Park, Kyung-Chul;Ryu, Si-Kyun;Lee, Sung-Mo;Son, Sang-Hoon
Journal of Korean Society of Transportation
/
v.26
no.1
/
pp.103-112
/
2008
In the feasibility analysis, Braess' Paradox results in the negative social benefit in spite of adding transportation facilities. Consequently, it has been difficult to judge on the investment of SOC projects. This research aims to analyze the Braess' Paradox in the feasibility analysis and to seek a remedy for the Paradox. Several experiments were conducted on the simple network under the various conditions. From the experiments, following findings were validated: Braess' Paradox occurred only if travel demands met within certain intermediate range. In terms of traffic assignment method, the SO was more likely to reduce the effect of the Braess' Paradox than the UE. However, the Braess' Paradox in the benefit of operating cost saving occurred in all cases and the paradox in the total benefit continued. In order to solve the problem, new link cost function considered travel time and operating cost simultaneously were suggested. As a result, the negative benefit was significantly decreased in the UE case and total negative benefit was no longer shown in the SO case through the analysis.
This project sought to conduct an economic feasibility study regarding the commercial production of bio-hydrogen by the marine hyperthermophilic archaeon, Thermococcus onnurineus NA1 using carbon monoxide-containing industrial off-gas. We carried out the economic evaluation of the bio-hydrogen production process using the raw material of steel mill by-product gas. The process parameter was as follows: $H_2$ production rate was 5.6 L/L/h; the conversion of carbon monoxide was 60.7%. This project established an evaluation criterion for about 10,000 tonne/year. Inflation factors were considered as 3%. The operating costs were recalculated based on prices in 2014. The total investment required for development was covered 30% by capital and 70% by a loan. The operation cost for the 0.5-year test and integration, and the cost for the first three months in the 50% production period were considered as the working capital in the cost estimation. The costs required for the rental of office space, facilities, and other related costs from the construction through to full-scale production periods were considered as continuing expenses. Materials, energy, waste disposal and other charges were considered as the operating cost of the development system. Depreciation, tax, maintenance and repair, insurance, labor, interest rate charges, general and administrative costs, lubrication and miscellaneous expenses were also calculated. The hydrogen price was set at US$ 4.15/kg for the economic evaluation. As a result, the process was considered to be economical with the payback period of 6.3 years, NPV of 18 billion Won and IRR of 26.7%.
Korean Journal of Construction Engineering and Management
/
v.16
no.4
/
pp.41-49
/
2015
The amount of energy consumed in air ventilation systems of public facilities accounts for 40% of their total energy consumption. To reduce their energy consumption, applying variable speed operation controlled by an inverter with a high-efficiency motor is suggested. Since these methods require higher initial investment costs compared to the existing systems, economic evaluation should be conducted from a long-term perspective. While LCCA(Life Cycle Cost Analysis) model is useful to estimate net savings of alternatives that differs with respect to initial costs and operating costs, the environmental burdens are not considered. On the contrary LCA(Life Cycle Assesment) model is suitable to assess environmental impacts associated with the stages of a product's life but it does not consider costs. In this study, the high-efficient motors are introduced into the air ventilation system of a subway station and a comprehensive analysis on the economic and environmental impacts of the proposed method is conducted by using LCCA and LCA model.
Korean Journal of Construction Engineering and Management
/
v.7
no.6
/
pp.141-150
/
2006
As the law on the private sector investment in social infrastructure was amended in January of 2005, the government is aggressively promoting BTL projects but many trials and errors and problems are occurring. Especially, the Value-For-Money evaluation conducted by the responsible agencies to judge the appropriateness of the project found there was a conspicuous difference between the computed cost and the final contract sum. Accordingly, this study is aimed to grasp the problems in the current Value-For-Money evaluation and to improve it in order to proceed with BTL projects efficiently. To achieve this, through a relative comparison to the final contract sum, a clear standard for the items of Value-For-Money evaluation was presented and thus, a model that can ensure accuracy in computing the Value-For-Money was established so that a delay in negotiations can be avoided. If the Value-For-Money evaluation established in this study is used in assessing the appropriateness of unit prices for BTL projects for education facilities, a reasonable result can be expected to be drawn in selection and negotiations with contractors, and maintenance and Post-Operation-Evaluation(POE) of education facilities as well.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.19
no.2
/
pp.187-192
/
2019
Hybrid power storage system with emergency power function for demand management and power outage minimizes the investment cost in the building of buildings and factories requiring emergency power generation facilities, We propose a new business model by developing technology that can secure economical efficiency by reducing power cost at all times. Normally, system power is supplied to load through STS (Static Transfer Switch), and PCS is connected to system in parallel to perform demand management. In order to efficiently operate the electric power through demand forecasting, the EMS issues a charge / discharge command to the ESS as a PMS (Power Management System), and the PMS transmits the command to the PCS controller to operate the system. During the power outage, the STS is rapidly disengaged from the system, and the PCS becomes an independent power supply and can supply constant voltage / constant frequency power to the load side. Therefore, it is possible to secure reliability through verification of actual system linkage and independent operation performance of hybrid ESS, By enabling low-carbon green growth technology to operate in conjunction with an efficient grid, it is possible to improve irregular power quality and contribute to peak load by generating renewable energy through ESS linkage. In addition, the ESS is replacing the frequency follow-up reserve, which is currently under the charge of coal-fired power generation, and thus it is anticipated that the operation cost of the LNG generator with high fuel cost can be reduced.
Journal of Institute of Control, Robotics and Systems
/
v.7
no.10
/
pp.867-873
/
2001
The purpose of this study is to find analytic solution of determining the optimal capacity (lot-size) of multiproduct acyclic multistage production and inventory system to meet the finished product demand under the constraint of finite intermediate storage. Intermediate storage is a practical way to mitigate the material flow imbalance through the line of supply and demand chain. However, the cost of constructing and operating storage facilities is becoming substantial because of increasing land value, environmental and safety concern. Therefore, reasonable decision-making about the capacity of processes and storage units is an important subject for industries. The industrial solution for this subject is to use the classical economic lot sizing method, EOQ/EPQ(Economic Order Quantity/Economic Production Quantity) model, incorporated with practical experience. But EOQ/EPQ model is not suitable for the chemical plant design with highly interlinked processes and storage units because it is developed based on single product and single stage. This study overcomes the limitation of the classical lot sizing method. The superstructure of the plant consists of the network of serially and/or parallelly interlinked non-continuous processes and storage units. The processes transform a set of feedstock materials into another set of products with constant conversion factors. A novel production and inventory analysis method, PSW(Periodic Square Wave) model, is applied to describe the detail material flows among equipments. The objective function of this study is minimizing the total cost composed of setup and inventory holding cost. The advantage of PSW model comes from the fact that the model provides a set of simple analytic solutions in spite of realistic description of the material flows between processes and storage units. the resulting simple analytic solution can greatly enhance the proper and quick investment decision for the preliminary plant design problem confronted with economic situation.
Water disasters such as flash floods and inundation caused by localized heavy rainfall in urban areas have a large impact on climate change but are also closely related to the increase in impervious areas as pointed out in domestic and international studies. It is difficult to secure natural green areas in urban areas that have already been developed. So, urban regeneration can be expected using water management optimized with technologies to secure infiltration and storage capacity such as Low-Impact Development technology. In this study, the water cycle improvement ability was confirmed by applying the LID technology within the district unit plan of the environmentally friendly village, and the economic feasibility of LID application was analyzed by estimating the costs and benefits of installing the facilities. The site was planned to conserve sufficient green and plans for securing the watershed infiltration and storage capacity were formulated with the application of additional LID technology, such as infiltration trenches, rain barrels and permeable pavements. The LID design method applicable to the site was established, and the water balance of the watershed was analyzed through simulations of the SWMM model. The water circulation improvement effect was confirmed through the water balance analysis, and the cost-benefits were determined according to the estimation method, and the economic analysis was conducted. This study confirms that the investment of LID technology is economically feasible for the hydrological improvement effect of the housing complex.
In this study, RPS system, one of the renewable energy support systems, is utilized for economic analysis of solar generation equipment and the fuel cost savings plan for controlled horticulture farms with high fuel-cost dependency and facility applicability were evaluated. On the exterior of the upper layer of glass greenhouse (9917$m^2$) of controlled horticulture farms using bunker C oil, half of the area (4958$m^2$) was utilized for theoretical installation and operation of 450kW-level solar power generator, and as the result, first, the effect of investment cost only of solar generation system was found to be quite excellent, but it was analyzed that there were limits to saving the fuel costs of the controlled horticulture farms. Second, when geothermal system was first introduced in the farm and solar system was additionally introduced, it was analyzed that the effect of introducing solar system was excellent. In order to apply such effects to the sites of farming, partial supplementation of RPS system which is being uniformly applied regardless of the purpose of renewable energy is necessary. When the subject of use directly install facilities where it is directly connected to national added-value such as food security created by the farming industry, it is necessary to introduce appropriate system that corresponds to such. Moreover, it was studied that the quick development of demonstrative complex that can practically evaluate the applicability of renewable energy in farming industry and interest and preparation of related institutions in financial support structure for its site application would lead to success.
Korean Journal of Construction Engineering and Management
/
v.8
no.1
s.35
/
pp.96-106
/
2007
This study aims to evaluate the financial impact of construction firms' business diversification. Specifically, from the construction firms' perspective, this study attempted to present basic investment model by analyzing the effect of investment in residential facilities for retired seniors. Analyses results indicated that the financial impact, in terms of sales volume and gross profit, varies according to the size of firms. The results drawn from this study could be a valuable source when construction firms plan to invest and operate residential facility for retired seniors in order to diversify their business portfolio and stabilize financial structure.
In this study, The Virtual Power Plant (VPP) solution platform considered in this study minimizes the cost and investment risk associated with the construction of power generation and transmission facilities. In addition, it includes a Demand Response (DR) program operation function to meet consumers' electricity demand. With the introduction of VPP, it is possible to provide more eco-friendly and efficient power by responding to changes in consumer load in real time through existing generators and DR programs without large-scale facility investment in power generation and transmission/distribution sectors. In order to link the communication device to the solar power and ESS linkage device, it is necessary to transmit data in the control/state between the device device and the edge system and develop an IoT device and interworking platform (OneM2M).
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.