• Title/Summary/Keyword: excavation face

Search Result 254, Processing Time 0.025 seconds

Analysis of Fault Attitudes by Using Trajectories of the Maximum Longitudinal Displacement on Tunnel Face (터널 굴진면 최대 수평변위의 변화 양상에 따른 단층 자세 분석)

  • Yun, Hyun-Seok;Seo, Yong-Seok
    • The Journal of Engineering Geology
    • /
    • v.26 no.3
    • /
    • pp.393-401
    • /
    • 2016
  • In the present study, fault attitudes and the locations of appearance of faults in tunnel faces were predicted by analyzing the trajectory of the maximum longitudinal displacement immediately before the appearance of faults through three-dimensional finite element analysis. A total of 28 fault attitude models were used in the analysis. Those faults that have drives with dip appear first in the upper part of tunnel faces as tunnel excavation progresses and their maximum longitudinal displacement shows a tendency to move from the middle part to the upper part of tunnel faces. Those faults that have drives against dip appear first in the lower part of tunnel faces as tunnel excavation progresses and their maximum longitudinal displacement shows a tendency to move from the middle part or middle upper part to the lower part of tunnel faces. In addition, when the dip of faults is larger the maximum longitudinal displacement moves from the left upper part toward the wall part in the case of drive with dip models and from the left lower part toward the wall part in the case of drives against dip models. Therefore, it was indicated that the attitudes of faults distributed ahead of tunnel faces and the locations where faults appear in tunnel faces can be predicted by analyzing the longitudinal displacement trajectory of tunnel faces following excavation.

Case Study for the Improvement of Tunnel Advance Rate & the Time Reduction of Working Process in Long Hole Blasting About Tunnel Excavation (터널 장공발파에서 굴진율 개선 및 작업공정 시간 단축 사례)

  • Kim, Hee-Do;Lee, Jun-Won;Lee, Ha-Young
    • Explosives and Blasting
    • /
    • v.31 no.2
    • /
    • pp.32-39
    • /
    • 2013
  • Generally, The way of long hole blasting is carried out in coal-face, basic excavation for dam, mine etc. Recently, this long hole blasting has been implemented in civil engineering for efficiency & economic feasibility. National express no.600 of Pusan outer high-express ${\bigcirc}$ construction site with four lanes of the length of 8km was also a site applied by long hole blasting. But After blasting, tunnel advance rate is less than 75%. As a result of that, Follow-up working time is influenced. Thereby, The total of working process is significantly so increased that planned excavation cannot be implemented many times. For not only improve excavation rate but reduce working process time in job site, we introduce blasting case which apply the ${\phi}36mm$ explosive suited for high desity of charging among long hole blasting in order to overcome mentioned problem.

Suggestion of empirical formula between FPI and specific energy through analysis of subsea tunnel excavation data (해저 터널 굴진자료 분석을 통한 FPI와 비에너지의 경험식 제시)

  • Kim, Kyoung-Yul;Bae, Du-San;Jo, Seon-Ah;Ryu, Hee-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.4
    • /
    • pp.687-699
    • /
    • 2018
  • The construction of subsea tunnel differs from that of inland tunnel because of high water pressure due to sea water level and difficulties to reinforce the ground under construction. Therefore, it is very important to prevent trouble in advance when the subsea tunnel is constructed. In this paper, we established lots of databases about characteristics of geological and mechanical parameters on the construction of subsea tunnel using micro slurry TBM which depth is about 60 m. The correlation analysis is conducted to confirm the effect of thrust, torque and RPM among the excavation database on the net penetration rate. Also, An empirical formula is suggested to predict the net penetration rate through the correlation analysis between FPI (Field Penetration Index) and specific energy from the subsea tunnel excavation database.

Prediction of Ground Condition Changes Ahead of Tunnel Face Using Three-Dimensional Absolute Displacement Analysis (터널 3차원 절대변위 해석기법을 이용한 막장전방지반 예측)

  • Bang, Joon-Ho;Han, Il-Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.2
    • /
    • pp.101-113
    • /
    • 2006
  • Arching effect occurs around the unsupported excavation surface near to tunnel face when a tunnel is excavated in a stable rock mass. If a weak fracture zone exists in front of tunnel face, a displacement occurs between tunnel face and weak fracture zone due to stress concentration. If three-dimensional absolute coordinates (longitudinal, transverse, vertical direction) is measured at tunnel face by geodetic method, the ground change in front of the tunnel face can be predicted by analysing three-dimensional absolute displacement. The purpose of this study is to verify the analysis method of three-dimensional absolute displacement by comparing the trend of displacement ratio at crown and sidewall of tunnel and the influence line/trend line of crown settlement compared with TSP results in the same section.

  • PDF

Application of Tunnel Information Management System and Tunnel Collapse Inference System in Tunnel (터널 정보관리 시스템과 터널 붕락 예측 시스템 적용성 연구)

  • 마상준;서경원
    • Journal of the Korean Society for Railway
    • /
    • v.5 no.2
    • /
    • pp.84-92
    • /
    • 2002
  • For an efficient management and analysis of geological/geotechnical data obtained during site investigations or tunnel construction, Tunnel Information System(TIS) was developed in this study. TIS is running in CIS(Geographical Information System) which has a spatial data. TIS consists of two parts, the Tunnel Face Mapping System(FaceMap), to record a geological features by observations and measurements at the surface of the excavation, the Borehole Data Management System(BDMS), to store the different types of rock data related to boreholes. Using the database of collapsed tunnels, 20 in Korea and 84 in Europe and with an artificial neural network, an expert system was developed for inferring the tunnel collapse pattern and its volume. And by applying Geo-predict, the system developed, in tunnels under construction, observed data from the $\bigcirc$$\bigcirc$tunnl site was compared and analyzed.

A Study on Characteristics of the Unit Skin Friction Using the Wall Roughness in the Soft Rock (연암부 벽면거칠기를 이용한 단위주면마찰력 특성에 관한 연구)

  • Hong, Seok-Woo;Hwang, Geun-Bae
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.12
    • /
    • pp.7-13
    • /
    • 2019
  • In the case of the drilled shaft, one of the methods for calculating unit skin friction stress of rock socket parts is to measure the roughness of the excavated face. This method is to estimate the unit skin frictional resistance using a device which measures the roughness shape of the excavated face in the excavation step. In this study, the roughness shapes of the face of the rock socket part in the drilled shaft were measured directly in the perforated hole and the results are used to identify the characteristics of the unit skin friction of the bedrock. In addition, the static load test and the load transfer test were performed on the same pile to verify the result of the roughness test.

A Study on the Behaviour Modes of the Face and Unsupported Span for Weak Rock Tunnel (연암터널의 막장 및 무지보 구간의 거동형태에 관한 연구)

  • Lee, Young-Zoo;Kim, Chang-Yong;Kim, Kwang-Yeom;Schubert, Wulf
    • Tunnel and Underground Space
    • /
    • v.17 no.1 s.66
    • /
    • pp.9-16
    • /
    • 2007
  • The influence of round length on the tunnel stability and construction cost is well acknowledged by many researchers and engineers but the coherent procedure is not available for its determination. In this study, the behaviour modes of the face and unsupported span was investigated for weak rock tunnel by a small scale model test, PFC3D and FDM analyses in consideration of the round length. Total five types of behaviour modes are defined and quantitative estimation of the behaviour modes was established in terms of the safety factor for the face stability and the conditional chart. Although the proposed method has some restrictions, this method can provide useful information for the optimization of the round length and excavation, especially in design stage.

Prediction of Ground-Condition Ahead of the Tunnel Face by Using 3-Dimensional Absolute Displacements (3차원 절대내공변위를 이용한 터널 막장전방의 지반면화 예측기법)

  • Lee, In-Mo;Gang, Gi-Don;Park, Gwang-Jun
    • Geotechnical Engineering
    • /
    • v.14 no.4
    • /
    • pp.17-32
    • /
    • 1998
  • has been much progress in theories and construction techniques to secure the stability of the underground structures. Recently, several studios have shown that it is possible to predict the existence of discontinuities ahead of a tunnel face by analyzing 3-dimensional absolute displacements measured during tunnel excavation. This paper concentrated on the development of a methodology to predict the existence and location of the discontinuities, or the void space(abandoned mine) , by performing 3-dimensional FEM analysis and considering the stress relocation caused by arching effect during excavation. Also, this study tried to verify deformation for choosing the most suitable support system. The results of this study might provide a way of safer and economical tunnel construction by utilizing the in-situ monitoring data.

  • PDF

Smart monitoring analysis system for tunnels in heterogeneous rock mass

  • Kim, Chang-Yong;Hong, Sung-Wan;Bae, Gyu-Jin;Kim, Kwang-Yeom;Schubert, Wulf
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2003.11a
    • /
    • pp.255-261
    • /
    • 2003
  • Tunnelling in poor and heterogeneous ground is a difficult task. Even with a good geological investigation, uncertainties with respect to the local rock mass structure will remain. Especially for such conditions, a reliable short-term prediction of the conditions ahead and outside the tunnel profile are of paramount importance for the choice of appropriate excavation and support methods. The information contained in the absolute displacement monitoring data allows a comprehensive evaluation of the displacements and the determination of the behaviour and influence of an anisotropic rock mass. Case histories and with numerical simulations show, that changes in the displacement vector orientation can indicate changing rock mass conditions ahead of the tunnel face (Schubert & Budil 1995, Steindorfer & Schubert 1997). Further research has been conducted to quantify the influence of weak zones on stresses and displacements (Grossauer 2001). Sellner (2000) developed software, which allows predicting displacements (GeoFit$\circledR$). The function parameters describe the time and advance dependent deformation of a tunnel. Routinely applying this method at each measuring section allows determining trends of those parameters. It shows, that the trends of parameter sets indicate changes in the stiffness of the rock mass outside the tunnel in a similar way, as the displacement vector orientation does. Three-dimensional Finite Element simulations of different weakness zone properties, thicknesses, and orientations relative to the tunnel axis were carried out and the function parameters evaluated from the results. The results are compared to monitoring results from alpine tunnels in heterogeneous rock. The good qualitative correlation between trends observed on site and numerical results gives hope that by a routine determination of the function parameters during excavation the prediction of rock mass conditions ahead of the tunnel face can be improved. Implementing the rules developed from experience and simulations into the monitoring data evaluation program allows to automatically issuing information on the expected rock mass quality ahead of the tunnel.

  • PDF

Numerical simulation on gas continuous emission from face during roadway excavation

  • Chen, Liang;Wang, Enyuan;Feng, Junjun;Li, Xuelong;Kong, Xiangguo;Zhang, Zhibo
    • Geomechanics and Engineering
    • /
    • v.10 no.3
    • /
    • pp.297-314
    • /
    • 2016
  • With the mining depth continuously increasing, gas emission behaviors become more and more complex. Gas emission is an important basis for choosing the method of gas drainage, gas controlling. Thus, the accurate prediction of gas emission is of great significance for coal mine. In this work, based on the sources of gas emission from the heading faces and the fluid-solid coupling process, we established a gas continuous dynamic emission model, numerically simulated and applied it to the engineering. The result was roughly consistent with the actual situation and shows the model is correct. We proposed the measures of reducing the excavation distance and borehole gas drainage based on the model. The measures were applied and the result shows the overproof problem of gas emission disappears. The model considered the influence factors of gas emission wholly, and has a wide applicability, promotional value. The research is of great significance for the controlling of gas disaster, gas drainage and pre-warning coal and gas outbursts based on gas emission anomaly at the heading face.