• Title/Summary/Keyword: environmental planning

Search Result 3,102, Processing Time 0.03 seconds

Deducing environmentally conscious factors for apartment complex planning and weight evaluation (환경요소를 고려한 공동주택 단지계획요소 도출 및 가중치 평가)

  • Jung, Suk-Jin;Seo, Jung-Bum;Yoon, Seong-Hwan
    • KIEAE Journal
    • /
    • v.16 no.6
    • /
    • pp.51-56
    • /
    • 2016
  • Purpose: As declines in the quality of residential environments occur, such as urban heat island effect, tropical night phenomenon, and violations of right to light and privacy due to urban densification and high rise building, these problems are emerging as social issues. In order to improve these issues, design factors which consider environmental aspects must be selected when planning apartment complexes, and ways to reflect them in the planning phase must be explored. Method: In this study, the analytical hierarchy process(AHP) was used to deduce design factors that considered environmental elements during the planning of apartment complexes. Furthermore, the priority and weight for each evaluation index were assessed. The objective was to propose a guideline for planning apartment complexes by finding the best solution for each evaluation index using complex weight values. Result: Floor area ratio was selected as the most important evaluation criterion in the environmentally conscious evaluation index for apartment complex planning. The shape and placement of skylights were selected as the most important evaluation criteria in the sunshine environment for a pleasant residential environment. Ground surface cover design was selected as the most important criterion in the outdoor thermal environment index for improving the microclimate within cities and apartment complexes. Thus, the results of this study can serve as an investigation guideline that concerns policy and regulations, and as reference data that can be used in planning apartment complexes.

Study on the Rural Landscape Management System for Preserving Rural Identity -Focusing on the AONBs of England- (농촌다움 보전을 위한 농촌 경관 관리체계의 시사점 -영국의 AONB 제도 사례를 중심으로-)

  • Kim, Do-Eun;Jung, Hae-Joon;Kang, Dong-Jin;Son, Yonghoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.30 no.2
    • /
    • pp.51-68
    • /
    • 2024
  • Since 1949, the UK has implemented a national land planning strategy to sustain rural areas, emphasizing the concept of 'Natural Beauty.' This involves designating "Areas of Outstanding Natural Beauty (AONB)" as a political approach to conserving rural landscapes and fostering a societal consensus on environmental conservation. AONB adopts an integrated and systematic approach to achieve harmony between the environment and human activities. This study investigates the implications of the AONB rural landscape management approach through case studies of the Cotswolds Conservation Board and Cannock Chase Joint Committee. It examines the legislative designation and supporting processes of AONB, analyzing the governance system to clarify the roles of authorities in policy decision-making. AONB's system revolves around joint committees or conservation boards of local authorities responsible for establishing, implementing, and monitoring management plans. The planning process involves a harmonious management plan system reflecting regional demands, including regular forums. AONB serves as a powerful tool for local residents to engage in the development of their region through stewardship. The study suggests that understanding the AONB model could provide a foundation for developing rural landscape conservation and spatial management plans tailored to Korea's context in the future.

The Evaluation and Comparison of Alternative Site for the Second Service Facilities Zone near the Tonghak Temple in Mt. Kyeryong National Park (계룡산 국립공원 동학사 제2집단시설지구의 위치선정평가 및 대안비교)

  • Lee, Hee-Seon;Lee, Kyoo-Seock
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.2
    • /
    • pp.29-37
    • /
    • 1995
  • The national park should be preserved in accordance with the regulation, but the development planning or facilities management planning has not been faithful to the spirits of the regulation. Recently natural environment has been radically changed, and especially damaged by large scale development of Service Facilities Zone. Thus the effective land use planning of the national park is required. Therefore, the purpose of this study is to propose the alternative site for The Second Service Facilities Zone in Mt. Kyeryong National Park using the GIS, and to compare the alternative site with the existing development site. Site selection was based on Rules of Combination which covers topographic analysis, viewshod analysis, distance analysis from hot spring well, land use analysis, and forest stand analysis.

  • PDF

Development of the Evaluation Model for the Quantitative Analysis of Local Agenda 21 (지방의제 21의 정량적 분석을 위한 평가모델의 개발)

  • Woo, Hyung-Taek
    • Journal of Environmental Science International
    • /
    • v.15 no.12
    • /
    • pp.1205-1220
    • /
    • 2006
  • This study was conducted to develop the evaluation model which can analyse local agenda 21 comprehensively and systematically from the making process to the designed contents. The evaluation model was devised through the theoretical review of local agenda 21 and designing the evaluation system composed of evaluation domains, related indicators and scales. The evaluation system was carefully constructed based on planning theories and the discussion and agreement of specialists regarding local agenda 21. This model has three evaluation domains of process, content, and evaluation of implementation with different weighting values. Each domain contains large indicators, medium indicators and small indicators. Each indicator has different weighting value according to its importance. Basically, each small indicator was scored by 3 or 5 point scale. This evaluation system can not only analyse local agenda 21 quantitatively, but also find out good points, problems, and limits of various phases of planning and implementing local agenda 21.

Economic Valuation Methods of Biodiversity

  • Cho, Woo-Young;Bae, Doo-Hyun;Kim, Hong-Sok
    • Environmental Engineering Research
    • /
    • v.13 no.1
    • /
    • pp.41-48
    • /
    • 2008
  • The valuation of biodiversity is a fundamental step in conservation. The useful framework for analysing the economic value of biological resources is that of total economic value (TEV) and TEV comprises both use and non-use values, the former related to an actual use made of the resource, the latter to a willingness to pay for the resource independently of any use made of it. There are several valuation approacher in environmental economics literature. However, stated preference approach should be introduced for valuation of biodiversity because it can estimate non-use value as well as use value. Contingent Valuation and Conjoint Analysis are representative methods in stated preference and Conjoint Analysis can be more useful for valuation of biodiversity. Futhermore, the combination of ecology and economics to assess biodiversity leads to an integrated framework. Thus, interdisciplinary work is required, involving both economists and ecologists transferring elements or even theories and models from one discipline to another and transforming them for their specific, mutually consistent purpose.

Multiple Objective Input-Output Analysis in Energy and Environmental Planning (다목적 산업연관분석을 이용한 에너지.환경계획)

  • 강희정;차재호;유왕진
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.46
    • /
    • pp.207-219
    • /
    • 1998
  • Multiple Objective Programming(MOP) has been suggested for the solution of completed decision problems. Decision analysis in numerous areas, including energy and environmental planning, necessarily requires consideration of multiple conflicting objectives, MOP has been successfully applied to a number of these problems. The objective of this paper is to present a MOP process which are integrated model with the Input-Output(I-O) analysis for energy and environment planning in industrial sectors. In the model, three objectives are observed such as (1) value added (2) total energy consumption and (3) environmental impacts. Special emphasis is placed on the police implications of industrial structures.

  • PDF

Laser Ablated Carbon Thin Film from Carbon Nanotubes and Their Property Studies

  • Sharon, Maheshwar;Rusop, M.;Soga, T.;Afre, Rakesh A.
    • Carbon letters
    • /
    • v.9 no.1
    • /
    • pp.17-22
    • /
    • 2008
  • A carbon nanotube (CNT) of diameter ~20 nm has been synthesized by spray pyrolysis of turpentine oil using Ni/Fe catalyst. Pellet of CNTs has been used as a target to produce semiconducting carbon thin film of band gap 1.4 eV. Presence of oxygen pressure in the pulse laser deposition (PLD) chamber helped to control the $sp^3/sp^2$ ratio to achieve the desired band gap. Results are discussed with the help of Raman spectra, SEM TEM micrographs and optical measurements suggest that semiconducting carbon thin film deposited by PLD technique has retained its nanotubes structure except that its diameter has increased from 20 nm to 150 nm.

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

A Passive Traffic Signal Priority Control Algorithm for Emergency Vehicles (긴급차량 우선신호 센터제어 알고리즘 개발)

  • Lee, Jongwoo;Lee, Soong-bong;Lee, Jinsoo;Um, Ki Hun;Lee, Young-Ihn
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.3
    • /
    • pp.110-119
    • /
    • 2017
  • This study develops a passive traffic signal priority control algorithm for emergency vehicles. The passive priority control estimates and applies signal times for each signalized intersection on the emergency vehicle's route when an emergency call is received. As signals are controlled before the emergency vehicle leaves for its destination, it is possible to clear the queues at each intersection more effectively. Most of the previous studies applied preemption, which ends green time of cross streets when the emergency vehicle arrives at each intersection. This study applies green extension and early green in order not to shift the order of phases, and guarantees minimum green time for each phase. Simulation results show that the delay of emergency vehicles decreases when the signals are controlled. It is expected that delays can be decreased further by integrating the active priority control with the passive priority control algorithm presented in this study.

Front End Planning Tool (FEPT) Based on an Electronic Process Management

  • Safa, Mahdi;Haas, Carl T.;Hipel, Keith W.;Gray, Joel
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.1-12
    • /
    • 2013
  • Research indicates that good front-end planning (FEP) results in the achievement of higher levels of project performance. By facilitating collaboration among stakeholders in diverse locations with the use of workflow-enabled processes, such pressures can be reduced, and the overall process and results of FEP can be improved. With these goals, a front-end planning tool (FEPT) has been developed as support for owners and major contractors who are engaged in front-end planning. This paper presents the new FEPT and describes how it has been used for construction megaprojects in the nuclear power, oil and gas, and mining industries. The paper begins with the definitions related to and an explanation of the general process for implementing and applying the FEPT and then describes and analyzes how the FEPT was applied in case study projects in order to test its validity. The results indicate that the FEPT increases the efficiency and effectiveness of front-end planning for the megaprojects studied and that it has the potential to produce similar results for other megaprojects.