• Title/Summary/Keyword: establishment and implementation

Search Result 546, Processing Time 0.034 seconds

A Study on Advanced Model for GIS Connection and Integration in Local Governments (지자체 GIS 통합.연계 고도화 모델 연구)

  • Kim, Eun-Hyung
    • Spatial Information Research
    • /
    • v.15 no.3
    • /
    • pp.189-202
    • /
    • 2007
  • As applications of GIS technology have grown in local governments, the wider and integrated use of spatial information is demanded more than before. Particularly because 70-80% of administrative information in local governments are related spatial, it becomes a key issue to connect and integrate non-spatial information with spatial information for more advanced use of GIS applications in local governments. The purpose of this study is to establish an advanced Implementation model by analyzing obstacles in existing GIS applications and suggesting implementation strategies. The strategy, as an important part of the model, includes efficient information sharing, establishment of commonly usable GIS Database, architectural improvement for Enterprise GIS in terms of database and system implementation, standardization far the model, and establishment of spatial infrastructure in the local governments. The study concludes that administrative collaboration in a horizontal and vertical perspective has a highest priority for the implementation of the model.

  • PDF

Case Analysis for the Development of Smart Factory ISP Indicators

  • Heon-Wook Lim
    • International Journal of Advanced Culture Technology
    • /
    • v.11 no.3
    • /
    • pp.321-326
    • /
    • 2023
  • The purpose of this study is to create and present a formalized module of ISP (Information Strategy Plan), a smart factory consulting method that is helpful to companies or consultants who will build smart factories. Order of study is First, the theoretical research direction is established through the investigation of related papers. Second, ISP policy research practices are compared to derive practical implementation methods. Third, in order to derive a standardized module method related to the final smart factory ISP, related cases of the government and individuals are compared. As a result of previous research, ISP (Information Strategy Planning), a consulting methodology, is similar to Deming's PDCA, and is regarded as Plan (environment and current status analysis), Do (establishment of future model goals), Check (establishment of implementation plan), and Act (follow-up management). As a result of the study, we obtained the following results. The first step is to analyze the current status and identify the purpose of introduction and problems in plant operation. In the second step, establish a consulting plan and derive a proposal description, strategic task, and master plan. Step 3 establishes detailed action plans, evaluates consulting outputs and consulting, and reports performance. Step 4 is established as follow-up management consulting. The limitation of the study is that although related data were compared to develop the consulting methodology into a standardized module, FGI analysis through experts or Delphi survey were not conducted, so there is a limit to the reliability of the mapping results.

ISO Quality System Certification and Management Quality (ISO 품질시스템 인증과 경영품질)

  • Lee, Byung Yong;Jung, Soo Il
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.50
    • /
    • pp.341-349
    • /
    • 1999
  • Ever since the ISO (International Organization for Standardization) established the ISO 9000 Family standard in 1987, many countries have selected this as their national standard and have provided support for its implementation and conducted assessment activities on the results of its implementation. Likewise, certification assessment was first begun in Korea in 1994, with the result that over 7,600 certificates have been issued to domestic enterprises during the past 5 years or so. This is significant not only in the remarkable growth rate in terms of quantity but also in the fact that it has made possible the establishment of a quality system that meets international standards among Korean enterprises. In this article, it will briefly introduce the establishment and certification of the ISO quality system for those organizations that are complying with the quality system as a part of the process of strengthening their quality competitiveness. For those organizations that have already established the quality system and implemented it for years, we will show the direction for continuous quality improvement in order for these organizations not only to fulfill the requirements but to maintain the superiority of the quality system and their management quality. In addition, it will show what preparations are necessary for organizations and certification bodies in order to expand a manufacturing process-oriented quality system to one that is geared to the total management quality.

  • PDF

INTEGRATED DEVELOPMENT ENVIRONMENT FROM MODELING TO IMPLEMENTATION FOR AUTOMOTIVE REAL-TIME EMBEDDED CONTROL SYSTEMS

  • Ma, J.;Youn, J.;Shin, M.;Hwang, I.;SunWoo, M.
    • International Journal of Automotive Technology
    • /
    • v.7 no.3
    • /
    • pp.345-351
    • /
    • 2006
  • Software-In-the-Loop Simulation(SILS) and Rapid Control Prototyping(RCP) are proposed as an integrated development environment to support the development process from system design to implementation. SILS is an environment used to simulate control systems with temporal behavior. RCP offers seamless phase shift from design to implementation based on automatic code generation. There are several toolsets that support control system design and analysis. A few of these tools generate the control software automatically. However, most of these design toolsets do not cover temporal behavior which appears after implementation. In earlier toolsets, the design and the implementation of a control system are considered as two separate processes which mean the conventional development process is not connected strictly. SILS/RCP environments work under an identical platform and use the same representation for system modeling. An integrated SILS/RCP environment makes it possible to design controllers under conditions similar to real execution during off-line simulation and to realize controllers in the early design phase. SILS/RCP environments integrate the design and implementation phases which reduce the time-to-market and provide greater performance-assured design. The establishment of SILS/RCP and the practical design approaches are presented.

The Establishment of Service Cloud Based Expansion and Developing Plan for National Spatial Data Infrastructure (서비스 클라우드 기반 국가공간정보통합체계 확대발전방안 수립)

  • Youn, Junhee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.1
    • /
    • pp.367-373
    • /
    • 2016
  • The construction of National Spatial Data Infrastructure (NSDI) started from 2008 and was completed at 2012, with the aim of co-utilizing public agencies' national spatial information by integrating and linking. Despite the existence of the NSDI, an update of spatial data is not fully reflected because the spatial information has not been updated simultaneously by NSDI and public agencies. By examining the public agencies' services using the spatial information, a national budget is wasted because the re-usable similar services are duplicated. These issues could be solved by adopting a cloud system, whose concept is co-utilizing IT resources, to the NSDI. This study examined the service cloud based expansion and development plan for NSDI. The plan included an implementation strategy for a spatial information service cloud system and an establishment plan for a governance system. The service scenarios, concept diagram, and service functions for the system were derived in a system implementation plan. For the service functions, the unit functions of two modules were proposed and specific functions were derived. In the establishment of a governance system, the business roles and business processes were defined for organizations managing service cloud based NSDI. The business role and process were defined and derived by each service life-cycle step. With the proposed system implementation plan, a detail system design and composition of the organization could be possible, and a service cloud-based NSDI system could be implemented.

Design and Implementation of Document Filing and Retrieval System in an OSI Environment (OSI 환경에서 문서 파일링 및 검색 시스템의 설계 및 구현)

  • 임재홍;박용진
    • Journal of the Korean Institute of Telematics and Electronics B
    • /
    • v.31B no.2
    • /
    • pp.10-20
    • /
    • 1994
  • This paper describes a design and implementation of the DFR(Document Filing and Retrieval) system. one of applications of DOAM(Distributed Office Application Model) which is the international standard in ISO(International Standards Organization). On the basis of the international standard, the DFR system is implemented on SUN workstation and PC/386 with C language, and its implementation is verified by tracing the association descriptor and primitives of service elements when its operation is tested between client and server. The result of this study shows that the DFR system can be implemented on the basis of the international standard, and makes a contribution toward the establishment of functional standards for the DFR system.

  • PDF

Adopting Cloud Service in the National Spatial Data Infrastructure

  • Youn, Junhee
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.676-677
    • /
    • 2015
  • In Korea, NSDI(National Spatial Data Infrastructure) was implemented for integrating and sharing the nationally generated spatial data. One of the main roles of implementing NSDI is providing spatial data to public agencies. And now, the establishment plan for NSDI with the technical advancement should be needed. This paper deals with the technical aspects of adopting cloud service in the NSDI. First, we propose the concept for target system, which shows the current and future NSDI. In the future NSDI model, GIS cloud and governance systems are included. Service functions for cloud system and infrastructure implementation design directions are derived. Finally, governance system implementation plan is described. This research will contribute to the implementation of NSDI cloud service system.

  • PDF

A Comparative Study of the Perceptions by Stakeholder on the Problems and Difficulties at Implementation Stages of the Agricultural Environment Conservation Program (농업환경보전프로그램 이행단계별 문제점 및 애로사항에 대한 이해당사자별 인식 비교)

  • Kim, Soo-Jin;Bae, Seung-Jong;Yoo, Seung-Hwan;Na, Ra;Son, Jeong-Woo;Hur, Seung-Oh
    • Journal of Korean Society of Rural Planning
    • /
    • v.29 no.4
    • /
    • pp.201-210
    • /
    • 2023
  • The Agricultural Environmental Conservation Program is a useful system for creating sustainable agriculture and environmentally friendly and comfortable rural areas. However, there are still many problems and difficulties, such as the establishment of necessary activities and plans by the residents themselves, and improvements are required. The degree of importance and difficulties according to the implementation stage of each stakeholder was quantified and compared with each other, and the specific difficulties recognized by on-site support organizations were structurally analyzed. It was analyzed that the importance and difficulties of the project implementation stage for local government officials and the project implementation planning stage for on-site support organizations were very high, indicating that they perceived the most need for improvement. On the other hand, 21 specific problems and difficulties were derived based on the results of the literature survey and stakeholder interviews. As a result of the structural analysis using the DEMATEL method, the most influential factor was the low understanding of the project by residents, the most influential factor was the lack of collecting and reflecting residents' opinions, the most central factor was the lack of collecting and reflecting residents' opinions, and the most causal factor was the lack of education and promotion of the project. The results indicate that a more stable system can be established if continuous promotion and education, periodic meetings and discussions, active reflection of residents' opinions in project implementation plans, and simplification of implementation inspection and project cost execution through the implementation inspection platform are promoted. Despite the limitations, considering that no institutional analysis of agricultural environmental conservation programs has been conducted so far, the results of this study are expected to serve as a basis for the establishment of relevant policies in the future.

A Study on Mega-Y Project Innovation Activities (대형 혁신과제 추진방법에 대한 연구)

  • Sung, Su-Gyeong;Kim, Joon-Seok;Byun, Jai-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.38 no.4
    • /
    • pp.531-539
    • /
    • 2010
  • Mega-Y project is very important for a company to gain a competitive advantage in markets or to achieve drastic change in the internal processes. It stems from the company strategy and annual management goals or key performance measures, and is proceeded by the cross-functional team. This paper presents the success factors and implementation process of the Mega-Y projects. The implementation process is presented in 5 steps, including project selection, cross-functional team building, establishment of the master plan, development and execution of sub-projects, and project completion. A case study on the cost reduction project of aircraft development is presented to help for the practitioners to deploy the implementation process introduced in this paper.