• Title/Summary/Keyword: environmental construction company

Search Result 140, Processing Time 0.032 seconds

Developing of Construction Project Risk Analysis Framework by Claim Payout and its Application

  • Kim, Ji-Myong;Park, Young Jun;Kim, Young-Jae;Yu, YeongJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.192-194
    • /
    • 2015
  • The growing size and complex process in construction project recently leads to increase risk and the losses as well. Even though researchers have identified the major risk indicators, there is lack of comprehensive and quantitative research for identifying the relationship between the risk indicators and economic losses associated with construction projects. To address this shortage of research, this study defines risk indicators and create a framework to assess the influence of economic losses from the indicators. An insurance company's claim payout record was accepted as the dependent variable to reflect the real economic losses. Based on the claims, we categorized the causes and results of accidents. To establish framework, built environment vulnerability indicators and geographical vulnerability indicators were employed as the risk indicators. A Pearson correlation analysis was adopted to validate the relationship with loss ratio and risk indicators. Consequently, this framework and its results may offer significant references for under writers of insurance companies and loss prevention activities.

  • PDF

The Optimization of Hyperbolic Settlement Prediction Method with the Field Data for Preloading on the Soft Ground (쌍곡선법을 이용한 계측 기반 연약지반 침하 거동 예측의 최적화 방안)

  • Choo, Yoon-Sik;Kim, June-Hyoun;Hwang, Se-Hwan;Chung, Choong-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.457-467
    • /
    • 2010
  • The settlement prediction is very important to preloading method for a construction site on a soft ground. At the design stage, however, it is hard to predict the settlement exactly due to limitations of the site survey. Most of the settlement prediction is performed by a regression settlement curve based on the field data during a construction. In Korea, hyperbolic method has been most commonly used to align the settlement curve with the field data, because of its simplicity and many application cases. The results from hyperbolic method, however, may be differed by data selections or data fitting methods. In this study, the analyses using hyperbolic method were performed about the field data of $\bigcirc\bigcirc$ site in Pusan. Two data fitting methods, using an axis transformation or an alternative method, were applied with the various data group. If data was used only after the ground water level being stabilized, fitting results using both methods were in good agreement with the measured data. Without the information about the ground water level, the alternative method gives better results with the field data than the method using an axis transformation.

  • PDF

An Analysis of Streambed Changes Downstream of Daecheong Dam

  • Seo, Hyeong-Deok;Jeong, Sang-Man;Kim, Lee-Hyung;Choi, Kyu-Ho
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.1
    • /
    • pp.103-108
    • /
    • 2008
  • Riverbed change is greatly influenced by artificial factors such as dam construction, gravel collection, and river improvement. This study simulated a long-term bed change based on the GSTARS3 model using actual data from the area downstream of the Geum River Daecheong Dam and compared the estimation with a section of the actual measurement. As a result, it was found that the section of the actual measurement was far lower than the result of the simulation in terms of long-term bed change. While the area downstream of Daecheong Dam displayed approximately an average of 2.29 m of streambed degradation on average while the upper stream area showed approximately 0.63 m of bed degradation over 24 years. In the simulation of the area downstream of Daecheong Dam based on the GSTARS3 model, similar bed degradation was observed. However, a great difference was detected between the result and the actual measurement. According to the cause analysis, the riverbed in the area downstream of Daecheong Dam has continuously degraded due to the dam construction and mass collection of gravel. The mass collection of gravel was the main cause of riverbed change. It was found that about 76% of all riverbed degradation was caused by the mass collection of gravel.

Analysis of Importance by Defect Type in Apartment Construction (공동주택 건축공사 하자유형별 중요도 분석)

  • Kim, Do-Hyung;Lee, Dongyoun;Lee, Hak-Ju;Min, Yoon-Gi;Park, Insung;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.357-365
    • /
    • 2020
  • While numbers of apartment housing are continually rising in the domestic housing construction industry, apartment contractors are currently developing plane models, upgrading facilities, and relevant technology, and investing much efforts to meet the higher demands of consumers. However, the construction process of apartment housing involves the intricate properties of the construction industry such as materials, workforce, equipment, weather, and unpredictable situations. If any of these factors becomes discordant and results in interference and interruption of the construction process, then defects, both functional and aesthetic, are likely to occur due to errors in the plan of industry organizers and constructors. Therefore, this research identifies the types of defects in an apartment construction project and analyzes their relative importance. Firstly, this research reviews the previous research trends and will reduce the needs of this research. Afterward, defect repair costs corresponding to the different defect types are calculated by applying results of the research and performing frequency analysis on defect types included in 'Tenant preliminary research' on apartments constructed by Company A. As a result of analyzing the importance of defect type, the top six activities, including tile, floor, paper hanging, PL window, cabinetry, and kitchen cabinet, are found to be of high importance, and the top six activities in question need of repair and management of defects first. The results of this study will help establish a plan to initially respond to such problems as refusal to move in and filing a defect suit against delay in repairing defects.

Application of sand compaction pile method of row replacement ratio as foundation of the dyke (호안기초로서 저치환율 모래다짐말뚝 공법의 적용)

  • Jin, Sung-Ki;Kim, Bum-Hyung;Kim, Jong-Seok;Im, Jong-Chul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.472-485
    • /
    • 2008
  • In this study, sand compaction pile method was adopted to improve the soft ground under the permanent dyke, namely west sea dyke of Incheon New Port. The row replacement ratio 30% was applied to consider the ground condition, environmental side and the construction cost of the site. The stability and displacement analysis was carried out by respectively SLOPE/W and PLAXIS 2D program. Based on this analysis, it is found that the safety factor and displacement is within an allowable criteria. The model experiment was carried out using the acryl soil box with $400(H){\times}1200(L){\times}250(W)mm$ to show the displacement of the dyke and behavior of soft ground. Based on this experiment results, it is found that the settlement does not occur from 1 and 2 loading phases and horizontal displacement of 0.0075% occurs from 2 phases. It is also found that the differential settlement occurs 0.05mm corresponding respectively 0.02% and 0.03% of the dyke height(15cm).

  • PDF

MEASUREMENT OF OPERATIONAL ACTIVITY FOR NONROAD DIESEL CONSTRUCTION EQUIPMENT

  • HUAI T.;SHAH S. D.;DURBIN T. D.;NORBECK J. M.
    • International Journal of Automotive Technology
    • /
    • v.6 no.4
    • /
    • pp.333-340
    • /
    • 2005
  • In order to better quantify the contribution from nonroad sources to emission inventories, it is important to understand not only the emissions rates of these engines but also activity patterns that can be used to accurately portray their in-use operation. To date, however, very little information is available on the actual activity patterns of nonroad equipment. In this study, a total of 18 pieces of nonroad equipment were instrumented with collected data including intake manifold air pressure (MAP), exhaust temperature and, on a subset of vehicles, engine rpm and throttle position. The equipment included backhoes, compactors, dozers, motor graders, loaders and scrappers used in applications such as landfilling, street maintenance and general roadwork. The activity patterns varied considerably depending on the type of equipment and the application. Daily equipment operating time ranged from less than 30 minutes to more than 8 hours, with landfill equipment having the highest daily use. The number of engine starts per day ranged from 3-11 lover the fleet with an average of 5 starts per day. The average percent idle time for the fleet was approximately $25\%$ with a range from 11 to $65\%$ for individual pieces of equipment. Duty cycles based on exhaust temperature/throttle position profiles were also developed for two graders and one dozer.

Interaction Analysis between Construction Business Indicators and Business Performance Indicators of Specialty Contractors providing Labors (노무중심 전문건설업체의 건설경기지표와 경영성과지표의 상관성 분석)

  • Kim, Nam-Sik;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1893-1899
    • /
    • 2014
  • This study is to suggest strategies of specialty contractors that provide labors oriented engineering service by interaction analysis between construction business indicators and business performance indicators. For specialty contractors that mainly provides labor oriented engineering service, the amount of construction orders imposes lasting impact to the turnover ratio of current assets supposedly because they are operating current assets to secure labor. In other words, this type of specialty contractors are focused on mobilization of labor not materials or equipment. So, it is determined that they will be able to increase revenue by operating current assets to address current liabilities and labor mobilization.

Near-Field Hydrodynamic Analysis of the Submerged Thermal Discharge Using CFD Model (CFD 모델을 이용한 수중방류 온배수의 근역 동수역학 해석)

  • Hwang, In-Tae;Kim, Deok-Ho
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.23 no.6
    • /
    • pp.466-473
    • /
    • 2011
  • The buoyancy and initial momentum fluxes make near-field dominated by buoyant jet when thermal discharge releases underwater. In order to estimate prediction capabilities of those near-field phenomena, non-hydrostatic RANS applied CFD(Computational Fluid Dynamic) model was used. Condition of model was composed based on past laboratory experiments. Numerical simulations carried out for the horizontal buoyant jet in the stagnant flow and vertical buoyant jet into crossflow. The results of simulation are compared with the terms of trajectory and dilution rate of laboratory experiments and analytic model(CorJET) results. CFD model showed a good agreement with them. CFD model can be appropriate for assessment of submerged thermal discharge effect because CFD model can resolve the limitations of near-field analytic model and far-field quasi 3D hydrodynamic model. The accuracy and capability of the CFD model is reviewed in this study. If the computational efficiency get improved, CFD model can be widely applied for simulation of transport and diffusion of submerged thermal discharge.

Development Acceptable Risk Model for International Construction Projects - Focusing on Small and Medium Construction Companies - (해외 건설 다수 프로젝트 관리를 위한 허용리스크 도출 - 중소·중견 건설기업 관점에서 -)

  • Hwang, Geunouk;Park, Chan Young;Jang, Woosiki;Han, Seung Heon;Kang, Sin Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.90-97
    • /
    • 2016
  • Since Korean construction firms have steadily advanced into the international market, small and medium construction companies (SMCCs) have also advanced in such market. SMCCs's recent trend have clearly shown the changes of contract types from single subcontractor projects to multiple general contracting projects. However, among those multiple projects performed by SMCCs, 1 out of 3 projects were deficit projects that impact the overall pe rformance of the firm. To increase such performance, risk management for in international construction must be managed at the enterprise level for SMCCs. This research aims to create a multiple project management model for SMCCS that employs the concept of acceptable risk to assess the limit risk level for corporation to acceptable. Using the accumulated data from previous survey and International Construction Association of Korea (ICAK), integrated risk of each firm and their profitability of each project are analyzed. Through the analysis, each firm's acceptable risk level is derived. Through the two research steps, acceptable risk algorithm was developed based on corporate integrated risk and profit correlation. To prove the acceptable algorithm relevance, financial statement analysis of 3 corporation was derived that level of acceptable risk and financial statement were available. Through the approach, this research allows the firms to analyze the firm's capability and find projects that suits the firm's situation and capability.

Build up decision making system for management and environment accompany change the environment police (환경정책변화에 따른 경영 및 환경 의사결정체계 구축)

  • Chun Jin-Ku;Kim Byeong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.112-118
    • /
    • 2003
  • This study aims to management and environmental system is a set of a theory logic management tools and principles designed to create the administrative procedures that a company needs to integrate management and environmental concerns into its daily business practices. Integrate environmental considerations of risk reduction and wise resource management into daily business decision making that includes performance and cost. Seek management and environmental solutions that promote competitiveness environmental aspect recognize need for a commitment to continuous improvement of a it's decision making model. Provide business with tools and methodologies to make better environmental choices and understand the environmental effects of resource flows. A last of understand use of the Decision Making element principal as a guideline for evaluating and ranking approaches. The result of this study are summarized as follows; (1) setting for approach decision management select of the change environment police, (2) making improvements of developing operational controls setting targets, (3) measuring and achieving success of EMS, (4) decision making system on the Environment and Management