DOI QR코드

DOI QR Code

시스템 엔지니어링 접근 방법에 의한 정유 플랜트의 FEED 수행 업무 프로세스 개발

A Systems Engineering Approach to FEED Work Process Development for Refinery Plant

  • 김선영 (포항공과대학교 엔지니어링 대학원 (GEM)) ;
  • 차재민 (포항공과대학교 산업경영공학과) ;
  • 김준필 (포항공과대학교 산업경영공학과) ;
  • 서석환 (포항공과대학교 엔지니어링 대학원 (GEM)) ;
  • 서활원 (포항공과대학교 엔지니어링 대학원 (GEM))
  • Kim, Sun Young (Graduate School of Engineering Mastership (GEM), POSTECH) ;
  • Cha, Jae-Min (Dept. of Industrial and Management Engineering, POSTECH) ;
  • Kim, Junpil (Dept. of Industrial and Management Engineering, POSTECH) ;
  • Suh, Suk-Hwan (Graduate School of Engineering Mastership (GEM), POSTECH) ;
  • Sur, Hwal Won (Graduate School of Engineering Mastership (GEM), POSTECH)
  • 발행 : 2014.06.30

초록

Refinery plant producing petroleum products from crude oil has significantly contributed to the creation of the national interests as a leading engineering industries. However, domestic Engineering Procurement Construction (EPC) companies are facing heavy competition for orders. Domestic EPC companies as EPC contractors are faced with some problems such as undertaking responsibility for FEED packages produced by other FEED companies. But domestic EPC contractors are unfamiliar to development and validation of FEED packages. It causes poor profitability and lower competitiveness of domestic companies. It is necessary for domestic companies to have capability to perform FEED activities in order to overcome these limitations instead of focusing on EPC phase after FEED phase. The systematic procedure is needed to perform the FEED activities, however, there are present difficulties on it due to the lack of experience in FEED packages development which require various engineering knowledge of chemical process, mechanics, electrics, instrumentation, civil engineering. This study has applied systems engineering method which is multi-disciplinary approach to derive and verify the solution to meet the customer's needs when the complex system is developed to task execution process development of FEED activities for refinery plant. The problems that may occur in the future were identified in advance by taking into account the various stakeholders and system context through the application of systems engineering. It helps to develop the task execution process systematically. The developed task execution process of FEED activities is planned to make effectiveness verified by engineering professionals experienced in FEED and continually enhance this process by field application.

키워드

참고문헌

  1. Han, D.-H. A Study on Knowledge Management of Procurement Phase for Oversea Plant Project through Business Analysis, KyungHee University, Master Thesis, 2012.
  2. INCOSE. What is systems engineering, 2004, Retrieved July 31, 2013, from http://incose.org/practice/whatissystemseng.aspx
  3. INCOSE, Systems engineering handbook: A guide for system life cycle processes and activities, version 3.2.2, International Council on Systems Engineering (INCOSE), 2011.
  4. ISO/IEC 15288, Systems and Software Engineering-System Life Cycle process, International Organization for Standardization, 2008.
  5. ISO/IEC 26702, Systems engineering-Application and management of the systems engineering process, International Organization for Standardization (ISO), 2007.
  6. Kang, M,-W., Offering Improvement Plans Through Analyzing Procurement Process of Overseas Plant Projects Process, KyungHee University, Master Thesis, 2008.
  7. Lightsey, B., Systems engineering fund amentals, Defense Acquisition University Press, Fort Belvoir, VA, 2001.
  8. Martin, J. N., Systems engineering guidebook: A process for developing systems and products, CRC Press, Boca Raton, FL, 1997.
  9. MIL-STD-499B, Systems Engineering, U.S. Department of Defense, 1994.
  10. PISTEP Consortium, Process Plant Engineering Activity Model (PPEAM), 1994.
  11. Tak, H.-W., A Study on Process Modeling for Efficient Knowledge Management in LNG Plant Project, KyungHee University, Master Thesis, 2011.
  12. Tak, H.-W., Won, S.-K., Hwang, K.-H., Han, C.-H., and Lee, J.-B., Development on Standard Process of Pre-construction phase for Overseas Plant projects, Korean Journal of Air-Conditioning and Refrigeration Engineering, No.6, pp. 806-811, 2010.
  13. Won, S.-K., Kang, M.-W., Lee, J.-B., Kim, S.-K., Han, C.-H., An Analysis of Procurement Processes for the Application of System Prototype of Overseas Plant Projects, Journal of the Architectural Institute of Korea Structure and Construction No.2 Vol. 24, 2008.
  14. Won, S.-K., Lee, J.-B., Han, C.-H., Analysis of Pre-construction Processes and Development of KMS Prototype of LNG Plant Projects, Journal of the Korea Institute of Building Construction No.6 Vol.9, 2009.
  15. Yoo, H.-S., Lee, J.-H., Plant engineering and project management, Korea Institute of Plant Engineering and Construction, 2006.
  16. Yoon, N.-R., A Study on Development of Framework for Knowledge Management System of Overseas LNG Plant Project, KyungHee University, Master Thesis, 2010.
  17. Yoon, N.-R., Tak, H.-W., Won, S.-K., Han, C.-H., Lee, J.-B., Analysis of the Pre-construction Process for Overseas LNG Plant Projects, Korea Journal of Construction Engineering and Management, pp 666-671, 2009.