• 제목/요약/키워드: estimating unit

검색결과 418건 처리시간 0.024초

원전 건설공사 실적공사비 단가 제도 도입을 위한 연구 (A study on application method of "Result unit cost" to Nuclear Power Plant (NPP) construction cost estimating)

  • 박원섭;장경수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.46-47
    • /
    • 2014
  • Recently, BAI(Board of Audit and Inspection of Korea) has recommended that "Result unit cost" of Korean government apply to national power plant construction project when plant owner corporations estimate budget price for tender. but nuclear industry have difficulties with this suggestion. the purpose of this study is to review the "Result unit cost" and problem with application of NPP construction cost estimating. And proposed the direction of application of "Result unit cost" to NPP construction cost estimating.

  • PDF

대·소규모 토목공사의 실적공사비 비교 분석 (Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works)

  • 홍성호;신주열;김창학;이동욱
    • 대한토목학회논문집
    • /
    • 제33권4호
    • /
    • pp.1707-1718
    • /
    • 2013
  • 실적공사비 제도는 2004년부터 도입된 제도로서, 과거의 유사 공사의 계약단가를 토대로 공종별 단가를 파악하여 예정가격을 결정하는 방식이다. 이러한 실적공사비 단가는 매년 2회 한국건설기술연구원에서 발표하고 있다. 소규모 공사의 공사비 단가는 작업단위당 생산비용 증가, 장비 및 노무비 등 상승으로 인해 대규모 공사보다 높을 수밖에 없는 것이 건설공사의 특성이다. 그러나 실적공사비 단가가 공사의 규모와 무관하게 일률적으로 적용되고 있어 문제점으로 대두되고 있다. 본 연구에서는 이러한 실적공사비 제도의 문제점을 파악하기 위해서 대 소규모 토목공사의 실적공사비를 비교 분석하였으며, 소규모 토목공사의 실적공사비가 대규모 토목공사에 비해 21.8% 높은 결과가 도출되었다.

교량지역의 다양한 비점오염물질 원단위 산정방법 비교 (Comparison of Estimation Method of Pollutant Unit Loads from Bridge Area)

  • 김태원;길경익
    • 한국물환경학회지
    • /
    • 제27권5호
    • /
    • pp.597-604
    • /
    • 2011
  • This research analyzed the runoff patterns and estimated unit loads of selected pollutatnts using monitored data conducted for three years in a bridge area. Three estimating methods; the arithmetic average method, the regression method and the rainfall class method were used to estimate the unit load. Results of three estimating methods were compared with the unit pollutant loads from landuses in Korea and the unit pollutant loads from urban watersheds in Milwaukee, USA. Unit load using the arithmetic mean method were found to be overestimated. In terms of TSS, unit loads of two estimate were half lower than that of USA. Estimated TN and TP unit loads of three estimate were lower than that of Ministry of Environment in Korea.

유도무기 획득단가 추정 모델 개발에 관한 연구 (A Study on Developing the Acquisition Unit Cost Estimating Model of the Guided Weapon System)

  • 김용현;이용복;정원일;김동규;강성진
    • 한국군사과학기술학회지
    • /
    • 제15권5호
    • /
    • pp.565-576
    • /
    • 2012
  • Cost estimates are necessary for government acquisition program to support decisions about funding, to develop annual budget requests and to validate resource requirements at key decision points. Many researches have been done about cost estimating technique recently. Parametric cost estimating models based on CERs(Cost Estimating Relationships) have been mainly used using regression method with historical data. However, there are many restrictions in developing Korean version CERs because the number of data points are too small. Specially, data collection and data management system are unstable in Korean defense environment, when developing CERs. In this research, we analyzed the historical data, and found some cost drivers in guided weapon system area. We developed the Acquisition Unit Cost CER using the regression to remove multicollinearity in the historical data. So we could overcome the restriction of the insufficient sample number. This research as a first attempt is meaningful in terms of obtaining our own Acquisition Unit Cost CER using historical cost and physical characteristic in Korean development environment.

건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안 (The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris)

  • 이희선;김동식
    • 한국재난정보학회 논문집
    • /
    • 제4권1호
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

아파트 단지의 세대규모별 주차수요 추세분석에 관한 연구 - 대구광역시 고층분양아파트단지를 중심으로 - (A Study on the Trend Analysis of the Parking Demands According to the Housing Unit Size at Apartment Complex - Focused on high-rise apartment complexes in Daegu Metropolitan City -)

  • 박찬돈
    • 한국주거학회논문집
    • /
    • 제16권1호
    • /
    • pp.55-63
    • /
    • 2005
  • The purpose of this study is to find a way of solving on parking problems at apartment complex through the trend analysis research of the parking demands according to the housing unit size. The subjects of this study are high-rise apartment complexes in Daegu city which are constructed within 10 years. The parking demand according to the housing unit size at apartment complexes had been surveyed every July for 4 years from 2000 to 2003. Specially, we knew that the parking demand of $85 m^2$ below sized housing unit at apartment complex was exceeded architectural regulation of parking supply, and the parking demand of $85 m^2$ over sized housing unit at apartment complex was kept within architectural regulation of parking supply. And, the estimating formula that can predict the future parking demand by the trend analysis according to the housing unit size at apartment complexes in Daegu city was gotten through this study. But, in order to get more accurate estimating formula, it should be based on data of funker research and investigation about apartment complexes and it should be studied continuously.

해체 공사 원가분석을 통한 비율단가 적용방식의 적정성 검토 (An Investigation on the Propriety of Ratio-Unit Price Method for Estimating Demolition Cost)

  • 성낙원;김영석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.579-583
    • /
    • 2004
  • 고속도로 신설 및 확장공사는 국가의 기반시설을 설치하기 위한 대규모 공공사업으로 정확한 산출근거에 의해 공사비용을 산정하여 적정 예산을 책정하여야 한다. 그러나 현재 고속도로 신설 침 확장공사의 구조물 해체 비용은 단지 구조물 설치 비용에 표준품셈에 명기된 일정 비율($10\~70\%$)을 곱하여 산정되고 있다. 해체 비용 산정에 이용되고 있는 표준품셈 상의 일정 비율은 과거 실적데이터를 기반으로 구축된 것이 아니라 해외 산정방식을 참고로 공사 관리자의 주관적 경험을 적용하여 도출된 것이다. 설치비에 일정비율을 곱하여 해체 비용을 산정하는 기존 방식은 프로젝트의 특성 및 건설현장의 주변 여건을 고려할 수 없으므로 노무량 및 장비 투임량의 변화를 고려할 수 없는 문제점을 가지고 있다. 따라서, 본 연구에서는 다양한 현장 조사 및 실측을 통한 해체 공사비 원가 분석을 수행하여 구조물 해체를 위한 적정원가 산정기준을 제시하고 기존 비율단가 적용방식의 적정성을 검토하고자 한다.

  • PDF

TBM 공법의 자원기반 적산 방식에 의한 개산 공사비 예측 식 모델 개발 (Development of a model for an equation for estimating construction costs based on the resource-based cost estimating system for TBM)

  • 한승희;박홍태
    • 한국산학기술학회논문지
    • /
    • 제14권3호
    • /
    • pp.1474-1480
    • /
    • 2013
  • 본 연구는 TBM 공법의 구경별 자원기반 적산(원가 계산) 방식에 의한 공사비 적산을 수행하여 직접공사비와 총공사비를 분석하고, 이를 근거로 회귀분석을 수행하여 TBM 공법 구경별 직접공사비 및 총공사비를 추정할 수 있는 개산 공사비(개략 공사비) 예측 식 모델을 제시하였다. 본 연구에서 제시한 TBM 공법의 구경별 개산 공사비 예측 식 모델은 향후 TBM 공법 적용 현장의 사업기획, 예비조사, 타당성조사, 기본설계 단계에서 개산 공사비를 추정하는데 효과적으로 적용할 수 있을 것이다.

A Marginal Probability Model for Repeated Polytomous Response Data

  • Choi, Jae-Sung
    • Journal of the Korean Data and Information Science Society
    • /
    • 제19권2호
    • /
    • pp.577-585
    • /
    • 2008
  • This paper suggests a marginal probability model for analyzing repeated polytomous response data when some factors are nested in others in treatment structures on a larger experimental unit. As a repeated measures factor, time is considered on a smaller experimental unit. So, two different experiment sizes are considered. Each size of experimental unit has its own design structure and treatment structure, and the marginal probability model can be constructed from the structures for each size of experimental unit. Weighted least squares(WLS) methods are used for estimating fixed effects in the suggested model.

  • PDF

수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로 (Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target)

  • 박홍태;이양규
    • 한국재난정보학회 논문집
    • /
    • 제8권4호
    • /
    • pp.328-335
    • /
    • 2012
  • 건설공사의 표준품셈에 의한 자원기반 적산방식은 정부고시 노임단가와 기자재의 공시가 격에 표준적이고 보편적인 공법 및 공종에 대한 단위작업당 재료량, 노무량, 장비사용시간 등을 수치로 표시한 품을 곱하여 견적하였다. 그러나 자원기반 적산방식은 실제 거래가격을 적절히 반영하지 못하는 한계점이 발생하였다. 따라서 본 연구는 이러한 한계점을 극복하기 위하여 새로운 시도로 수로터널 현장을 대상으로 Cutter 점검/교환, TBM 정비, TBM 점검/급유, 후속설비, 광차, 운영교대, 갱내보강/낙반보강, 안전/회의의 작업 공종 별로 TBM 굴진 생산성을 분석하고, 이를 근거로 순굴진속도를 분석하여 실적 공사비를 분석하였다. 본 연구에서 제시하는 실적공사비 산정 접근법은 TBM 수로터널 현장에서 실적 공사비를 예측하는데 유용한 도구로 활용할 수 있을 것으로 확신한다.