• Title/Summary/Keyword: excavation method

Search Result 1,056, Processing Time 0.026 seconds

Study on the Structural Safety for the Non-Open excavation method by Using Steel Tubular Roof (대구경 강관을 이용한 비개착공법의 구조적 안전성에 대한 연구)

  • Kim, Kyong-Gon;Kim, Kyeong-Hwan;Kim, Hyo-Jin;Lee, Sang-Ho
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.4
    • /
    • pp.49-57
    • /
    • 2009
  • The development and use of underground space in the city have been expanded considerably worldwide due to the growing population and traffic. Because the construction of underground causes some problems including traffic jam and safety accidents, the non-open excavation construction method are commonly used. NTR (New Tubular Roof) method which is one of the non-open excavation method is investigated in this study. The structural safety of underground structures by using NTR method is evaluated by ANSYS 9.0. The tubular roof according to diameters are analysed by ANSYS 9.0 at critical construction step. Finally, according the diameter and thickness of tubular roof the stress nad dispacement are analyzed and then the The efficient use of tubular roof is suggested from relationship between tubular's thickness and stress condition.

  • PDF

Experimental Study on Load Transfer Characteristic by Adjacent Slope Excavation in a Jointed Rock Mass (절리암반에서 근접 사면굴착에 의한 하중전이특성에 대한 실험적 연구)

  • Lee, Jin-Wook;Lee, Sang-Duk
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.2
    • /
    • pp.321-328
    • /
    • 2009
  • A optimal reinforcement in the joint rock slope excavation adjacent to an existing tunnel would be influenced by excavation distance from the tunnel, slope angel, and joint conditions but has been empirically determined so far. In this study, large scale model tests were conducted to find out the relationship between load translation on the excavation surface and bebavior of the tunnel according to excavation steps of the jointed rock slope. Consequently, two main parameters, joint dip and sloped angle were investigated in those model tests. From the test results, it was found that tunnel deformation was the largest one when the excavation of joints located closer to the tunnel crown or invert. Stability of the slope and the tunnel were varied in a certain excavation stage related to the angle of slope. In the future, based on results of this study the reinforcement method for the tunnel and slope safety in a jointed rock mass will be demonstrated.

A preliminary study on the excavation sequence of a room-and-pillar underground structure by the drill-and-blast method (발파 굴착에 의한 주방식 지하구조물의 굴착공기 분석 연구)

  • Lee, Chulho;Hyun, Younghwan;Song, Junho;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.605-614
    • /
    • 2015
  • A room-and-pillar underground structure is characterized by its grid-type array of room and pillar. As a result, its construction and economical efficiency can be governed by excavation sequence. In this study, the construction period by the drill and blast method which can be treated as a main sequence for excavation was examined by considering the regulation for blasting and construction standard of estimation in Korea. To evaluate the construction period for the room-and-pillar underground structure constructed in 4 kinds of square-type area ($30{\times}30{\sim}57{\times}57m$), the concurrent excavation pattern which was suggested in the previous researches was used. From the suggested condition, the total construction period by drill-and-blast method can be estimated with the consideration of the construction area, number of jumbo drill and faces in operation.

A Study on the Prediction of Risk Degree of Side Collapes Due to Excavation (기초굴착에 따른 측면붕괴의 위험성 예측에 관한 연구)

  • 강준묵;한승희;이재기
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.9 no.1
    • /
    • pp.17-25
    • /
    • 1991
  • A foundation excavation is necessarily included in construction works of structures. Involving the dangers of collapse, large-scaled excavation walls require periodic deformation measurements. As only relative displacements and acquired and surface measurements can not be made with the conventional measuring methods, the up-to-date method which can overcome these weaknesses is required urgently. Terrestrial photogrammetry is the method by which absolute deformation amounts of many points can be taken out at a distance from object in short time. The objective of this study is to suggest application propriety of terrestrial photogrammetry to the measurement of excavation walls. For it, we devised same position photography(S.P.P) and possibility of SPP proved through basic experiment. SPP was very speedy photographing method. We found out the fact that as the degree of overlap increase, accuracies of results increase. As a result of applying to excavation side-wall, we detected consistent displacement in 3 dimension each direction within the limits expectional accuracy. If control surveying could be carried out more quickly and accurately, the deformation displacement could be analyzed more effectively.

  • PDF

The Reinforcement Method and Stability Analysis of Cut Slopes (절토사면의 안정해석과 보강방법)

  • 지인택;이달원
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.39 no.1
    • /
    • pp.112-121
    • /
    • 1997
  • The aim of this study was to analyze the slope stability relating to the failure of cut slopes and the characteristics of stress-strain relations obtained by limit equilibrium method, finite element method, and stereographic projection method for the reinforced cut slopes. The following conclusions were made : 1.To use stereographic projection method led to little possibility to take the toppling and wedge failure while to use the other methods led to the failure. It was recommended to reduce the slope inclination from 1:1 to 1: 1.5~1 :1.8 and adopt coir mesh method to protect the slope surface. position with the horizontal displacement after final excavation moved to the excavation base. The maximum shear strain values concentrated at the excavation base indicated the possibility to induce the local failure. 3. It was recommended that the slope inclination for blast rock with the slope height larger than l0m was 1: 0.5, 1:1, and 1: 1~1 :1.5 for hard rocks, soft and ordinary rocks, and ripping and soils, respectively. 4. Berm width criteria for blast rock with the slope height larger than l0m were recommended as follow : 2~3m per 20m slope height for hard rocks, 1 ~2m per l0m slope height for soft and ordinary rocks, 1 ~ l.5m per 5m slope height for ripping and soils.

  • PDF

Effect of the Permeability of Excavation Wall on the Earth Pressure in a Jointed Rock Mass

  • Son, Moorak;Adedokun, Solomon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.2
    • /
    • pp.13-21
    • /
    • 2018
  • The magnitude and distribution of earth pressure on the excavation wall in jointed rock mass were examined by considering different wall permeability conditions as well as rock types and joint inclination angles. The study was numerically extended based on a physical model test (Son & Park, 2014), considering rock-structure interactions with the discrete element method, which can consider various characteristics of rock joints. This study focused on the effect of the permeability condition of excavation wall on the earth pressure in jointed rock masses under a groundwater condition, which is important but has not been studied previously. The study results showed that the earth pressure was highly influenced by wall permeability as well as rock type and joint condition. Earth pressure resulted from the study was also compared with Peck's earth pressure in soil ground, and the comparison clearly showed that the earth pressure in jointed rock mass can be greatly different from that in soil ground.

Determination of a large shield TBM for a tunnel under the Han river in the Bundang railway (분당선 철도 한강 하저터널에서 대구경 쉴드장비 선정)

  • Kim, Yong-Il;Kim, Dong-Hyun;Cho, Sang-Kook
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.569-578
    • /
    • 2003
  • In this paper a determination of the optimal excavation method and machine type for a tunnel under the Han river between the Sungsoo-dong, Sungdong-Gu and the Chungdaw-dong, Kangnam-Gu in the Bundang railway. The geological investigation results show that some fractured zones exist locally under the northern boundary of the Han river bed, but the other regions consist mostly of hard rocks of good quality in the tunnel excavation level. Also, a hign water pressure of $5kgf/cm^2$ and a flash inflow of river water due to old boring holes are expected during tunnel excavation. A EPB shield TBM is selected as a optimal excavation machine for the Han river tunnel considering the geological and ,site conditions.

  • PDF

Damage Assessment of Buried Pipelines due to Deep Excavation-Induced Ground Movements (지반 굴착 시 지반 거동에 따른 매설관 손상 평가)

  • Yoo, Chung-Sik;Choi, Byoung-Seok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.765-774
    • /
    • 2004
  • This paper presents a damage assesment method for buried pipelines subjected to Deep Excavation-induced ground movements. Ground deformation characteristics resulting from 3D finite element analysis was represented mathematically by a hyperbolic tangential function. A parametric study was performed on excavation depth and burial position of pipeline. The result of the parametric study indicate that length of hyperbolic tangential function affects the results of damage assessment. Using numerical studies for buried pipeline response to ground movements by relative flexibility of the pipe-soil system. The result of numerical studies are presented in forms of design charts which can be readily used for various condition encountered in practices.

  • PDF

Research on Calculation of Ventilation Airflow in Underground Excavation Workings using Diesel Equipments (디젤장비를 사용하는 지하굴착 작업장의 입기량 산정방법 연구)

  • 김복윤;조영도
    • Tunnel and Underground Space
    • /
    • v.5 no.1
    • /
    • pp.48-56
    • /
    • 1995
  • Recently, most of the underground excavation works are adopting heavy duty mobile diesel equipments which have outstanding merits in view of efficiency. However, these equipments are causing hygienic problems to the workers due to the various hazardous exhaust contaminants. Considering that there are always dead end workings in underground excavation sites, it is very important how to supply enough airflow to the workings to dilute diesel exhaust contaminants. This paper introduced the theoritical mechanism and actual trends of exhaust contaminants of diesel equipments under operation at local mines and suggested the design method of intake air volume in underground excavation workings using diesel equipments.

  • PDF

Stability Analysis of the Light Weight Earth-Retaining Structure in the Trench Excavation (트렌치 굴착에 있어서 경량 흙막이 구조체의 안정성 해석)

  • Seo , Sung-Tag;Heo , Chang-Han;Kim , Hee-Duck;Jee , Hong-Kee
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.46 no.2
    • /
    • pp.93-103
    • /
    • 2004
  • In trench excavation, essential factor of earth-retaining temporary work structure should be easy taking to pieces and movement, and dead weight must be less. This paper studies about the light weight material and application as earth-retaining structure to prevent the slope failure of sand soil ground caused by the variation of groundwater level in trench excavation. That is, light weight earth-retaining structural is proposed and a simulation with FEM on application of proposed structural in sandy soil is presented. The results are summarized as follows; (1) The study proposed FRP H-shaped pannel for the light weight member, and also presented estimation method about stability. (2) Mechanical property (bending moment, shear force, axial force, displacement) were changed according to groundwater level, but these values had been within enough safety rate and allowable stress. Therefore, proposed light weight pannel with FRP is available for bracing structure in trench excavation.