• Title/Summary/Keyword: engineering & procurement & construction(EPC)

Search Result 47, Processing Time 0.024 seconds

A Study on Information Breakdown through the Analysis of Industrial Engineering EPC Business Process (산업설비 EPC 업무 분석을 통한 정보 분류 내역에 관한 연구)

  • Cho, Hang-Min;Song, Young-Woong;Choi, Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.167-172
    • /
    • 2006
  • It follows recently in an order augmentation of overseas construction market plant field and the project of oil gas field is increasing. Consequently, the hazard which secures the competitive power of the overseas plant enterprise of the domestic building industry enterprises the technical competitiveness security which stands, productivity improvement and strategy management propulsion back positive disposal plan establishment are demanded. Even from in that oil gas field of overseas plant enterprise for an industrial competitive power improvement the application of EPC circulation information which relates with a project accomplishment is more demanded, the EPC phased star efficiently it manages the circulation information contents which occurs from the business which is various it is not presented it cannot there is a contents classification system for. If with him about lower the draft the problem point of information omission back of occurrence and business subject for of the fringe land and duplication business occurs, about lower the productivity decrease actual condition is appearing with such problem point. The research which it sees consequently in order to improve the use characteristic of the augmentation of practical application of the contents management system of oil gas field and building industry information civil official establishhes the contents management system the BPM for (Business Process Management) to present the contents classification system of base, it does to sleep. The part of Business Process materiality the knowledge which is demanded, contents information and system anger it analyzes system anger of industrial equipment circulation information it takes a triangular position and to sleep it does.

  • PDF

A Systems Engineering Approach to FEED Work Process Development for Refinery Plant (시스템 엔지니어링 접근 방법에 의한 정유 플랜트의 FEED 수행 업무 프로세스 개발)

  • Kim, Sun Young;Cha, Jae-Min;Kim, Junpil;Suh, Suk-Hwan;Sur, Hwal Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.1
    • /
    • pp.1-15
    • /
    • 2014
  • Refinery plant producing petroleum products from crude oil has significantly contributed to the creation of the national interests as a leading engineering industries. However, domestic Engineering Procurement Construction (EPC) companies are facing heavy competition for orders. Domestic EPC companies as EPC contractors are faced with some problems such as undertaking responsibility for FEED packages produced by other FEED companies. But domestic EPC contractors are unfamiliar to development and validation of FEED packages. It causes poor profitability and lower competitiveness of domestic companies. It is necessary for domestic companies to have capability to perform FEED activities in order to overcome these limitations instead of focusing on EPC phase after FEED phase. The systematic procedure is needed to perform the FEED activities, however, there are present difficulties on it due to the lack of experience in FEED packages development which require various engineering knowledge of chemical process, mechanics, electrics, instrumentation, civil engineering. This study has applied systems engineering method which is multi-disciplinary approach to derive and verify the solution to meet the customer's needs when the complex system is developed to task execution process development of FEED activities for refinery plant. The problems that may occur in the future were identified in advance by taking into account the various stakeholders and system context through the application of systems engineering. It helps to develop the task execution process systematically. The developed task execution process of FEED activities is planned to make effectiveness verified by engineering professionals experienced in FEED and continually enhance this process by field application.

Problem Analysis and Improvement Strategy for Feasibility Analysis of Overseas Plant Construction Projects (해외 플랜트 건설사업의 타당성 분석 문제점 및 개선방안)

  • Lee, Won-Gyu;Park, Moon-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.3-14
    • /
    • 2010
  • This study investigated and analyzed feasibility analysis case studies, carried out by contractor of EPC LSTK projects in the planning stage to suggest the strategies to solve problems for project improvement. For this, five feasibility analysis case studies of gulf cooperation council (GCC) countries were reviewed and investigated. The results can be summarized as follows: 1) Those factors needed to be analyzed, including cost increase, project delay, quality decrease were insufficiently considered when assessing feasibility. 2) And improvement strategies for three problems mentioned above were suggested based on findings in feasibility analysis. 3) Lastly the process of the project feasibility analysis that can be applied to overseas plant construction project was suggested step by step.

A Preliminary Study on a Method for the Weight Estimation and Calculation of Offshore EPC Projects (해양 공사 EPC 견적용 중량 추산 방법에 관한 기초 연구)

  • Lee, Soo-Ho;Ahn, Hyun-Sik;Heo, Yoon;Bae, Jae-Ryu;Kim, Ki-Su;Ham, Seung-Ho;Lee, Sung-Min;Roh, Myung-Il
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.2
    • /
    • pp.154-161
    • /
    • 2016
  • There are several existing studies for the weight estimation of offshore plants. However, most of them were applicable at the pre-FEED (Front End Engineering Design) stage. In this paper, a preliminary study on a method for the weight estimation and calculation of offshore EPC (Engineering Procurement Construction) projects is made for the use at the estimation stage after FEED. Based on literature surveys including ISO (International Organization for Standardization) 19901-5 about weight estimation, we proposes new weight factors and a weight curve. Weight factors defined in this study include MTO (Material Take-Off), estimated weight, FEED maturity factor, allowance factor, and contingency factor. The proposed method utilizes bottom-up approach for weight estimation and it can be used for the weight estimation and calculation of offshore EPC projects at the estimation stage.

Neutral Data Generation Algorithm for EPC-based Manufacturing Process Collaboration (EPC 기반의 제조 공정 협업을 위한 중립 데이터 생성 알고리즘)

  • Kim, Dong-Gi;Kim, Seung-Hee
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.1
    • /
    • pp.1-9
    • /
    • 2020
  • In highly complex EPC(engineering, procurement, construction)-based manufacturing processes such as shipbuilding and marine plants, it is essential to prepare a way to enable organic working at the site referring to each other's detailed working data for collaboration between partner companies. However, companies cannot share the progress of the sites including working information in real-time due to the use of SW unique to each company and the complex site management system. As a result, the construction process is delayed, and resources are used inefficiently. This study developed a neutral data generation algorithm that can apply the working information in various file formats to a collaborative manufacturing process. In addition, this study verified the accuracy of the algorithm by applying the developed algorithm to the manufacturing process of piping in shipbuilding and marine plants, developing the SW for visualization of working information using the generated neutral data, and comparing the coordinate, shape & dimension and the kind, number, and spec. of BOM. The result confirmed that the accuracy of the coordinate of the neutral data was 99%, and that of the shape & dimension of the neutral data and BOM Spec. was both 100%. It is thought that this study can be used for overcoming the restrictions in information sharing due to the development of informatization at companies and maximizing the share of working file information in a complex manufacturing process.

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.

A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project (석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안)

  • Cho, Hong-Yeon;Yoo, Hoseon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

Strategies for Balancing the Competitiveness between Engineering and Construction in the Korean Infrastructure Industry (국내 토목산업의 설계-시공 균형발전 방안 도출에 관한 연구)

  • Lee, Kang Wook;Han, Seung Heon;Park, Hyung Keun;Chin, Kyung Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.1
    • /
    • pp.347-354
    • /
    • 2013
  • In the recent global construction environment, EPC contracts that integrate planning, design, procurement, and construction have been widely used for industrial facilities. Similarly, as the importance of the engineering capability such as project management consulting(PMC) and front end engineering design(FEED) has been increased, design-build contracts also have been gradually adopted for infrastructure projects. Whereas, the Korean infrastructure industry has fragmentary features which mainly emphasize on the construction sector. Therefore, this study aims at developing strategies for enhancing the engineering capability and for balancing the competitiveness between engineering and construction sectors in the Korean infrastructure industry. To this end, the authors first carried out market analysis for both global and domestic market. Then, a structured survey and expert in-depth interviews were sequentially performed in order to reflect practitioners' perspectives and needs for institutional strategies. As a result, five strategies drawn from this study are as follows: 1) rearranging the government's roles for supporting the engineering sector; 2) establishing institutional bases being compatible with global standards; 3) fostering value-added workforce for undertaking complex tasks; 4) constructing an consortium between an engineering association and general contractors; and 5) building a nationwide collaborative networks for overseas market expansion.

Assessment of FEED Structure and Functions for Project Management of Thermal Power Plant Construction (사업관리 관점의 FEED 업무 프로세스 구조 및 항목 평가 - 화력발전소를 중심으로 -)

  • Kim, Namjoon;Jung, Youngsoo;Yang, Myungdirk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.65-76
    • /
    • 2015
  • FEED (Front End Engineering and Design) is the key area that determines the competitiveness of procurement and construction in the EPC contracts especially in terms of the added value. Nevertheless, previous researches in FEED have been limited to the process and deliverable of design work or the particular management business function (e.g. System Engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED structure and its functions from the project management perspective throughout the whole project life-cycle for thermal power plants. Proposed FEED business procedures are classified into three levels; First level is the classification of FEED business phases, the second level defines major FEED management functions, and the third level is detailed FEED functions. A survey using proposed FEED functions and assessment variable was conducted in order to analyze the current status and the areas for future improvement. It is expected that the proposed structure, functions, and evaluation methodology for FEED management will contribute to effective practice of FEED as well as to improvement of competitive capability for engineering, procurement, and construction (EPC) companies.

A Study on Establishing Facility and Asset Information from Construction Phase (유지보수 및 자산관리를 위한 시공단계 정보 활용에 관한 연구)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.529-532
    • /
    • 2003
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility. Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from all asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.