• 제목/요약/키워드: electric power installation

검색결과 737건 처리시간 0.045초

전력저장시스템 기술개발 국외동향 분석 및 국내 활용방안 연구 (Study on the Oversea Technology Development of Electric Power Storage System and It's Domestic Application)

  • 최경식;양승권
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2008년도 추계학술대회 논문집
    • /
    • pp.57-60
    • /
    • 2008
  • As the technology of a large scale battery have advanced, it's application to the electric power network have been active in foreign country. By providing the electric power energy stored in the electric power storage system when needed, there are many advantages that it is able to reduce the gap between the electric power demand and supply for day and night to increase capacity factor, to upgrade the electric power quality degraded from the unbalance between power demand and supply and to compensate the fluctuation of wind power plant and photovoltaic power generation. In this study, the current application of electric power storage system using battery is introduced in detail, and I have thought out it's application fields based on the foreign examples. These are demand side response, upgrade of the power quality, stabilization of fluctuation of renewable energy and distributed generation for filling elapse.

  • PDF

전선의 최단거리 루트 선정을 통한 공사비용 절감 방안 (Cost Reduction through Shortest Path Connection of Electric Power Line)

  • 이상중;윤준영
    • 조명전기설비학회논문지
    • /
    • 제25권5호
    • /
    • pp.34-38
    • /
    • 2011
  • The shorter the electric power line is, the less its cost becomes. In this paper, the Steiner tree is applied to find the shortest path of the electric power line to obtain resultant cost reduction. Up to 18.3[%] of length reduction can be expected compared to conventional method when the lines are connected through the Steiner points, which also can result in appreciable cost reduction.

2도체 송전선로의 스페이서 취부방식 연구 (A Study on the Spacer Installation Method for 2-Conductor Bundle Transmission Lines)

  • 민병욱;김우겸;최한열;박기용;김원진;박재웅
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.333-334
    • /
    • 2008
  • Overhead transmission lines are classified by the number of sub conductors per phase. Korean transmission lines use two, four, or six-conductor bundle. Bundle of conductors must have spacers or spacer dampers which keep the proper distance between sub conductors. They can prevent conductors from being vibrated or twisted due to the wind. As for the two-conductor bundle, alternating current flow generates absorption force between sub conductors which may cause a collision of sub conductors. To prevent sub conductors from being vibrated, twisted, and collided, spacer or spacer damper installation method is designed considering vibration characteristics of sub conductors. We have spacer installation method for four or six-conductor bundle lines. However, we don't have it for two-conductor bundle ones. So we have installed spacers at regular intervals in two-conductor bundle lines, and it caused rigid body oscillation of conductors due to the wind which made a flashover between conductors. This paper introduces a vibration characteristic analysis of two-conductor bundle and proposes a spacer installation method for two-conductor bundle lines.

  • PDF

공항 수.배전 설비 표준화 (Standardization for receive and supply of electric power facility of airport)

  • 최홍규;원진희;송영주;조계술
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2003년도 학술대회논문집
    • /
    • pp.349-354
    • /
    • 2003
  • Airport facility is infrastructure that become external creditworthiness and linear measure of country competitive power. Among them, receive and supply of electric power facility of airport is very important in peculiarity, trustability, safety side of airport. In this parer, sorted domestic airline as 4 classes by code to accomplish standardization for receive and supply of electric power facility of airport. And established justice and coverage about receive and supply of electric power facility using without any standard present and analyze problem for receive and supply of electric power facility of existing airport and presents standard. Finally, present standard single-line diagram by airport grade and system grade standard of receive and supply of electric power facility of airport.

  • PDF

전력선을 이용한 광케이블 현장 실증 시험 (A field trial of helically wrapping fiber optic cable onto existing 154KV Phase conductor.)

  • 신건학;이원빈;조홍근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1987년도 정기총회 및 창립40주년기념 학술대회 학회본부
    • /
    • pp.143-146
    • /
    • 1987
  • Fiber optics provide a solution to the problems at interference, capacity and reliability in communication. Approximately 20 kilometera of a six-fiber, multimode, longwave($1.3{\mu}m$), graded index silica glass fiber optic cable was helically wrapped around a phase conductor at a Korea Electric Power Corporation(KEPCO) 154KV transmission line. This paper presents an economic comparison of several fiber optic cable installation alternative and discusses the characteristics at the helically wrapped fiber cable, as well as the entire installation, including high voltage phase-to-ground (PTG) end termination, and splicing. The fiber link was installed for the field trial and practical use with overhead composite optical fiber cable which installation performed a few years earlier some other location and is intended to accommodate not only telephone but also supervisory Control and Data Acquisition(SCADA), protective relaying, and telemetry functions.

  • PDF

345kV XLPE 2000$mm^2$ 케이블의 기계적특성 고찰 (The mechanical characteristics of 345kV XLPE cable)

  • 남석현;백주흠;허회덕;이수현;김철민;이수길
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 C
    • /
    • pp.1688-1690
    • /
    • 2001
  • The mechanical characteristics of XLPE cable is basic to the installation design. Especially, snake and offset design require accurate coefficient of linear expansion($\alpha$), Young's modulus(E) and bending stiffness(El) of the cable. In this paper, $\alpha$, E and El of 345kV XLPE cable was measured by experimental setup, and verified by measuring axial tension and lateral displacement in snake installation.

  • PDF

태양광 발전소의 전기설비 설계 및 저압 계통연계 적용사례에 관한 연구 (A Study on electric facilities plan and application of low-voltage grid connection for a photovoltaic electric power station)

  • 임경미;김경화
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2009년도 춘계학술대회 논문집
    • /
    • pp.305-308
    • /
    • 2009
  • This paper resents a study on the electric facilities plan and application of low-voltage grid connection for a photovoltaic electric power station. The analysis for an installation cost is carried out and a new plan to solve the problem caused by a voltage drop in a low-voltage grid connection is devised. It is expected that the results can be usefully applied to spread the photovoltaic electric power station.

  • PDF

아크 회로의 특성 분석 및 AFCI 설치로 인한 사회적 비용평가에 관한 연구 (Research on Characteristics of Arcing Circuit and Evaluation of Societal Cost caused by AFCI Installation)

  • 박치현;배석명;임용배;김기현;최명일
    • 조명전기설비학회논문지
    • /
    • 제21권8호
    • /
    • pp.144-150
    • /
    • 2007
  • 전력사용이 증가함에 따라 전기설비에 의한 전기화재 발생이 증가하고 있다. 통계에 따르면 전기화재가 화재원인 중 가장 높은 비중을 차지하고 있음을 알 수 있다. 그럼에도 불구하고 전기화재를 사전에 예방할 수 있는 조사기법이 아직은 부족한 실정이다. 이 논문은 전기화재 원인과 아크차단기의 특성에 관하여 분석한다. 먼저 아크차단기와 기존의 배선용 차단기를 비교하고 전력의 수학적 분석을 통해 아크에 의한 위험성을 분석하고 회로의 단락에 의한 위험성과 비교한다. 또한 아크차단기 설치와 사회적 비용간의 관계에 대해 알아봄으로써 아크차단기의 필요성을 제기한다.

건설현장 임시전력 배선의 가설직무에 대한 인간신뢰성 평가 (Human Reliability Assessment for a Installation Task of Temporary Power Cables in Construction Fields)

  • 김두현;이종호;김상철
    • 한국안전학회지
    • /
    • 제20권2호
    • /
    • pp.61-66
    • /
    • 2005
  • This paper presents an human reliability assessment(HRA) for a installation task of the temporary power cable in construction fields. HRA is evolved to ensure that the workers could reliably perform critical tasks such as a process of the temporary power cable. Human errors are extremely commonplace, with almost everyone committing at least some errors every day. The considerable parts of electric shock accidents in the construction field are caused by a series of human errors. Therefore it is required to analyze the human errors contained in the task causing electric shock event, the event tree analysis(ETA) is adopted in this paper, and particularly human reliability was estimated for a installation task of the temporary power cables. It was assumed that the error probabilities of the human actions may be obtained using the technique for human error rate prediction(THERP). The results show that the predominant task on reliability in the cable installation tasks is check-out tasks and the probability causing electric shock by human errors was calculated as $1.0\times10^{-9}$.