• Title/Summary/Keyword: failure risk

Search Result 1,530, Processing Time 0.034 seconds

An Investigation of Quantitative Risk Assessment Methods for the Thermal Failure in Targets using Fire Modeling (화재모델링을 이용한 목표 대상물의 열적 손상에 대한 정량적 위험성 평가방법의 고찰)

  • Yang, Ho-Dong;Han, Ho-Sik;Hwang, Cheol-Hong;Kim, Sung-Chan
    • Fire Science and Engineering
    • /
    • v.30 no.5
    • /
    • pp.116-123
    • /
    • 2016
  • The quantitative risk assessment methods for thermal failure in targets were studied using fire modeling. To this end, Fire Dynamics Simulator (FDS), as a representative fire model, was used and the probabilities related to thermal damage to an electrical cable were evaluated according to the change in fire area inside a specific compartment. 'The maximum probability of exceeding the damage thresholds' adopted in a conservative point of view and 'the probability of failure' including the time to damage were compared. The probability of failure suggested in the present study could evaluate the quantitative fire risk more realistically, compared to the maximum probability of exceeding the damage thresholds with the assumption that thermal damage occurred the instant the target reached its minimum failure criteria in terms of the surface temperature and heat flux.

Development of a Failure Mode and Effects Analysis Based Risk Assessment Tool for Information Security

  • Lai, Lotto Kim Hung;Chin, Kwai Sang
    • Industrial Engineering and Management Systems
    • /
    • v.13 no.1
    • /
    • pp.87-100
    • /
    • 2014
  • Risk management is recognized as a significant element in Information Security Management while the failure mode and effects analysis (FMEA) is widely used in risk analysis in manufacturing industry. This paper aims to present the development work of the Information Security FMEA Circle (InfoSec FMEA Circle) which is used to support the risk management framework by modifying traditional FMEA methodologies. In order to demonstrate the "appropriateness" of the InfoSec FMEA Circle for the purposes of assessing information security, a case study at Hong Kong Science and Technology Parks Corporation (HKSTP) is employed. The "InfoSec FMEA Circle" is found to be an effective risk assessment methodology that has a significant contribution to providing a stepwise risk management implementation model for information security management.

Time-dependent reliability analysis of coastal defences subjected to changing environments

  • Chen, Hua-Peng
    • Structural Monitoring and Maintenance
    • /
    • v.2 no.1
    • /
    • pp.49-64
    • /
    • 2015
  • This paper presents a method for assessing the risk of wave run-up and overtopping of existing coastal defences and for analysing the probability of failure of the structures under future hydraulic conditions. The recent UK climate projections are employed in the investigations of the influence of changing environments on the long-term performance of sea defences. In order to reduce the risk of wave run-up and overtopping caused by rising sea level and to maintain the present-day allowances for wave run-up height and overtopping discharge, the future necessary increase in crest level of existing structures is investigated. Various critical failure mechanisms are considered for reliability analysis, i.e., erosion of crest by wave overtopping, failure of seaside revetment, and internal erosions within earth sea dykes. The time-dependent reliability of sea dykes is analysed to give probability of failure with time. The results for an example earth dyke section show that the necessary increase in crest level is approximately double of sea level rise to maintain the current allowances. The probability of failure for various failure modes of the earth dyke has a significant increase with time under future hydraulic conditions.

A Two-stage Reliability Demonstration Test for Mechanical Components (기계류부품 신뢰성보증을 위한 2단계 시험방식 설계)

  • Kwon, Young-Il
    • Journal of Korean Society for Quality Management
    • /
    • v.34 no.1
    • /
    • pp.20-26
    • /
    • 2006
  • In the fields of mechanical reliability application, "zero" or "zero or one" failure tests are most commonly used for demonstrating reliability of a product since they reduce test duration and/or sample size compared to other test methods that guarantees the same reliability of a product with a given confidence level or consumer's risk. The test duration of the "zero or one" failure test is longer than that of "zero" failure test but it has advantage of smaller producer's risk. In this paper a two-stage test is developed that compromises the "zero" and "zero or one" failure tests. The properties of the proposed two-stage test are investigated and the three test methods are compared using a numerical example.

Risk Priority Number using FMEA by the Plastic Moulding Machine (사출성형기의 고장모드 영향분석(FMEA)을 활용한 위험 우선순위)

  • Shin, Woonchul;Chae, Jongmin
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.108-113
    • /
    • 2015
  • Plastic injection moulding machine is widely used for many industrial field. It is classified into mandatory safety certification machinery in Industrial Safety and Health Act because of its high hazard. In order to prevent industrial accidents by plastic injection moulding machine, it is necessary for designer to identify hazardous factors and assess the failure modes to mitigate them. This study tabulates the failure modes of main parts of plastic injection moulding machine and how their failure has affect on the machine being considered. Failure Mode & Effect Analysis(FMEA) method has been used to assess the hazard on plastic injection moulding machine. Risk and risk priority number(RPN) has been calculated in order to estimate the hazard of failures using severity, probability and detection. Accidents caused by plastic injection moulding machine is compared with the RPN which was estimated by main regions such as injection unit, clamping unit, hydraulic and system units to find out the most dangerous region. As the results, the order of RPN is injection unit, clamping unit, hydraulic unit and system units. Barrel is the most dangerous part in the plastic injection moulding machine.

Development of Rock Slope Risk Rating System for the Determination of the Priority of Investment (도로절개면 투자우선순위 결정기법 개발)

  • 구호본;박혁진;민기복;정의진;김춘식;박성욱
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.411-418
    • /
    • 2000
  • With the limited amount of budget and time, it is required to determine the priority of investment when there are a large number of hazardous slopes. In this paper, the Rock Slope Risk Rating System is developed based on the combination of the hazard of failure and the damage potential. By applying the proposed rating system to 253 rock slopes in Korean National Highway, it was possible to determine the priority of investment on road cut slopes.

  • PDF

A Reliability Model of Process Systems with Multiple Dependent Failure States (다중 종속 고장상태를 갖는 공정시스템의 신뢰성 모델)

  • Choi, Soo Hyoung
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.6
    • /
    • pp.37-41
    • /
    • 2018
  • Process safety technology has developed from qualitative methods such as HAZOP (hazard and operability study) to semi-quantitative methods such as LOPA (layer of protection analysis), and quantitative methods are actively studied these days. Quantitative risk assessment (QRA) is often based on fault tree analysis (FTA). FTA is efficient, but difficult to apply when failure events are not independent of each other. This problem can be avoided using a Markov process (MP). MP requires definition of all possible states, and thus, generally, is more complicated than FTA. A method is proposed in this work that uses an MP model and a Weibull distribution model in order to construct a reliability model for multiple dependent failures. As a case study, a pressure safety valve (PSV) is considered, for which there are three kinds of failure, i.e. open failure, close failure, and gas tight failure. According to recently reported inspection results, open failure and close failure are dependent on each other. A reliability model for a PSV group is proposed in this work that is to reproduce these results. It is expected that the application of the proposed method can be expanded to QRA of various systems that have partially dependent multiple failure states.

Visualization analysis of the progressive failure mechanism of tunnel face in transparent clay

  • Lei, Huayang;Zhai, Saibei;Liu, Yingnan;Jia, Rui
    • Geomechanics and Engineering
    • /
    • v.29 no.2
    • /
    • pp.193-205
    • /
    • 2022
  • The face stability of shield tunnelling is the most important control index for safety risk management. Based on the reliability of the transparent clay (TC) model test, a series of TC model tests under different buried depth were conducted to investigate the progressive failure mechanism of tunnel face. The support pressure was divided into the rapid descent stage, the slow descent stage and the basically stable stage with company of the local failure and integral failure in the internal of the soil during the failure process. The relationship between the support pressure and the soil movement characteristics of each failure stage was defined. The failure occurred from the soil in front of the tunnel face and propagated as the slip zone and the loose zone. The fitted formulas were proposed for the calculation of the failure process. The failure mode in clay was specified as the basin shape with an inverted trapezoid shape for shallow buried and appeared as the basin shape with a teardrop-like shape in deep case. The implications of these findings could help in the safety risk management of the underground construction.

Sewer CCTV Inspection Prioritization Based on Risk Assessment (위험도 기반의 하수관로 CCTV 조사 우선순위 결정 연구)

  • Son, Jooyoung;Lee, Jaehyun;Oh, Jeill
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.3
    • /
    • pp.585-592
    • /
    • 2017
  • Most sewer lines buried in the city are likely to be collapsed due to serious aging. Also, due to the high concentration of development and high population density and traffic, the collapse of the sewer will cause enormous social and economic damage. Therefore, proactive maintenance is required to prevent accidents caused by deteriorated sewer pipe. In order to utilize limited budget effectively, risk-based prioritization methods should be proposed that simultaneously consider the consequence of failure and the probability of failure. In this study, the method of risk-based prioritization of sewer was examined by reviewing various cases of overseas studies and applied to the urban sub-catchment. First, the impact factors that can be secured through the sewer GIS DB in Seoul were derived, and the weight, sub-criteria, and impact score of each impact factor were determined and the consequence of failure was calculated by weight sum method. In addition, the probability of failure was calculated by dividing the service life by the estimated useful life, and the consequence of failure and the probability of failure were classified into five grades by the Jenks natural breaks classification method. The prioritization method was applied to sub-catchment in the Seoul to derive a risk matrix and a risk grade. As a result, 26% of all subjects were selected as the inspection priority subjects with 4-5 risk grade. Therefore, using the risk-based CCTV prioritization methodology, it will be possible to systematically determine the objects that need investigation first.

A Study on Uncertainty of Risk of Failure Based on Gumbel Distribution (Gumbel 분포형을 이용한 위험도에 관한 불확실성 해석)

  • Heo Jun-Haeng;Lee Dong-Jin;Shin Hong-Joon;Nam Woo-Sung
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.8 s.169
    • /
    • pp.659-668
    • /
    • 2006
  • The uncertainty of the risk of failure of hydraulic structures can be determined by estimating the variance of the risk of failure based on the methods of moments, probability weighted moments, and maximum likelihood assuming that the underlying model is the Gumbel distribution. In this paper, the variance of the risk of failure was derived. Monte Carlo simulation was peformed to verify the characteristics of the derived formulas for various sample size, design life, nonexceedance probability, and variation coefficient. As the results, PWM showed the smallest relative bias and root mean square error than the others while ML showed the smallest ones for relatively large sample siBes regardless of design life and nonexceedance probability. Also, it was found that variation coefficient does not effect on the relative bias and relative root mean square error.