For the deep excavation in urban area, the braced-cut method is mainly adopted. In this case, inadequate consideration of ground water level may result in wrong prediction of structural behavior. In this study, the effects of hydraulic interaction between wall and grout were investigated using the finite element method. The maximum stress in case of confined ground water condition is obtained at the final excavation stage in the range of 70~80% of excavation depth. The stress of impermeable case is about 50% larger than that of permeable case. When the relative permeabililty of wall-grout become smaller, the stress is getting bigger. And the stress tends to converge in case of 1/100 or less of the relative permeability.
한국지반공학회 1990년도 PROCEEDINGS OF THE FIRST KOREA-JAPAN JOINT GEOTECHNICAL SEMINAR ON EXCAVATION and TUNNELING IN URBAN AREAS
/
pp.97-110
/
1990
This paper presents a case history of a deep open cut excavation of Nakagawa section for Futuoka Subway construction which adopted observational mettled against boiling failure and completed with success by modifying construction based upon field monitoring. One of the difficult conditions for the excavation was sandy layer with high water pressure which was anticipated boiling failure. The boiling was generally considered as one of the difficult phenomena to work with the observational method because of its unpredictable catastrophic nature. Laboratory experiments showed the existence of the prefailure movements of the ground and the possibility of the application of the observational method against the boiling failure. Construction step was planned to be modified, if necessary, based upon field monitoring and was completed with success.
The calculation of earthwork plays a major role in the plan or design phase of many civil engineering projects, such as seashore reclamation; and thus, it has become very important to improve upon its accuracy. There have been common drawbacks to earlier methods of ground profiling, such as dialing with sharp corners or the grid points of any tow straight lines. In this paper, we prepose an algorithm for finding a terrain surface using the natural boundary conditions and the both direction spline method, which interpolates the given three-dimensional data by using spline. As a result of this study, the algorithm of the proposed two methods to estimate pit excavation volume should provide a better accuracy than Spot height, Chambers, Chen, or Lin method. Also, the mathematical model mentioned offers maximum accuracy in estimating the volume of a pit excavation.
터널 굴착으로 인한 지반의 거동 분석은 대변형 영역의 거동을 고려해야 한다. 따라서 본 논문에서는 TBM 터널 굴착으로 인한 주변 지반에 대한 영향을 실제 현장 조건과 동일 조건에서 분석하기 위하여 대변형 유한요소 해석을 수행하였다. 지반의 대변형 거동을 모사하고 예측함에 있어 가장 널리 활용되는 두 가지 해석 기법 - coupled Eulerian Lagrangian (CEL)과 auto-remeshing (AR) 기법 - 을 적용하여 TBM 굴착 과정을 모사하였고 그에 따른 주변 지반에 발생하는 손상영역의 범위를 예측하였다. 굴착손상영역의 범위는 두 기법을 통해 도출된 결과와 굴착손상영역을 정의하는 실험적인 기준을 종합하여 추정하였다. 해석 결과, 두 대변형 해석 기법을 이용하여 도출된 굴착손상영역은 서로 비슷한 크기로 수렴하였고, 기존 연구의 실험 및 계측을 통해 확인된 굴착손상영역 크기와 모양, 경향과도 일치하는 것으로 나타났다. 굴착 되는 지반의 RMR 등급이 좋을수록 굴착손상영역의 크기는 더 커지고, 터널의 직경과는 정비례하는 것으로 나타났다. 반면에, 터널의 심도가 깊을수록 지반의 구속압이 커져서 굴착손상영역은 상대적으로 작게 형성되는 것으로 확인되었다.
The Observational Method proposed by Terzaghi can be applied for the safe and economic construction projects where the exact prediction of the behavior of the structures is difficult as in the underground excavation. The method consists of measuring lateral displacement, ground settlement and axial force of supports in the earlier stage of the construction and back analysis technique to find the best fit design parameters such as earth pressure coefficient, subgrade reaction etc, which will minimize the gap between calculated displacement and measured displacement. With the results, more reliable prediction of the later stage can be obtained. In this study, back analysis programs using the Direct Method, based on the Hill Climbing Method were made and evaluated, and to overcome the limits of the method, Genetic Algorithm(GA) was applied and tested for the actual construction cases.
본 논문에서는 기존의 불연속 변형 해석(DDA) 방법에 대한 세가지 방향의 새로운 개선 방법들이 제시되었다. 이 개선 방법들은 암반 균열에서 암석 블록과 지하수 흐름의 수리-역학적 커플링, 연속적인 하중 재하 또는 제하, 그리고 록볼트, 숏크리트와 콘크리트 라이닝에 의한 보강으로 구성되었다. Shi (1988)와 Lin (1995)에 의한 기존 DDA 프로.그램은 이 방법들에 의하여 추가로 개선되었으며, 이 새로운 DDA프로그램에 대한 몇 가지 적용예들이 제시되었다. 또한, 경부고속철도 공사의 일부인 운주 터널의 지하굴착에 대한 시뮬레이션을 통하여 절리를 통한 지하수의 흐름, 굴착순서, 그리고 록볼트와 숏크리트에 의한 보강이 터널안정에 미치는 영향을 연구하였다. 그 결과 절리를 통한 지하수의 흐름과 부적절한 굴착순서는 터널의 안정성에 악영향을 미치나, 한편 록볼트와 숏크리트에 의한 보강은 터널을 안정화 시킨다는 사실을 밝혀냈었다. 그 결과 세가지 개선방법이 추가된 DDA프로그램은 지하구조물 설계에 있어서 유용한 해석방법으로 사용될 수 있다는 사실을 보여주었다.
In the case where the bottom of railroad is penetrated by non-excavation construction method, the design is performed based on the assumption that there is no displacement and no change of stress However, measurement data showed that reduction of earth pressure and relaxation of stress take place by the displacement. In this study, we investigated the earth pressure on the structure under the railroad constructed by a non-excavation method and the stress relaxation region. The design based on earth pressure is non-economical because it is an over design. Relaxation of stress may lead to road base settlement and rail irregularly due to the reduced railroad supporting stiffness, to ballast crack in the case of concrete roadbed. The result showed that it is reasonable to set the stress on the structures as active earth pressure not as earth pressure at rest. Additionally, the study on the stress relaxation region identified the regions that should be supported in future construction by a non-excavation method.
Sheathing work used for excavation in a crowded downtown is generally a temporary strut method using H-piles and sheathing wall includes lagging, CIP, SCW or slurry wall. A temporary strut serving the support for sheathing wall acts to resist the earth pressure, but it shall be removed when installing the underground structure members. A traditional temporary strut might cause the stress imbalance of the sheathing wall when it is demolished, resulting in time extension and the risk of collapse. A traditional temporary strut method thus needs to be improved for schedule and cost reduction, risk mitigation and for preparation for potential civic complaint. A permanent strut method doesn't require installing and demolishing the temporary structure that will lead to reducing the time and cost and the structural risk during the demolition process. And given the girder, the part of the underground structure, serves the role of strut, it can secure the wider interval compared to the traditional method, which enables to secure the wider space for the convenience of excavation as well as enhance the constructability and efficient site management. The thesis was intended to study the composite girder designed to use the strut as permanent structure so as to reduce the excavation and floor height.
당 현장 주변에 보안물건이 위치하고 있어, 기존 설계상에 176m 구간이 무진동 기계식 굴착공법으로 설계되었으나, 시공성 및 경제성 향상을 위하여 전자뇌관 미진동 발파공법을 제안하였다. 검토 결과, 발파소음, 진동 모두 허용기준 이내의 안전성을 확보하여 해당 구간에 대하여 전자뇌관 미진동 발파공법 적용 가능성을 확인하였다. 아울러 검토 구간에서 무진동 굴착공법과 전자뇌관 미진동 발파공법을 비교한 결과, 공사 기간을 88일 단축하여 경제적으로 큰 이점이 있는 것으로 평가되었다.
일반적으로, 지반의 굴착은 주변지반의 응력해방에서 응력재배치 과정을 거치는 동안 지반변형을 포함한 여러가지 토질공학적 문제를 수반하게 된다. 이러한 문제들은 특히, 밀집된 고분건물사이에 새로운 건물을 건축하기 위한 굴착을 하는 경우, 인접한 기존건물의 안정과 연관된 문제들을 유발하게 되어 굴착방법이나 시공관리에 있어서 많은 기술적인 노력을 필요로 한다. 본 연구는 이와 같은 문제들을 수반하는 사질토 지반에서의 깊은 굴착문제를 다루고 있는데, 연구대상지역은 상기와 같이 기존건물 및 부속시설이 굴착면에 매우 근접하여 있고, 신축건물의 기초가 신접건물의 기초보자 아래에 위치하는 특징을 내포하고 있다. 본고에서는 이러한 현장특성을 갖는 굴착지반에 대하여 탄소성 유한요소해석을 수행, 지반변상를 예측하였고, 계측 System을 도입하여 지표, 수중수평변이, 건물거동 등을 측정, 굴착에 따른 변형 특성을 고찰하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.