• Title/Summary/Keyword: facility

Search Result 11,396, Processing Time 0.032 seconds

FMEA for CNS Facility and Cause Analysis of Shutdown Events to Improve Reactor Availability (원자로 이용률 향상을 위한 냉중성자원 시설의 고장모드영향분석 및 정지이력의 원인분석)

  • Lee, Yoon-Hwan;Hwang, Jeong Sik
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.5
    • /
    • pp.115-120
    • /
    • 2020
  • From 2009 when the CNS facility was installed, the number of reactor failures due to abnormal CNS facility system has increased significantly. Of the total of 19 nuclear reactor shutdowns over the six years from 2009 to 2019, there were 10 nuclear reactor shutdowns associated with the CNS facility, which are very numerous. Therefore, this report intends to analyze the history of nuclear reactor shutdowns due to CNS facility system failure in detail, and to present the root cause and solution to problems. As a result of FMEA implementation of CNS facility system, a total of 76 SPVs were selected. In addition, 10 cases of reactor shutdown history due to CNS facility system abnormalities were analyzed in detailed, and improvement plans for solving the root cause and problem were suggested for each trip history. The results of this study are expected to be able to operate the domestic research reactor and CNS facilities more stably by providing effective measures to prevent recurrence of CNS facilities and reactor trips.

BIM based Construction Project Case Analysis for Facility Life Cycle Management from the Perspective of the Client (발주처 관점의 시설물 생애주기 관리를 위한 BIM 기반 건설 프로젝트 사례 분석)

  • Ham, Nam-Hyuk;Kim, Woong-Gi;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.10 no.3
    • /
    • pp.12-21
    • /
    • 2020
  • From the perspective of the client, the value of information for use in facility management is very low at the point of use. This is because the facility owner, who is a non-professional, cannot accurately request necessary information from the perspective of long-term facility life cycle management. The purpose of this study is to define the information necessary for facility management and to analyze the project operation method to procur this information to the client using BIM. To this end, this study analyzed the role of client and contractor, project delivery process, standards, and submissions in the BIM-based procurement area through USACE Air Force Hospital project case analysis. As a result of the analysis, if the client, who is the subject of facility operation, defines in advance the type and input method of necessary information in the operation stage, the client can receive the BIM optimized for operation from the contractor. The results of this study can be used to establish standards for receiving information necessary for establishment of procurement process and facility management of public institutions considering BIM introduction.

Studies on Post Contract Schedule Analysis (준공현장의 분쟁해결방안으로서의 사후적 공정분석에 관한 연구)

  • KIHYUK, KO;SUNGPIL, PARK;YONGKIL, KIM
    • Journal of Arbitration Studies
    • /
    • v.32 no.4
    • /
    • pp.103-141
    • /
    • 2022
  • Traditionally, schedule analysis in Korea has been used, mainly through the Critical Path Method, to evaluate the claim for extension of time and/or the amount of liquidated damages for delay. Critical path method, however, cannot identify the delay event and its impact occurred in non-critical path especially in multi facility projects. In multi facility projects that comprise several independent but related facilities or structures, each facility has its own facility critical path the duration of which will be impacted by facility specific critical delays. Thus, only through the non-critical delay analysis along with the critical delay analysis damages not attributable to contractors may be remedied in full. Because all the records and pictures can reveal what has actually happened in post contract review, only the retrospective analysis rather than the prospective analysis based on the assumptions can establish the cause and allocate the each parties' responsibilities appropriately.

A Study on the Development of Facility Model for Safety Training Class in School (학교 내 안전체험교실의 시설모형 개발 연구)

  • Park, Sung-Chul;Ahn, Yoo-Jeong;Song, Byung-Joon;Cho, Jin-ll
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.16 no.2
    • /
    • pp.19-33
    • /
    • 2017
  • The purpose of this study is to derive education programs for safety training class, create unit spaces and present components and methods of utilizing the spaces for the development of facilities models closely related to various policy, operation plan and facility construction projects promoted by related institutions such as the Ministry of Education, schools, architects and companies. This study is divided into five steps. First, we reviewed the literature related basic directions for safety education and facility plan, second, field survey included both field conditions such as spatial size and facility configuration and analysis of operating conditions like hours of operation and personnel. Base on literature review and field survey, it were used to analyze strengths and weaknesses of existing safety training classes, and five facility models was developed based on the Delphi method and expert participatory design. The result show that the facility models (drafts) of safety training class were developed as follows: (1)the facility model for traffic safety(pedestrian safety, vehicle safety, subway safety) (2)the facility model for first aid(emergency rescue, how to report) (3)the facility model for disaster safety(fire evacuation safety, life earthquake safety) (4)the facility model for elevator safety(elevator safety, escalator safety) (5)the facility model for drugs and violence safety (smoking drinking, sexual harassment safety, food safety) The safety training class can be composed by combining or separating each module according to affordable space size of each school.

TC1 (C8orf4) is involved in ERK1/2 pathway-regulated G1- to S-phase transition

  • Wang, Yi-Dong;Bian, Guo-Hui;Lv, Xiao-Yan;Zheng, Rong;Sun, Huan;Zhang, Zheng;Chen, Ye;Li, Qin-Wei;Xiao, Yan;Yang, Qiu-Tan;Ai, Jian-Zhong;Wei, Yu-Quan;Zhou, Qin
    • BMB Reports
    • /
    • v.41 no.10
    • /
    • pp.733-738
    • /
    • 2008
  • Although previous studies have implicated a role for TC1 (C8orf4) in cancer cell proliferation, the molecular mechanism of its action is still largely unclear. In this study, we showed, for the first time, that the mRNA levels of TC1 were upregulated by mitogens (FBS/thrombin) and at least partially, through the ERK1/2 signaling pathway. Interestingly, the over-expression of TC1 promoted the $G_1$- to S-phase transition of the cell cycle, which was delayed by the deficiency of ERK1/2 signaling in fibroblast cells. Furthermore, the luciferase reporter assay indicated that the over-expression of TC1 significantly increased Cyclin D1 promoter-driven luciferase activity. Taken together, our findings revealed that TC1 was involved in the mitogen-activated ERK1/2 signaling pathway and positively regulated $G_1$- to S-phase transition of the cell cycle. Our results may provide a novel mechanism of the role of TC1 in the regulation of cell proliferation.

A Comparison Analysis on the Facility Standards and Campus Sizes of the National Universities in Korea and Japan (한·일 국립대학 시설 기준 및 캠퍼스 면적 비교·분석)

  • Choi, Hyeong Ju
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.18 no.3
    • /
    • pp.1-15
    • /
    • 2019
  • This study analyzes universities in Japan, which haves many similarities with those in Korea in certain aspects of the educational system and a common problem of reduced university admission resources, Korea's national university facility standards, policy related to nation-level university facility, and practical campus case. Through this, the study aims to examine the difference in the national approach and basic philosophy about university facilities in Korea and Japan, and also identify the major planning factors and improvement directions when establishing plans for university campuses in the future. The results of this study are as follows. First, Korea tends to promote policies related to university facilities by individual projects centered on a major pending problem or issue, while Japan has been shown to promote national university facility policies under a comprehensive mid-to-long-term plan by establishing a maintenance plan aimed at national university facilities every five years. Second, In the case of the university facility areas, the average university facility area of the examined universities in Japan is about 5.6% larger than the average university facility area in Korea. Additionally, the university facility area per student in Japan is about 13% wider than that of Korea. The total floor area of university facilities in Japan is also about 20.7% larger than that of Korea, and the university facility area per student in Japan is about 56.7% wider than that of Korea as well. Among support facilities, the total floor area of dormitories in Korea was 2.5 times wider than that of Japan, however, the acceptance rate of dormitory in Korea was 5.6% higher than Japan. Third, the university facility criteria items and systems of two countries are similar. but there are slight differences in the content such as the method of calculating student capacity, division classification, and the method of calculating the number of teachers.

A Mixed Zero-One Integer Goal programming Approach to Facility Location-Allocation Problem with Multiple Objectives (혼합이진정수목표계획법(混合二進整数目標計劃法)을 이용(利用)한 다수목표(多数目標)의 설비입지선정(設備立地選定) 및 해당문제(該當問題)에 관(関)한 연구(硏究))

  • Gang, In-Seon;Yun, Deok-Gyun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.10 no.2
    • /
    • pp.45-50
    • /
    • 1984
  • This paper is concerned with the facility location-allocation problem (FLAP) with multiple objectives. A branch-and-bound procedure is presented to solve the mixed zero-one integer goal programming problem which is to determine facility locations from given candidate locations and to allocate facility capacity to given customer markets simultaneously. A numercial example is given to illustrate this procedure.

  • PDF

Biotechnological Potential of Marine Cyanobacteria in Wastewater Treatment: Disinfection of Raw Sewage by Oscillatoria willei BDU130511

  • Uma, L.;Selvaraj, K.;Manjula, R.;Subramanian, G.;Nagarkar, Sanjay
    • Journal of Microbiology and Biotechnology
    • /
    • v.12 no.4
    • /
    • pp.699-701
    • /
    • 2002
  • The current study demonstrates the ability of the marine cyanobacterium Oscillatoria willei BDU130511 to disinfect raw sewage. Within a holding time of 3 h under laboratory conditions, the organism drastically reduced in the total bacterial and coliform counts at various pH levels, in both unbuffered and buffered sewage, thereby suggesting a potential role for cyanobacteria in wastewater treatment.

A Study on the Improvement of Electric Supervisory in Apartment Complex (아파트 단지의 전력감시반 개선 연구)

  • 홍규장;김채규
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 1993.10a
    • /
    • pp.51-54
    • /
    • 1993
  • In this paper, it is proposed the the SCADA(Supervisory control and Data Acquisition) system in Apartment complex. The proposed SCADA system make use of the computer CRT(Cathod RAy Tube), which automatically observe the Electrical Facility, Elvator Facility, Fire Alarm Facility and process in the real-time data. In order to improve the hardware performance and the information process, the SCADA system composed of master-slave topology and decentralized the supervisory Facility. This system is expected the retrenchment of construction expenditure and the level-up of supervisory execution.

  • PDF

Application of the Cross Decomposition Method for a Dynamic Capacitated Facility Location Problem (시설용량의 제한이 있는 동적 입지선정문제를 위한 교차분해 기법의 응용)

  • 김승권;김선오
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.15 no.1
    • /
    • pp.23-35
    • /
    • 1990
  • A mathematical model for a dynamic capacitate facility location problem is formulated by a mixed integer problem. The objective of the model is to minimize total discounted costs that include fixed charges and distributed costs. The Cross Decomposition method of Van Roy is extended and applied to solve the dynamic capacitated facility location problem. The method unifies Benders Decomposition and Lagrangean relaxation into a single framework. It successively solves a transportation problem and a dynamic uncapacitated facility location problem as two subproblems. Computational results are compared with those of general mixed integer programming.

  • PDF