• 제목/요약/키워드: environmental project

검색결과 2,419건 처리시간 0.033초

ENVIRONMENTAL ECONOMICS FOR CONSTRUCTION

  • Suk hyun Kwon;Nam Ho Cho;Kyoung Hee Lee;Kyoung Ju Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.280-285
    • /
    • 2011
  • This study aims to propose an assessment model on environmental economics which will provide useful information in making a decision for the implementation of pro-environmental and economical construction projects. To meet the objective, this study suggests a procedure to estimate environmental cost of construction projects. The model combines environmental load assessment and environmental value assessment. The environmental cost of pollutant generated from the construction project was estimated utilizing the Contingent Valuation Method (CVM) which is a value assessment method borrowed from economic science. The devised model is expected to provide a useful methodology that will scientifically support the planning and management of sustainable construction not only in the environmental aspect but also in the economical aspect.

  • PDF

ORGANIZATIONAL AND COMMUNICATION ISSUES FOR MANAGING DESIGN-BUILD HIGHWAY PROJECTS

  • G. Edward Jr. Gibson;James T. O'Connor;Giovanni C. Migliaccio;Pramen P. Shrestha
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.974-979
    • /
    • 2005
  • Effective communication flow is a fundamental for the success of any construction projects. The key role of communications among project parties is even more critical in the case of Design-Build (DB) projects. Previous research has shown that these projects have an environment where integration between different project team members and schedule constraints increase channels of communication, and require faster communication flows. This paper summarizes the findings from research analyzing organizational structures and communication flow of the Texas State Highway 130 (SH130) project. Awarded in 2002, the SH130 project, totaling $1.3 billion USD, constitutes the "pilot" application for the DB approach in the state of Texas. A set of observations pertaining to team organization and communication issues in the design-build environment is included.

  • PDF

기후변화 프로젝트 학습이 초등학생의 기후변화에 대한 인식 및 태도, 환경소양에 미치는 영향 (Effects of Climate Change Project Learning on Elementary School Students' Perceptions and Attitudes Toward Climate Change and Environmental Literacy)

  • 장준용;강지훈;유병길
    • 한국초등과학교육학회지:초등과학교육
    • /
    • 제43권1호
    • /
    • pp.158-169
    • /
    • 2024
  • 본 연구에서는 기후변화와 프로젝트 수업이 초등학생의 기후변화에 대한 인식 및 태도, 환경소양에 어떠한 영향을 미치는지 알아보았다. 이를 위하여 광역시 소재의 초등학교 6학년 학생 174명(남학생 77명, 여학생 97명)의 학생을 대상으로 12차시 분량의 기후변화 프로젝트 수업을 실시한 후 학생들의 기후변화에 대한 인식 및 태도, 환경소양 수준의 변화를 분석하였다. 연구 결과, 기후변화 프로젝트 수업은 초등학생의 기후변화에 대한 인식 및 태도에 긍정적인 영향을 미쳤다. 프로젝트 학습 과정에서 기후변화 문제와 관련하여 서로 조사한 내용을 공유하고 소통하면서 학생들의 기후변화에 대한 인식 및 태도가 함양된 것으로 판단된다. 또한 기후변화 프로젝트 수업은 초등학생의 환경소양에 긍정적인 영향을 미쳤다. 구체적으로 환경태도 및 가치, 환경 친화적 행동 영역에서는 긍정적인 변화가 관찰되었지만 환경감수성 영역에서는 유의한 변화가 나타나지 않았다. 본 연구는 과학 및 환경 관련 교육학 분야에서 강조되고 있는 기후변화 문제를 소재로 한 기후변화 프로젝트 수업의 교육적 효과를 논의하고 시사점을 제안했다는 점에서 의미가 있다.

새만금사업의 친환경개발지표 설정 연구 (A Study on the Development of Eco-friendly Environmental Indicators for Saemangeum Project)

  • 류재홍;이상훈;구자건
    • 환경영향평가
    • /
    • 제15권4호
    • /
    • pp.279-288
    • /
    • 2006
  • Saemangeum reclamation project was started in 1991 with the purpose of eco-friendly reclamation, but without clear definition of eco-friendliness. This study was carried out to find out the environmental indicators to define and evaluate the eco-friendliness of Saemangeum project. The methodology to identify the indicators included the analysis of similar reclamation projects, professional discussions, and Delphi survey. The eco-friendly indicators are theoretically based on the five elements of eco-friendliness; 1) resource consumption, 2) energy consumption, 3) pollution emission, 4) bio-diversity, 5) social amenity. The 69 indicators were explained in detail for the convenient use of the indicators by the potential users. The 69 indicators were classified into three categories such as pre-evaluation, process evaluation, and post-evaluation. In terms of spatial consideration, the 69 indicators were classified into two categories such as direct influence area and indirect influence area. Also the 69 indicators were classified into 7 categories: 1) sea, 2) lake, 3) agricultural land use, 4) industrial land use, 5) residential land use, 6) tourism land use, and 7) environmental land use. Twenty core indicators were selected from the 69 indicators by surveying the importance of each indicator. The core indicators are recommended in case of time and budget strain. When there are few quantitative data accumulated for the reclamation project, 5 macro indicators are recommended to be used. Macro indicators are qualitative in nature, and may be used in order to evaluate the overall eco-friendliness of a reclamation project.

Housing / Urban Development Integrated with Flood-Control Reservoirs in Japan

  • Watanabe, Naoyuki
    • 토지주택연구
    • /
    • 제5권3호
    • /
    • pp.203-214
    • /
    • 2014
  • The purpose of this paper is to introduce two integrated urban development projects in Japan that take full advantage of flood-control reservoirs: the Tetsugakudo Park Collective Housing Development Project and the Koshigaya Lake Town Project. The former project - implemented cooperatively by the Tokyo metropolitan government in charge of river management, Shinjuku and Nakano wards (in Tokyo) responsible for park management, and the Urban Renaissance Agency, a housing project developer - set a significant precedent for three-dimensional river use by realizing the three-dimensional integrated development of a flood control reservoir, a park, and collective housing. The Koshigaya Lake Town Project, launched as a drastic storm water management measure for a low-lying area often plagued by flooding, has achieved a sustainable coexistence between the waterfront environment and the urban living environment, with an artificial flood-control reservoir as the core for urban development. This project is fully committed to environmental coexistence through the optimal use of local environmental resources, with the cooperation of the central government, Saitama Prefecture and Koshigaya City.

지속가능성과 환경평가의 연계에 관한 연구 (A Study on the Implication of Sustainability and Environmental Assessment)

  • 홍상표
    • 환경영향평가
    • /
    • 제20권3호
    • /
    • pp.269-279
    • /
    • 2011
  • Sustainability assessments tend to integrate ecological, social, and economic concerns. Sustainability assessment could be considered the highest rung in the assessment ladder. Broad strategies that seek to integrate individual SEA(Strategic Environmental Assessment) could be subjected to a sustainability assessment. Sustainability assessment could incorporate global and transboundary effects and priorities into SEA and project-level EIA(Environmental Impact Assessment). SEA could provide an environmental context and direction for project-level EIA. Procedural and substantive EIA requirements can be addressed through tiering such as sustainability assessment, SEA, project-level EIA. In Korea, PERS(Prior Environmental Review System) that has been utilized to evaluate administrative plans related with various kinds of development projects should be evolved not only to incorporate environmental impacts into early stage decision-making, but also to implicate sustainability assessments that include social equity and economic efficiency. Integration of SEA and sustainability assessment can be initiated through the application of DPSIR (Driving Force - Pressure - State - Impact - Response ) framework that was developed by European Environmental Agency.

개발사업에 의한 자연경관 영향 저감방안 중요도 분석에 관한 연구 (A Study on the Analysis of the Importance of Natural Landscape by the Development Project)

  • 신민지;신지훈
    • 농촌계획
    • /
    • 제25권2호
    • /
    • pp.99-117
    • /
    • 2019
  • Environmental impact assessment (EIA), which predicts, evaluates, and manages the influences on natural landscape, plays a role of monitoring natural resources for systematic management of natural landscape. However, the function of verification and correction of the system is still insufficient and feed-back, one of the most important features of EIA follow-up, has not been introduced in Korea's EIA system yet. As a procedure, it is required to check if the opinions of the evaluators are properly reflected to the outcomes of the project through a reviewing process after assessing environmental impacts of a development project. In reality, despite the awareness about the importance of follow-up inspection of the conformity with, the system mainly focuses on the agreement during the planning stage of the development project and fails to continuously manage after its completion. There have been various preceding studies related to prediction, evaluation, and management of environmental impacts on natural landscape for better management. They primarily dealt with the problems in the EIA process and suggested improvement measures, including directions for institutional development, step-by-step goals, and operation methods, to address the problems which arise in the EIA follow-up process. However, suggested measures are not actively applied with the focus only put on institutional operation, there are virtually no standardized methods to predict and assess landscape changes due to the development project and to manage landscape after the project. Against this backdrop, this study aims to explore the existing methods to analyze the impacts natural landscape and to establish a system where landscape management is continued after the development project. To this end, we will suggest reducing methods according to the predicted changes in landscape for post-project management of natural landscape. Characteristics of reduction methods by project type were examined through reviewing the guide to natural landscape rating and the importance of development project impacts on natural landscape by type of reduction was evaluated through questionnaire for experts. Evaluated types of reduction are classified and presented by characteristics of each development project and content of reduction type.

INTEGRATED LIFE-CYCLE COST ANALYSIS CONSIDERING ENVIRONMENTAL COSTS: A HIGHWAY PROJECT CASE

  • Woo-Sik Jang;Heedae Park;Sungmin Kim;Seung Heon Han;Jong Seo Jeon
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.273-279
    • /
    • 2011
  • Concerns over the environment have spawned a number of research studies in the construction industry, as the construction of built environments and large infrastructures involves diverse environmental impacts and loads of hazardous emissions. Many researchers have attempted to quantify these environmental loads, including greenhouse gases, carbon dioxide, nitrogen dioxide, and sulfur dioxide, to name a few. However, little research has been conducted regarding integrating the life-cycle assessment (LCA) of environmental loads with the current life-cycle cost analysis (LCCA) approach. This study aims to estimate the environmental loads as a monetary value using the European Climate Exchange (ECX) rate and, then, to integrate those impacts with the pure construction cost. Toward this end, this study suggests an integrated approach that takes into account the environmental effect on the evaluation of the life-cycle cost (LCC). The bill of quantity (BOQ) data of a real highway project are collected and analyzed for this purpose. As a result, considering the environmental loads in the pavement process, the total LCC increased 16% from the traditional LCC cost. This study suggests an integrated approach that will account the environmental effect on the LCC. Additionally, this study is expected to contribute to better decision-making, from the perspective of more sustainable development, for government as well as for contractors.

  • PDF

이해관계자와 이용객 설문 조사를 통한 국내 ODA 산림협력사업 평가 연구 - 인도네시아 룸핀양묘장 사업을 대상으로 - (Evaluation of the ODA Forest Cooperation Projects in Korea through Stakeholder and Visitor Survey - A Case Study of the Rumpin Seed Source and Nursery Center Projects in Indonesia -)

  • 이현정;김휘문;김경태;김영;최재용;송원경
    • 한국환경복원기술학회지
    • /
    • 제24권2호
    • /
    • pp.19-37
    • /
    • 2021
  • It is essential that the evaluation of official development assistance (ODA) projects is conducted based on empirical research for the performance and improvement of the project. This study intended to quantitatively figure out the actual status and performance of ODA projects. The performance of the Rumpin Seed Source and Nursery Center project implemented by the KOICA was evaluated in items of relevance, efficiency, effectiveness, impact, sustainability, which are OECD Development Assistance Committee(DAC) evaluation criteria. From August 26, 2019 to August 29, 2019, a survey was conducted on 50 visitors and 54 stakeholders of the Rumpin Seed Source and Nursery Center. Through on-site survey, problems in the donation project and operation in Indonesia were identified and measures for improvement was grasped. As a result of the study, the value scored by OECD DAC evaluation criteria of the Rumpin Seed Source and Nursery Center project based on the Economic Development Cooperation Fund(EDCF) evaluation grade was evaluated as a very successful class in all items. The average score of the recognition question was 4.08 points for visitors and 4.08 points for stakeholders, and the average score for the satisfaction question was 4.37 points for visitors and 4.11 points for stakeholders, which were high overall in both groups. The main factor that affects the project awareness of the visitors was the fact that the Rumpin Seed Source and Nursery Center was created based on Korean technology, and it was confirmed that Indonesia's own items related to similar projects had a great influence on the project satisfaction. In the case of stakeholders, project support in Korea affected their recognition, and it was found that relevance, efficiency, effectiveness items had the greatest impact on the level of project satisfaction of stakeholders derived from the DAC individual evaluation results. Efforts are required to increase the main factors by reflecting the results of each item and to preserve and maintain the project. This study is significant in determining the performance of the ODA project based on empirical data, and it is believed that it can be used as basic data for supplementing and strengthening the project in the future.

An Exploratory Study of EVMS Environment Factors and their Impact on Cost Performance for Construction and Environmental Projects

  • Aramali, Vartenie;Sanboskani, Hala;G. Edward Jr., Gibson;Asmar, Mounir El
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.170-178
    • /
    • 2022
  • A high-performing Earned Value Management System (EVMS) can influence project success and help stakeholders meet project objectives. Although EVMS processes are well-supported by technical guidelines and standards, project managers often face challenges related to the project culture, team, resources, and business practices that make up the project environment within which an EVMS is being used. A comprehensive literature review revealed a lack of a data-driven and consistent assessment frameworks that can gauge the environment surrounding EVMS implementation. This paper will discuss the EVMS environment of construction and environmental projects, and examine its impact on cost performance. The authors used a multi-method approach to identify 27 environment factors that make up the EVMS environment, assessing them on 18 construction and environmental projects worth over $2 billion of total cost. Research methods employed include: (1) a literature review of more than 300 references; (2) a survey of 294 respondents; and (3) remote research charrettes with more than 60 participating expert practitioners. Culture (one of the identified environment categories) was found to be relatively more important in terms of its impact on the EVMS environment, followed by people, practices, and resources. These exploratory results show statistically significant differences in cost performance between completed projects with either a good or poor environment, for the sample projects. Key environment factors are outlined, and guidance is provided to practitioners around how to set up an effective EVMS environment in a construction or environmental project to inform decision-making and support achieving the project cost objectives successfully.

  • PDF