• 제목/요약/키워드: expected total cost

검색결과 427건 처리시간 0.034초

A CBR-BASED COST PREDICTION MODEL FOR THE DESIGN PHASE OF PUBLIC MULTI-FAMILY HOUSING CONSTRUCTION PROJECTS

  • TaeHoon Hong;ChangTaek Hyun;HyunSeok Moon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.203-211
    • /
    • 2009
  • Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.

  • PDF

측정오차를 고려한 $\bar{x}$ -S 관리도의 경제적 설계 (The Economic Design of $\bar{x}$ -S Chart Considering Measurement Error)

  • 유영창;강창욱
    • 산업경영시스템학회지
    • /
    • 제23권61호
    • /
    • pp.89-98
    • /
    • 2000
  • For statistical process control, the process data are collected by the measurement system. But, the measurement system may have instrument error or/and operator error. In the measured values of products, the total observed variance consists of process variance and variance due to error of measurement system. In this paper, we design more practical T-s control chart considering estimated measurement error The effects of measurement error on the expected total cost and design parameters are investigated.

  • PDF

Replacement Policy for Equipments that Cumulatively Deteriorate

  • Yun Deok K.;Park Kyung S.
    • 한국국방경영분석학회지
    • /
    • 제7권2호
    • /
    • pp.100-113
    • /
    • 1981
  • A replacement policy for a finite time span is proposed for the cumulative process where an item can fail only when the total amount of deterioration exceeds a prespecified failure level. The optimal deterioration limit level is determined to minimize the total cost expected per unit for a given time span. An illustrative example in case of periodically inspected reformer tubes in ammonia plant is also presented.

  • PDF

경년별 총비용을 고려한 공동주택의 리모델링 시기 추정에 관한 연구 (A Study on the Estimation of Optimum Remodeling Period for Apartment Buildings using Total Cost)

  • 손창백;오치돈
    • 한국건설관리학회논문집
    • /
    • 제6권2호
    • /
    • pp.111-119
    • /
    • 2005
  • 일반적으로 공동주택의 수명은 50년이지만, 보통 20년이 경과하면 철거되거나 재건축되어 경제적인 낭비를 초래하고 있다. 이에 본 연구는 LCC이론을 기초로 초기투자비와 경과년수에 따른 유지관리비용의 합이 최소가 되는 시점을 추정 $\cdot$ 분석하여 공동주택의 적정 리모델링 시기를 도출함을 목적으로 하였다. 본 연구의 결과를 보면 내용년수 50년까지의 건축물의 생애 총유지관리비용의 합은 초기투자비의약 4.69배가 되고, 공동주택의 적정 리모델링 시기는 할인율 $4.17\%$를 적용했을 경우 30년으로 파악되었으며 서울시에서 발표한 법정허용년수인 40년이 경제수명으로 설정되려면 할인율은 $6.122\%$가 설정되어야 한다. 또한 할인율 변동에 따른 민감도 분석결과 할인율이 감소할 경우 적정 리모델링 시기는 연장되며, 증가할 경우 단축되는 것으로 나타났다. 이에 본 연구의 결과는 공동주택의 철거 또는 재건축 시기를 예측할 수 있으며, 보수 및 대수선의 적절한 시기를 예측하여 공동주택의 수명을 최대한 연장시킬 수 있는 기초자료로 활용될 수 있을 것으로 기대한다.

무료 이단계 보증에 대한 최적의 보증 정책 (Optimal Warranty Policy for Free Two-phase Warranty)

  • 정기문
    • 통합자연과학논문집
    • /
    • 제17권2호
    • /
    • pp.43-51
    • /
    • 2024
  • Jung et al.(2015) suggest the two-phase warranty model, which is a general type of warranty model. Under the two-phase warranty, the warranty period is divided into two intervals, one of which is for renewing replacement warranty, and the other is for minimal repair warranty. And warranty policies play a very important role in product marketing. In this paper, we suggest the optimal warranty policy for free extended two-phase warranty. To determine the optimal warranty period, we adopt the expected profit per unit product. So, the expressions for the total expected cost, the sale price and the expected profit per unit product from the manufacturer's point of view are derived. Also, we discuss the optimal warranty period and the numerical examples are provided to illustrate the proposed the warranty policy.

컨테이너 터미널에서 자동화 야드 크레인이 설치된 블록의 설계 (Designing Container Blocks with Automated Rail-Mounted Gantry Cranes in Container Terminals)

  • 이병권;김갑환
    • 대한산업공학회지
    • /
    • 제35권1호
    • /
    • pp.73-86
    • /
    • 2009
  • This paper discusses a method of determining the optimal design of a block. A horizontal layout of blocks is assumed in which transfer points are located at a side of the block. Each block has several transfer points (TPs) each of which is assigned to a group of adjacent bays and located at the center of the assigned group. The goal is to find the optimal size of a block and the optimal number of TPs while minimizing the total cost consisting of the fixed and operational cost of yard cranes (YCs), the operational cost of internal trucks, and the installation cost of TPs. Constraints on the maximum expected system time of trucks are imposed for the optimization. Formulas for estimating handling operation cycle times of a YC are derived analytically. Numerical experiments are conducted to illustrate optimal block designs for a given set of data.

B2S궤도시스템의 초기 시설 투입비용 분석 (Initial Investment Cost Analysis of Facilities of B2S Track System)

  • 김효산;민준호;유재광;이달재
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.733-739
    • /
    • 2011
  • B2S(Ballasted track To Slab track) that is track system has been first developed in 2004 with foundation of rich experience and know-how of subway track upkeep and mending of facilities in 36 years to improve an existence pebble track at a concrete track. 'B2S' is admitted technology through patent registration in the domestic and Europe and it's made by a factory and put together at field, so it's able to construct precisely and to reduce a construction period. In addition, safety, the ecological balance and durability are excellent, and walking, cleaning, etc. has the advantage of easy maintenance. 'B2S' is currently laying 27.7km at Seoulmetro as of end of 2010 standard, but it'll be expected to be applied to a domestic Metro more from now on. It is possible to classify the total cost resolution structure of B2S system by R&D cost, test production and experiment cost, the initial facility cost, maintenance cost, disposal cost. In this research, it seems useful for selection evaluation which considered the life cycle cost or economics of the concrete track structure by analyzing an initial cost of facilities.

  • PDF

도시철도 콘크리트궤도의 유형별 초기시설 투입비용 분석 (Initial Input Cost Analysis by Different Construction Types of Slab Tracks in Urban Railway)

  • 김효산;유재광;민준호;한동은;이달재
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.400-405
    • /
    • 2011
  • The total length of Korean urban railways reaches 1,200km. Urban railway used to be installed with ballasted tracks by reason of low cost at the time of construction, slab tracks are now being installed due to the reasons of the improvement in safety, lengthening service life and more economical method in terms of maintenance. The length rate of slab tracks has exceeded 70% of the domestic urban railways with the methods ranging from STEDEF, LVT, ALT, Eidan-type, B2S to RHEDA. This study surveyed the share of domestic slab tracks, and compared and evaluated the input cost at the initial stage by the types of slab tracks. Construction processes have been standardized by the existing design documents and calculated the initial input cost for the length of 1km of a hypothetical straight line. Cost breakdown structure was evaluated as materials cost, construction cost, equipment cost, indirect cost, etc. It is expected that this study will be used in selection & evaluation which is considering the economic feasibility of slab tracks.

  • PDF

A Simple Interactive 3D Interior Design Application for Living Room - Cost Management

  • Winnie, Chin;Hui, Saw Seow;Gee, Yap Seok
    • Journal of Multimedia Information System
    • /
    • 제4권3호
    • /
    • pp.157-162
    • /
    • 2017
  • The title of this project is "A Simple Interactive 3D Interior Design Application for Living Room - Cost Management", focusing on developing an application that enables costing and designing to be executed concurrently in interior design phases. This is because any changes made at costing phase after design phase is completed, it will potentially lead to unnecessary increase in cost and time. Therefore, the objective of this project is aimed to devise a cost management module to be included in the proposed application, allowing interior designer to make cost-based decision at the designing phase itself. This can be achieved through its proposed functions which include total cost update, budget management, cost estimator calculator and material list generation. The methodology being proposed in this project is Prototyping Development, categorized under Rapid Application Development (RAD), by starting off with planning, analysis, design and implementation phases are performed concurrently and repeatedly in a cycle to produce a prototype until the application is completed. In the end of this project, the developed prototype is expected to contribute a better solution towards cost management in interior design.

전력품질을 고려한 수용가 모선 가격 계산 (Customer Nodal Cost Calculation considering Power Quality)

  • 정성원;박인덕;김재현;이근준
    • 조명전기설비학회논문지
    • /
    • 제21권3호
    • /
    • pp.82-87
    • /
    • 2007
  • 본 논문은 수용가에 대한 전력요금이 각 모선별로 부과될 경우 모선들의 전력품질을 측정하여 이를 비용화할 수 있다고 가정하였다. 이를 계통계획에 반영하여 예상되는 비용은 샘플계통을 통하여 다음과 같은 계산 방법을 제안하였다. 먼저 모선가격을 계산하기 위해서는 계통에서 전력설비의 운전조건은 최적조류계산에 의해 최적화되어 있는 상황으로 가정하여 모선가격[$/MVAH]을 산정하고, 계통의 각 모선에 연결된 부하들의 연중 발생하는 고장에 의해 탈락되는 피해비용을 산출하였다. 결과적으로 제안된 방법은 전력품질을 포함한 모선 총합 비용을 계산시 매우 효과적이였다.