• 제목/요약/키워드: facility environment area

검색결과 505건 처리시간 0.022초

근린 체육활동시설이 운동시간과 주관적 건강 수준에 미치는 영향 분석 - 국민생활체육참여실태조사(2013~2015) 자료를 중심으로 - (The Impacts of Neighborhood Sport Activity Facility on Exercise Time and Subjective Health Level - Focused on the National Sport Participation Survey (2013-2015) in Seoul, Korea -)

  • 기동환;이수기
    • 국토계획
    • /
    • 제53권6호
    • /
    • pp.19-38
    • /
    • 2018
  • The purpose of this study is to examine the impacts of neighborhood sports activity facilities on the exercise time and subjective health level using the National Sport Participation Survey data(2013-2015) in Seoul, Korea. We conducted path analysis including exercise time, subjective health level and various environmental factors. From the survey data, we extracted individual's characteristics including subjective health and exercise time. In addition, we calculated physical environment variables of neighborhood units. The results of this study are as follow. First, most of moderating variables such as gender, age, income and job showed expected relationships with exercise time or subjective health level. Second, the perceived level regarding neighborhood sports facilities such as public sports facilities had a strong positive association with exercise time and subjective health level. Third, the area of public sports facility, neighborhood park and the number of schools had positive effects on the exercise time and subjective health level. Lastly, land use mix and the number of intersections showed a positive effects on exercise time. To sum up, the results indicated that public sports facility, neighborhood park and perceived environment on neighborhood sports facility are critical factors of residents' exercise time and subjective health level.

ROADMOD를 이용한 도로청소 및 모래여과시설에 의한 고속도로에서의 강우시 TSS 저감효과 분석 (Removal Efficiency of TSS Loadings from Expressway by Road Sweeping and Sand Filter Facility Using ROADMOD)

  • 강희만;전지홍
    • 한국물환경학회지
    • /
    • 제39권1호
    • /
    • pp.38-45
    • /
    • 2023
  • In this study, the removal efficiency of road sweeping and sand filter facility for removing total suspended solid (TSS) as nonpoint source pollution from expressway was evaluated for the last 10 years (2012~2021) using ROADMOD. ROADMOD is a screening level model and was calibrated for runoff rate and TSS loading both at the inlet, which is the loading from the drainage area, and the outlet, from the sand filter facility. The drainage area is 715 m2 and the dimensions of sand filter facility are 1.5 m (wide) × 3.8 m (length) × 1.5 m (depth). The monitoring period for model calibration was the rainfall event during Aug. 31~Sep. 1, 2021 and the amount of rainfall was 74.5 mm. As a result of calibration, the determination coefficients (R2) of the flow rate were 0.66 and 0.86, for the inlet and outlet, respectively, and those of TSS loading were 0.50 and 0.84, for the inlet and outlet, respectively. Considering that ROADMOD is a screening level model, the calibration results were reasonable to evaluate the best management practices (BMPs) on the expressway. Using ROADMOD simulation results for 2012~2021, the average yearly runoff rate from the expressway was 82% and removal efficiency was 9% for road sweeping, 35% for sand filter facility, and 39% for both road sweeping and sand filter facility.

농촌생활환경정비 대상 시설항목의 선정: 정책적 제안 (The Policy Proposal for Selecting Facility-stems of Rural Living Environment Renewal Program)

  • 윤원근;이상문
    • 농촌계획
    • /
    • 제4권2호
    • /
    • pp.8-19
    • /
    • 1998
  • The problem of outdated and surplus facility-items in existing Rural Living Environment Renewal Program(RLERP) makes this study focus on restricting the range of facility sorts for the purpose of coㅁins with the changing rural living environment. In the four aspects of plan establishment, project implementation, comprehensiveness and linkage between programs, this study made an analysis of the existing RLERP that has 4-stage hierarchy, namely, Gun(county), Myun(primary administrative district), village and project site level Firstly, Myun and upper level policy programs fulfill the comprehensiveness and planning aspects, but have defects in the implementation and linkage aspects. Secondly, the village level programs satisfies more or less the four condition, but give rise to the problems of equity between the project target village and the non-target, and of generalization of the planning method applying to a specific village. At last, project level programs, controlled by several ministries, have defects in comprehensiveness and linkage aspects, exposing the sectoralism of central government. Above all, the existing RLERP has so many facility items, which have led to inefficient investment till now. Therefore, it's necessary that the environmental facilities should be selected(simultaneously reduced ), referring to following 5 criteria. (1) Exception of facilities relating to agricultural production. (2) Confined to public facilities to be constructed by government support. (3) Common-use facilities located in small town and below level area. (4) Consideration of not only the present need but also the future need of rural residents. (5) Reflection of a regional difference of mountain, plane and suburban area. Just 13 kinds of living environmental facilities are finally selected as the result of the selecting work, which can be an new alternative for RLERP. Concludingly, the selected facility items should be integrated into a designated project site by the prepared plan in order to enhance the efficiency of RLERP, investment and also to satisfy the four analytic aspects mentioned above.

  • PDF

대도시 종합병원의 15년간 규모 변화 - 2005년 이후 서울특별시 소재 종합병원의 병상수와 연면적 변화 (A Study on the Change of General Hospitals Size in Seoul during 15 years - Focused on General Hospitals bed and Gross Area in Seoul since 2005)

  • 조준영
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제28권1호
    • /
    • pp.53-61
    • /
    • 2022
  • Purpose: As the medical environment changes, the size of medical facilities continues to change. Of course, it is not easy to analyze the correlation between changes in the medical environment and changes in facility size in a rigorous scientific method. However, the results of investigating and analyzing changes in the size that occurred for any cause be able to serve as important references for future medical facility architectural plans. Methods: This study surveyed 68 general hospitals in Seoul for 15 years from 2005 to 2020. The change in the number of beds was investigated with data from the Ministry and Welfare. The gross area change was confirmed by analyzing the of all hospitals. Results & Implications: As a result of the survey, general hospitals in Seoul show a common phenomenon in which all hospitals except one case have expanded their size in the direction of increasing the gross area per bed over the past 15 years. However, in the method, a relatively small hospital with less than 500 beds mainly chose to reduce the number of beds. Large hospitals increased both the number of beds and the gross area, however showed a significant increase in the gross area.

초·중등학교시설의 노후도 평가 방법 (An Evaluation Method of Deterioration Level of Elementary, Middle, and High School)

  • 김형은;류한국
    • 교육녹색환경연구
    • /
    • 제16권2호
    • /
    • pp.44-53
    • /
    • 2017
  • 시설물의 유지관리란 시설의 구조적, 기능적, 미적성능을 보전하는 것이다. 이를 통하여 시설물을 이용하는 사람들의 일상적인 편의와 안전을 확보할 수 있도록 하여야 한다. 그러나 준공당시의 시설물은 시간이 지남에 따라 노후화되고 초기의 기능을 확보하는데 어려움을 갖게 된다. 현재 시 도교육청은 학교시설물의 유지관리를 비롯한 점검 및 관리를 형식적으로 수행하고 있어 재난발생위험에 적기대응이 곤란하고, 학교 시설에 대한 안전대책의 수립이 지연되는 등 관리가 부실한 실정이다. 또한 교육환경개선비가 배분기준과 달리 산정되는 등 비합리적으로 결정되고 있다. 이에 본 연구는 수많은 초 중등학교 시설물에 적용할 수 있는 동일하고 단순한 정량적 지표와 방법을 개발하여 객관적으로 학교 시설물의 노후도를 판단할 수 있는 방안을 제안하고 사례 연구를 통하여 검증하였다.

Dimethylsulfide as a Malordorous Component of a Waste Reclamation Site

  • Kim, Ki-Hyun;Lee, Gangwoong
    • Journal of Korean Society for Atmospheric Environment
    • /
    • 제15권E호
    • /
    • pp.39-43
    • /
    • 1999
  • To help idntify the potential sources of volatile organic sulfur compounds within the continental environment, we have conducted preliminary measurements of dimethylsulfide(DMS) during field campains held from three reference sites. These sampling sites were located within a waste reclamation facility in Won Ju City, Kang Won Province. The results of our measurements showed that DMS levels spanned over 1 to 55 pptv with a mean and 1 standard deviation(1SD) of 12 and 18 pptv(N=13). In a comparison of the data derived from the strongest sources, i.e., oceanic environment, the DMS levels in thre reclamation facility were jpronouncingly low with high day-to-night concentration ratios. It was noted that a significant difference in DMS levels between daytime and nighttime periods was mainly driven by a few exceptional data measured during daytime. Despite limitations of our measurement data in deriving meaningful interpretations of spatiotemporal distributions of DMS in inland facilities, the existence of extraordinary trends, i.e., especially "lower-than-expectedL" DMS values, can be explained in terms of mixed effects of several factors. Most importantly, we can infer that the rates of DMS production and of its destruction in the study site are at or near steady-state condition. Another possibility is that DMS is not adequate enough to explain the generally malordorous environment of reclamation sites, of particular in Won Ju area.n Ju area.

  • PDF

농촌지역 초·중등 교육시설에 대한 마을단위 접근성 평가 (Evaluation of Accessibility to Elementary and Secondary Educational Facilities on Village Level in Rural Areas)

  • 김솔희;김태곤;서교
    • 농촌계획
    • /
    • 제23권3호
    • /
    • pp.121-131
    • /
    • 2017
  • Although the educational facility are an important considerations on a social equity standpoint, educational environment in rural areas has been continuously deteriorated by numerous social problems such as decreasing birth rate and increasing of local school closing. The purpose of this study is to evaluate the accessibility of educational environment in rural areas on village level. First, we evaluate physical accessibility based on legally defined commuting distance. Second, the implication of village population of potential accessibility is analyzed. Lastly, the facility centrality index of each village is estimated for assessing the relations of educational accessibility. The main results of this study are as follows; (1) The accessibility of most villages in Pyeongchang-gun is vulnerable that 81.10% for elementary school, 73.17% for middle school, and 82.32% for high school, respectively; (2) The average commuting distance per student considering estimated number of students for each educational facilities indicated 2.75km for elementary school, 4.37km for middle school, and 5.79km for high school; (3) the facility centrality index is highly correlated to educational facilities but not to village population.

PREDICTION OF THE TRITIUM CONCENTRATION IN THE SOIL WATER AFTER THE OPERATION OF WOLSONG TRITIUM REMOVAL FACILITY

  • CHOI HEUI-JOO;LEE HANSOO;SUH KYUNG SUK;KANG HEE SUK
    • Nuclear Engineering and Technology
    • /
    • 제37권4호
    • /
    • pp.385-390
    • /
    • 2005
  • The effect of the Wolsong Tritium Removal Facility on the change of tritium concentration in the soil water was assessed by introducing a dynamic compartment model. For the mathematical modeling, the tritium in the environment was thought to come from two different sources. Three global tritium cycling models were compared with the natural background concentration. The dynamic compartment model was used to model the behavior of the tritium from the nuclear power plants at the Wolsong site. The source term for the dynamic compartment model was calculated with the dry and wet deposition rates. The area around the Wolsong nuclear power plants was represented by the compartments. The mechanisms considered in deriving the transfer coefficients between the compartments were evaporation, runoff, infiltration, hydrodynamic dispersion, and groundwater flow. We predicted what the change of the tritium concentration around the Wolsong nuclear power plants would be after future operation of the tritium removal facility to show the applicability of the model. The results showed that the operation of the tritium removal facility would reduce the tritium concentration in topsoil water quickly.

(주)동원 사북광업소 갱내수 정화를 위한 물리화학처리시설에 대한 연구 (A Study of Physicochemical treatment facility for Purifying the Mine Water in Dongwon Sabuk Mine., Ltd.)

  • 안종만;이용복;최상일
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제15권4호
    • /
    • pp.21-29
    • /
    • 2010
  • As the target area of this study, the coal mine site of Dongwon Sabuk mine.,ltd. is located in the remote mountainous region. To purify the acid mine water contaminated with heavy metals, a pilot-scale plant was built at the surrounded area of a mine shaft and operated to simulate active treatment system that could not only possibly setup the facility in a small available area, but also has a high efficiency. According to the various conditions of basin sequence, existence of sludge return, and lime injection position, six different types of treatment series were investigated in terms of treatment efficiency. As a result, the aluminum concentrations of the most effluents were in the range of 0.005~0.030 mg/L, which was too low to compare. The manganese concentration in the treated water were in the range of 3~9 mg/L, not following any regular trend. As found in the results of iron concentration, the case of addition of oxidation and sludge return steps showed higher efficiency than the others. As a standpoint of the installation of full-scale physicochemical treatment facility, the experimental results showed that the batch of oxidation and high density sludge return processes are existed and neutralization was followed by oxidation, had a stable treatment efficiency.

건축물의 중수도 설치기준에 대한 제도적 개선방안 (An Institutional Improving Standards for Water Reclamation/Reuse(WRR) System Establishment to Buildings)

  • 공영효
    • KIEAE Journal
    • /
    • 제6권3호
    • /
    • pp.43-48
    • /
    • 2006
  • This paper aims to suggest ways of institutionally improving standards that must be applied when installing Water Reclamation/Reuse (WRR) system based on efficiency analysis. Currently, the standard for WRR system establishment requires that the system should treat more than 10% of used water in the building of over $60,000m^2$ in total area of all floors, but our research has found that it would be more effective to change the standard to $150-m^3-per-day$ reclaimed water or the total area of all floors of $30,000m^2$ ($50,000m^2$ in the case of an office building). In other words, what this paper suggests is not a one-size-fits-all standard based on the total area of all floors, but a reasonable and flexible standard that takes into account efficiency and a unit water usage according to a building's purpose. Furthermore, this paper recommends a new WRR standard that can be applied to large-scale land development for housinglots, like the New Town. The recommendation is based on the economic analysis that the WRR system will ensure efficiency only if the amount of reclaimed water is over 4,000 tons per day, which corresponds to 4 millions square meters of housinglots. Regarding the size of the established facility, this paper suggests changing the standard, which is now set at over 10% of water usage, to what is relative to the total amount of use of reclaimed water in order to ensure efficiency and promote use of reclaimed water. In addition, this paper proposes that governmental support should be offered not only to facility owners, who are recipients at present, but also to facility builders. By doing so, those who donate a facility to the government, central or local, after building it, can be provided with substantial aid. Therefore, the application of the institutional improvement suggested in this paper is expected to create environment-friendly living conditions and boost the quality of life by encouraging people to secure water resources efficiently in buildings, and in a wider range, in cities.