• 제목/요약/키워드: emergency shut down

검색결과 25건 처리시간 0.031초

수소연료전지 자동차의 긴급대응 가이드 분석 (The Analysis of Emergency Response Guide for Hydrogen Fuel Cell Vehicle)

  • 이광주;이종태;용기중
    • 한국수소및신에너지학회논문집
    • /
    • 제23권2호
    • /
    • pp.156-161
    • /
    • 2012
  • In case of commercializing of the hydrogen fuel cell vehicle, the suitable emergency response guide is necessary to prepare an accident. In order to suggest the suitable guide for the domestic affairs, the existing external guide about GM, Ford, Honda, and Hyundai was reviewed. The emergency response guides in CAFCP and main FC vehicle makers were included in the analysis. As the results, it was found that the design and make of vehicle for the domestic user are demanded in the emergency response and the guide is made with the shut-down manual picked out for the rescuer and repair man as well as user.

독성 화학물질 누출사고 대응 기술연구 - 불산 및 암모니아 누출을 중심으로 - (A Study on the Response Technique for Toxic Chemicals Release Accidents - Hydrogen Fluoride and Ammonia -)

  • 윤영삼;조문식;김기준;박연신;황동건;윤준헌;최경희
    • 한국위험물학회지
    • /
    • 제2권1호
    • /
    • pp.31-37
    • /
    • 2014
  • Since the unprecedented hydrogen fluoride leak accident in 2012, there has been growing demand for customized technical information for rapid response and chemical accident management agencies including the Ministry of Environment, the National Emergency Management Agency, and the National Police Agency need more information on chemicals and accident management. In this regard, this study aims to provide reliable technical data and guidelines to initial response agencies, similar to accident management technical reports of the US and Canada. In this study, we conducted a questionnaire survey and interviews on initial response agencies like fire stations, police stations, and local governments to identify new information items for appropriate initial response and improvements of current guidelines. We also collected and reviewed the Canada's TIPS, US EPA's hydrogen fluoride documents, domestic and foreign literature on applicability tests of control chemicals, and interview data, and then produced items to be listed in the technical guidelines. In addition, to establish database of on-site technical information, we carried out applicability tests for accident control data including ① emergency shut down devide, safety guard, shut down valve, ground connection, dyke, transfer pipe, scrubber, and sensor; ② literature and field survey on distribution type and transportation/storage characteristics (container identification, valve, ground connection, etc.); ③ classification and identification of storage/transportation facilities and emergency management methodslike leak prevention, chemicals control, and cutoff or bypass of rain drainage; ④ domestic/foreign analysis methods and environmental standards including portable detection methods, test standards, and exposure limits; and ⑤ comparison/evaluation of neutralization efficiency of control chemicals on toxic substances.

소방전원보존형 발전기(RFP)의 작동 방법에 관한 연구 (A Study on the Operation Method of Emergency Power System with Reserved Firefighting Power (RFP))

  • 이원강;최충석
    • 한국화재소방학회논문지
    • /
    • 제26권3호
    • /
    • pp.29-34
    • /
    • 2012
  • 본 논문에서는 소방전원 및 소방전원 부족시 용량 보완을 위한 인터록 시스템의 한계점 등을 분석하고 소방전원 보존형 발전기(RFP)의 작동방법 등을 제시하여 화재와 같은 상황에 효율적으로 대응할 수 있는 방법을 제시하는데 있다. 소방전원보존형 발전기에서 일괄제어방식은 발전기에 과부하가 걸리면 소방전원보존용 제어기에서 신호를 발신하여 소방부하는 남겨두고 비상부하용 주차단기를 일괄 차단하고, 발전기가 마지막까지 소방부하에 전원이 공급되도록 한 시스템이다. 순차제어방식은 과부하가 걸리면 소방전원보존용 제어기에서 1차 신호를 발신하여 설정된 비상부하의 1단계 부하를 차단한다. 그리고 지속적인 감시 상태에서 소방부하가 증가하여 발전기가 다시 과부하가 걸리면 제어기에서 2차 신호가 발신하여 비상부하의 2단계 부하를 차단하는 시스템이며 각각의 작동 상태를 표시하는 표시장치를 가진다.

LNG 벙커링용 비상차단 밸브 디스크 변위 제어에 관한 연구 (Disc Displacement Control of the Emergency Shut-Down Valve for LNG Bunkering)

  • 윤진호;박주연;장지성
    • 드라이브 ㆍ 컨트롤
    • /
    • 제18권4호
    • /
    • pp.28-34
    • /
    • 2021
  • Among the currently available types of fuel, LNG emits a relatively small amount of nitrogen oxide and carbon dioxide when it burns in the engine. However, since LNG is a flammable material, leakage during bunkering can lead to accidents, such as fires. Therefore, it is necessary to install a remote operation emergency shut-down (ESD) valve to block the flow and leakage of LNG in an emergency situation that occurs during bunkering. The ESD valve uses a hydraulic driving device consisting of a hydraulic control valve and a hydraulic motor to control globe valve disc displacement, which regulates the flow path for LNG transfer. At this time, there are various nonlinearities in hydraulic driving devices; hence, it is necessary to design a controller with robust control performance against these uncertainties. In this study, modeling of the ESD valve was carried out, and a sliding mode controller to control the displacement of the globe valve disc was designed. As a result, it was confirmed that the designed control performance could be achieved by overcoming nonlinearity characteristics using the designed controller.

볼밸브를 사용한 송수펌프장에서의 수격현상 (Waterhammer in Transmission Pumping Station with Ball Valve)

  • 김경엽;김점배
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2004년도 춘계학술대회
    • /
    • pp.1697-1702
    • /
    • 2004
  • The waterhammer has recently become more important because the pumping stations were big and the systems conveying the fluid through the large and long transmission pipelines were complex. When the pumps are started or stopped for the operation or tripped due to the power failure. the hydraulic transients occur as a result of the sudden change in velocity. In this paper, the field tests on the waterhammer by the startup, stoppage, and power failure of a centrifugal pump were carried out for Yongma transmission pumping station in Seoul. The experimental results were compared with that of the numerical calculations. in which results the procedure of controlled pump normal shut-down and the two-step closing mode of controlling the ball valve for pump emergency stop are proposed to reduce the pressure surge.

  • PDF

발전소 주급수 계통 감발 과정에서의 스윙체크밸브 닫힘 시점의 실험적 결정 (An Experimental Determination of a Swing Check Valve Closure Time in the Main Feed Water System of a Power Plant during Shut-down Process)

  • 서진성;김원민
    • 한국소음진동공학회논문집
    • /
    • 제19권8호
    • /
    • pp.843-849
    • /
    • 2009
  • The reliable operation of a swing check valve in the main feed water system of a power plant is most essential for successful shout-down process. A failure to close the valve at proper time often leads to the instability of the main feed water system, or even to an emergency stop of the power plant. In reality it is a very difficult task to monitor the behavior of a swing check valve. Furthermore it is impossible to see the motion of the valve. In this work two measurements were carried out simultaneously to determine the precise valve closure time. The dynamic pressure measurements were made at the inlet and outlet regions of the swing check valve. The transient vibration of the valve housing in the direction of water flow was also measured, which enabled the measurement of the transient vibration of the valve housing near valve closure. By comparing the results produced from these measurements the precise valve closure time could be determined. By carrying out order tracking technique using the dynamic pressure signals and pump rpm signal, the complicated dynamic problems inside the main feed water system can be more easily dealt with. This measurement scheme might be implemented in a power plant on a real-time basis without much difficulty. If this could be implemented, valuable information essential for shut-down operations can readily be passed on to the main control room. The feasibility of this implementation was demonstrated by this experimental work.

건축물의 비상전원 적용실태 및 자가발전설비의 안전 운전 모델에 관한 연구 (Analysis on Emergency Power Supplies in Buildings and a Model for Safe Operation of the Emergency Power System)

  • 이원강;최충석
    • 한국안전학회지
    • /
    • 제27권3호
    • /
    • pp.49-56
    • /
    • 2012
  • The purpose of this paper is to present a model for operating an emergency power system(EPS) that can secure a sufficient power supply used in case of a fire by analyzing the status of power supplies for emergency and firefighting operations. Investigations on the one of the causes of the operational failure of firefighting systems show evidence of EPS. Generally, when power to a building is interrupted, EPS supplies the emergency load(excepted firefighting load) first. When a power outage and a fire occur simultaneously, the EPS must be able to supply both the emergency load and the firefighting load, especially the firefighting load to the end. However, in order to save construction costs, emergency power generators in apartment, commercial, and business buildings can satisfy only one of the required loads. In cases like this, when a power outage and a fire occur simultaneously, there is a danger of firefighting equipment not operating due to insufficient power supply from the emergency generator. Therefore, an EPS must have a reserved firefighting power that can supply both the firefighting and the emergency load. Such EPS, when faced with a danger of an overload, will shut down the supply to all or part of the emergency load, thus securing a continuous power supply to the firefighting equipment. The generator power system with reserved firefighting power (RFP) will also have an indicator to show that the selective control is being used. General power generation systems for emergency load and firefighting load were found to have a demand factor of 50-60% with a lump. However, when installing an EPS, the builders must choose the higher demand factor suggested according to the official approval demand factor of the building.

최소 컷셋법에 의한 화력발전소 기동전원의 신뢰도 예측에 관한 연구 (A Study on the Reliability Evaluation of Start-up Power Supply in Fossil Power Plant by Minimal Cut-Set Method)

  • 최규식
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권4호
    • /
    • pp.358-364
    • /
    • 1999
  • The auxiliary transformers or start-up/stand-by transformer(s) are installed against the start-up and shut-down of generator and emergency status in fossil power plant. The on-site power supply configuration using these transformers must be determined, considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and ecfonomy of plant. The auxiliary or start-up/stand-by power supply configuration has been determined considering only safety requirements and construction cost until now in Korea. This paper presents general theorems for the reliability estimation and proposes 2-unit based 4 alternatives for the start-up power supply stystem of 500㎿ standardized fossil power plant. The reliability and unavailability of equipment, system and configuration are determined using minimal cut-set methodology. The optimized plan of 4 alternatives is determined based on this ultimate reliability and unavailability.

  • PDF

FTA기법에 의한 원전기동전원의 이용율 예측에 관한 연구 (A Study on the Availability Prediction of Start-up Power Supply in Nuclear Power Plant by FTAMethod)

  • 최규식
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권5호
    • /
    • pp.517-523
    • /
    • 1999
  • The Start-up transformers or on-site stand-by transformers are installed for the start-up and shut-down of generator and emergency status in unclear power plant. The on-site power supply configuration using these transformers must be detemined by considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and benefit of plant. The start-up or stand-by power supply configuration has been determined considering only safety requirements and construction cost up to now in Korea. I study various reliability estimating methods for the prediction of availability, and estimate the unavailability for the start-up power supply system of two 1,000㎿ unclear power plants. I also detemine the reliability and unavailability and unavailavility of equipment, system and configuration using FTA method.

  • PDF