• 제목/요약/키워드: estimate cost

Search Result 1,644, Processing Time 0.031 seconds

A Development Cost Estimation at Initial Phase for Military Software Using Backfiring Approach (백파이어링을 이용한 군사용 소프트웨어 초기단계 개발비용 산정 기법)

  • Lee Byong-Eun;Kang Sung-Jin
    • The KIPS Transactions:PartD
    • /
    • v.12D no.5 s.101
    • /
    • pp.737-744
    • /
    • 2005
  • As the portion of software cost in construction of the system related to the national defence is getting higher, the required accuracy of cost estimation on defense software in development is also getting higher. The PRICE S is used to estimate the software cost at the first stage in the development of software promptly. However, the PRICE S is appropriate for the American environment not for the Korean circumstances. Thus, we will present a method to compensate the PRICE S with comparing with the model of Korea Software Industry Association. Moreover, we also present another method to estimate software cost based on function point with backfiring approach, which will be used for the software projects planned. Finally, we expect that our works will provide a solution for applying the function point in the future and will increase the accuracy of cost estimation in software development.

Quantum Cryptanalysis for DES Through Attack Cost Estimation of Grover's Algorithm (Grover 알고리즘 공격 비용 추정을 통한 DES에 대한 양자 암호 분석)

  • Jang, Kyung-bae;Kim, Hyun-Ji;Song, Gyeong-Ju;Sim, Min-Ju;Woo, Eum-Si;Seo, Hwa-Jeong
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.31 no.6
    • /
    • pp.1149-1156
    • /
    • 2021
  • The Grover algorithm, which accelerates the brute force attack, is applicable to key recovery of symmetric key cryptography, and NIST uses the Grover attack cost for symmetric key cryptography to estimate the post-quantum security strength. In this paper, we estimate the attack cost of Grover's algorithm by implementing DES as a quantum circuit. NIST estimates the post-quantum security strength based on the attack cost of AES for symmetric key cryptography using 128, 192, and 256-bit keys. The estimated attack cost for DES can be analyzed to see how resistant DES is to attacks from quantum computers. Currently, since there is no post-quantum security index for symmetric key ciphers using 64-bit keys, the Grover attack cost for DES using 64-bit keys estimated in this paper can be used as a standard. ProjectQ, a quantum programming tool, was used to analyze the suitability and attack cost of the quantum circuit implementation of the proposed DES.

Dental implant cost estimation using the Activity-Based Costing approach (활동기준원가(Activity Based Cost)를 적용한 치과 임플란트 원가산정)

  • Shin, Ho-Sung;Ahn, Eun-Suk
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.51 no.4
    • /
    • pp.292-299
    • /
    • 2013
  • Purpose: There is a growing concern for the cost management of medical institutions. The purpose of this study was to estimate Activity-Based Costing (ABC) for dental implant cost. ABC refers to allocating resources or cost based on the activities of services. Materials and methods: A dental institution located in the metropolitan area was selected in this study. The tax accounting data of the institution were utilized to confirm total cost, and the institution was asked to make out clinical activities to figure out what activities were carried out. The direct cost and indirect cost for dental implant were separately estimated, and cost driver was analyzed to estimate the indirect cost accurately. Results: The rates of the direct and indirect cost respectively stood at 35.8 and 49.5 percent. The cost for a dental implant was found to be approximately 1,579 won, and the cost of prosthetic surgery and treatment that included implant surgery accounted for the largest portion of the cost, which was 470 thousand won (30%). And the weight of training and education on dentistry was relatively higher than that of the other kinds of treatment. Conclusion: In order to ensure accurate and scientific costing for dental implant, not only direct medical procedure but every pre- and post-procedure activity should fully be taken into account. Pre-activities, post-activities, education and training are included in the indirect cost, but all these activities are mandatory and associated with the quality of treatment and the satisfaction level of patients.

A Study of Improvements in the Standards of Cost Estimate for the New Excellent Technology in Construction (건설 신기술의 원가산정기준 개선방안에 대한 연구)

  • Lee, Ju-hyun;Tae, Yong-Ho;Baek, Seung-Ho;Kim, Kyoungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.65-76
    • /
    • 2022
  • The New Excellent Technology (NET) designation system, introduced in 1989 for the purpose of promoting the development of domestic construction technology and enhancing national competitiveness, reviews the statement of construction cost of new technologies. And the cost reduction effect such as design, construction, and maintenance cost and the effect of reducing the construction duration are evaluated as an evaluation criteria of economic feasibility. However, in this evaluation process, differences of opinion between the institution of construction cost estimating standard management and the new technology developer about unique technologies frequently occur. In addition it is difficult to objectively compare the construction duration with existing similar technologies because there is no information on productivity as the current cost estimating standards for new technologies only present the required amount per unit quantity. In this study, the current state of cost estimating criteria review procedure, evaluation criteria, and cost estimating standards establishment method were analyzed when screening for the designation of a new construction technologies, and compared with overseas cost estimating standards, measures to improve the cost estimating standards of current construction new technologies were suggested. Through the improved cost estimating standards of this study, it is expected that cost information on new technologies will be provided to clients in more detail than the current ones, and the availability and applicability of new construction technologies would be improved by simplifying the construction cost calculation process more.

An Analysis on the Importance of the Risk Factors Considering the Reasons for the Increase of the Subcontract Construction Project Bid Cost (건설프로젝트 하도급 입찰금액 상승요인을 고려한 리스크인자의 중요도에 관한 분석)

  • Lee, Sung-Goo;Shin, Hyun-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.1 s.23
    • /
    • pp.63-70
    • /
    • 2007
  • The aims of this study are to draw the project risk factors by grasping the relation especially between the construction preparation cost calculation and the project risk factors in the project's bidding stage, and to draw the cost estimate based on the risk when the orderer or the constructer performs the project and the main factors in calculating the most suitable construction cost by clarifying the understanding degree of the influence between the risk factors and the construction cost. In addition, this study can give a help to the proper decision -making through the prediction of the construction preparation cost, and this study is expected to give the basic data in developing the assessment tool for the most suitable construction cost of the project.

An investment cost model for metropolitan area subscriber networks (대도시 가입자망 투자비 산출 모형의 개발)

  • Hwang, Geon;Chang, Seok-Gwon;Kim, Sa-Hyeok
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1997.10a
    • /
    • pp.239-242
    • /
    • 1997
  • Subscriber network investment cost is a main cost element among those constituting the access charges in telephone networks. The purpose of this paper to estimate the investment cost of installing a subscriber network in a typical metropolitan area and to develop a cost modeling framework. To this aim, a metropolitan area in Seoul was investigated. The main cost elements were identified and their relationships with the cable technology, geographical characteristics, and the number of subscribers were analyzed. The findings could be used to design an enhanced cost proxy models for estimating the access charges in a multi-operator environment.

  • PDF

Development of a Costing Model for Wooden Patterns of Casting Structures for Machine Tools

  • Seo, Han-Tae;Choi, Jin-Woo
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.24 no.4
    • /
    • pp.386-393
    • /
    • 2015
  • A study is carried out on investigation on pattern costs, identification of geometric parameters for the cost, and development of cost estimation models for casting patterns. Pattern costs for machine tool structures are collected and analyzed to identify the important geometric parameters that affect the costs. The parameters are used for the development of the costing models. It is found that the geometric parameters can be easily obtained from a CAD system and then the costing models estimate a pattern cost in a minimum time. The models are verified with the structures whose pattern cost was used for this study. It is expected that this costing models can evaluate the cost of casting structures of machine tools in search of a near-optimal design based on manufacturing cost and, for example, weight at the design stage.

KSLV-II Cost Estimate using TRANS COST 7.1 (TRANSCOST 7.1을 적용한 실용위성 발사체 비용추정)

  • Seo, Yun-Kyoung;Oh, Bum-Seok
    • Aerospace Engineering and Technology
    • /
    • v.6 no.2
    • /
    • pp.119-125
    • /
    • 2007
  • Space launch vehicle development needs many kinds of technologies synthetically. Nowadays, KARI (Korea Aerospace Research Institute) has developed a space launch vehicle, KSLV-I (Korea Space Launch Vehicle-I), that is able to load with an 100kg payload. After that it plans to develop Korean Space Launch Vehicle. As space launch vehicle becomes more complicate and larger, it needs a scientific and analytic development cost estimation. In this paper a cost estimation for KSLV-II using TRANSCOST 7.1 was studied.

  • PDF

A Study on the Determination of Economic Life of Weapon System by using the PRICE Model (PRICE 모텔을 이용한 무기체계 경제수명 결정에 관한 연구)

  • Kim Seung-Soo;Kang Sung-Jin
    • Journal of the military operations research society of Korea
    • /
    • v.30 no.2
    • /
    • pp.13-31
    • /
    • 2004
  • This paper aims at efficient determining the economic life of weapon systems. Specifically, the procedure to estimate the life cycle cost at initial acquisition state or at development state using the PRICE model is proposed. The PRICE model is a parametric cost estimation which is widely used in the field of national defense. The model includes the estimation of the cost in life cycle of weapon systems such as research and development, acquisition, operation and support. Using this model, economic life of weapon systems can be determined. Based on an equivalent annual cost (EAC) method which sums the capital recovery with return (CR) and the equivalence cost (EC), the economic life will be calculated. A case study is accomplished to illustrate the proposed procedure.

Probability- based Life Cycle Cost Analysis of Railroad Structures (확률적 방법에 의한 철도시설물의 LCC 분석)

  • Sho Byung-Choon;Choi Young-Min;Cho Sun-Kyu;Shin Kyung-Chul;Jung Jae-Dong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.971-976
    • /
    • 2004
  • The management of railroad structures is more difficult and complicate because there are many structures such as rail, bridge, tunnel, station, and so on. Therefore, LCC(Life Cycle Cost) analysis of railroad structures as public infrastructure must contain a maintenance cost as well as an initial cost in order to make a more effective management during the life cycle on the design phase. This paper presents a cost classification scheme considering user costs such as value of delayed time of passenger and freight. Also, in this study it is developed a probabilistic life cycle cost(PLCC) analysis model of railroad structures taking into account uncertainties and variations of input variables in order to analyze LCC. It may be stated that the model proposed in this study can greatly contribute to the making optimal decision, the estimate of the maintenance cost and the allocate of budget in the project of railroad structures.

  • PDF