greenschist facies to epidote-amphibolite facies for the meta-basalt, and epidote-amphibolite facies for the meta-diabases. It is interpreted that such a variety of facies was related from the combination of earlier deuteric alteration and later regional metamorphism. The metasediments in southwestern contact zont of the Boeun granodiorite which is a product of later syntectonic intrusion of middle Jurassic in age, show pyroxene-hornfels facies near the contact and amphibole-horenfels facies away from the contact to the mineral zoning in the contact metamorphic aureole of the Limestone Formation, based on the paragenetic analysis of mineral assemblages. The Limestone in the area appears to be considerably $SiO_2-CaO-MgO-CO_2-H_2O$ can be adopted to evaluate equilibrium conditions of the mineral assemblages in each mineral zone. It is revealed that a temperature gradient was existed accross the contact aureole ranging from the higher igneous side to lower sedimentary side, whereas no clear trend of $XCO_2$ variation appears but high mole fraction. The tremolite diopside-quartz-calcite assemblages occurs in common through the most mineral zones of contact aureole that is in good agreement with the equivalent reaction curve which extends over a wide range of $T-XCO_2$ conditions.

  • PDF

Review of Technical Issues for Shield TBM Tunneling in Difficult Grounds (특수지반에서 쉴드TBM의 시공을 위한 기술적 고찰)

  • Jeong, Hoyoung;Zhang, Nan;Jeon, Seokwon
    • Tunnel and Underground Space
    • /
    • v.28 no.1
    • /
    • pp.1-24
    • /
    • 2018
  • The use of TBM (tunnel boring machine) gradually increases in worldwide tunneling projects. TBM machine are often applied to more difficult and complex geological conditions in urban area, and many problems and difficulties have been reported due to these geological conditions. However, in Korea, there is a lack of research on difficult grounds so far. This paper discussed general aspects of investigation method, and problems of TBM tunneling in difficult grounds. Construction cases that passed through the difficult grounds in worldwide were analyzed and the typical difficult grounds were classified into 11 cases. For each case, the definition and general problems were summarized. Particularly, for mixed ground and boulder ground, and fault zone, which are frequent geological conditions in urban area with shallow depth, classification system, investigation methods and major considerations were discussed, and proposed the direction of future research. This paper is a basic study for the development of TBM construction technology in difficult ground, and it is expected that it will be useful for related research and construction of TBM in difficult ground in the future.