STUDY ON LCC ANALYSIS OF BUILDING ACCORDING TO STRUCTURES - FOCUSING ON MILITARY ESTABLISHMENTS -

  • Hyo-Joong Kim;Jung-Whan Oh ;Min Yu ;Mi-Hye Lee ;Young-Dong Yu ;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1187-1192
    • /
    • 2005
  • Approximately 25% of military establishments became superannuated to unable perform their function, and it influences on the environment by construction wastes and the waste of national budget, as there is no rational and objective standard even though old facilities have been replaced through modernization project. Therefore, it has been searched to introduce industrial building system that can cope with the new building-construction and transference for the improvement of existing military establishments. However, as there is no economical estimation standard for practical use, industrial building-construction is still remaining at the initial stage, and the study is insufficient too. So. in this study, I would like to develope LCC cost model for rational LCC comparative analysis between industrial construction system (Modular) and existing reinforced concrete structure and cage, and to evaluate economical efficiency through case analysis.

  • PDF

ENVIRONMENTAL ECONOMICS FOR CONSTRUCTION

  • Suk hyun Kwon;Nam Ho Cho;Kyoung Hee Lee;Kyoung Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.280-285
    • /
    • 2011
  • This study aims to propose an assessment model on environmental economics which will provide useful information in making a decision for the implementation of pro-environmental and economical construction projects. To meet the objective, this study suggests a procedure to estimate environmental cost of construction projects. The model combines environmental load assessment and environmental value assessment. The environmental cost of pollutant generated from the construction project was estimated utilizing the Contingent Valuation Method (CVM) which is a value assessment method borrowed from economic science. The devised model is expected to provide a useful methodology that will scientifically support the planning and management of sustainable construction not only in the environmental aspect but also in the economical aspect.

  • PDF

The Case Study of the Effective Management of the Site Using Measurement Result During the Excavation Construction (굴착공사 중 계측결과 활용을 통한 효과적인 현장관리 사례 분석)

  • NamGung, Han;Jung, Kyoung-Sik;Koh, Hyung-Seon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.428-444
    • /
    • 2010
  • After underground excavation being introduced in dometic, many technologies have been storing up. One of them, measurement, has been recognized as an important item under excavation construction. But, unlike a large-scale construction, it was not been treated importantly at the general small-scale structures with poor ordering and original design was unchanged under construction was normal if the problem didn't occur on monitoring. In this paper, the site which safe and economical management as well as shortening construction period was made effectively using measurement result was introduced. Also, the site which was completed safely with analyzing measurement and reinforcement when unusual symptom happened was introduced. Using measurement result effectively will be able to obtain the safety and prevent unnecessary economical loss.

  • PDF

RESEARCH AND DEVELOPMENT OF PROGRAM MANAGEMENT SUPPORTING SYSTEM

  • Tetsuya Yamada;Shigehiko Tanabe
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.480-489
    • /
    • 2007
  • Program management is a concept to deal with huge and complex business activities from social, economical, cultural and environmental points of view and increase their value for client and society. The aim of this study is to establish a framework of program management process and develop a supporting system for program management. In this paper we propose a framework and a proto type supporting system based on case studies and report the result of application to an urban redevelopment using partially implemented software.

  • PDF

Economic Evaluation Method by Design Method ASD and LRFD of Aluminum Curtain wall (알루미늄 커튼월의 ASD/LRFD설계방법에 따른 경제성 평가 방법)

  • Moon, Sang-Deok;Ock, Jong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.16-17
    • /
    • 2014
  • The curtain wall construction applied on high-rise building facades in Korea became generalized, but specialty of the CMr(Construction Manager) who needs to perform economical project management with specialty in the curtain wall construction is still lacking. Therefore, this study analyzed the structure design standard of the curtain wall, researched economical design alternatives. Based on the research results, if the ratio of dead load against wind load is less than 0.1256, LRFD will be more economical.

  • PDF

Characteristics of Negative Skin Friction of Foundation Pile and Construction Management by Experimental Field Test (현장시험을 통한 기초 말뚝 부마찰력의 특성과 시공관리)

  • Hong, Seok-Woo
    • International Journal of Highway Engineering
    • /
    • v.14 no.3
    • /
    • pp.41-48
    • /
    • 2012
  • In this study the negative skin friction test of foundation pile was performed in order to monitor the negative skin frictional force acting on the steel pipe pile installed in soft soil. The monitored frictional stresses obtained from the long-term loading test. Through the long-term frictional stress monitoring test, the economical period for the construction of the superstructure was determined. The following conclusion were derived from this study: (1) In soft soil, negative skin friction increases with the increase in the rate of settlement. (2) In the friction relationship graph, the period where there is no frictional strain increase is verified and the time for the construction of the superstructure is determined. (3) The pile loading test was performed and the negative skin friction was compared with the test results. It was determined that the negative skin friction after driving was larger than the negative skin friction obtained from the loading test. 15 days after the construction, the monitored value was similar with the theoretical data. (4) It was determined that even during the occurrence of negative skin friction an economical construction management can be performed using the long-term monitoring method of negative skin friction.

RISK MANAGEMENT IN CIVIL CONSTRUCTION PROJECTS - FROM COST ESTIMATING PERSPECTIVE

  • Ashley Jaensch;Jian Zuo;Nicholas Chileshe
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.162-167
    • /
    • 2011
  • Construction projects are full of risks. This is particularly the case in civil construction projects that are often featured with large scale, complexity and involving a large number of participating parties. The eventuation of risks typically results in extended project durations leading to an increase in the total project budget. The consequence can be amplified considering the significant impacts of civil construction projects on the society, from economical, environmental and social perspectives. This research investigates the significance of risks within civil construction projects and approaches to deal with risks. Semi-structured interviews were undertaken with local industry practitioners in South Australia on this matter. It is found that the industry is fairly aware of risks associated with civil construction projects and subsequently has procedures in place to attempt to minimize the impacts of these risks on the project outcomes. The interview results also indicate that there is limited utilization of software for the risk management purpose from the cost estimation perspective.

  • PDF

The Study on the Risk Assesment of Formwork (거푸집공사 위험성 평가에 관한 연구)

  • 고성석;오준호
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.3
    • /
    • pp.96-101
    • /
    • 2002
  • The object of risk assesment is to prevent the accident from arising. The main reason for risk assesment of construction work is to determine priority order of improvement plan about risky work. Formwork is a complicated process that determines the total duration of apartment construction, and occupies 10∼15% of total construction expense, and 17% of serious accidents occur during formwork. So, formwork occupies very importment roles in work sites, economical efficiency and safety. We need to identify the work type with a high risk of accidents, and to establish suitable safety counterplan and implement intensive safety management.

A Review of the Domestic Construction Waste Management Guidelines (국내 건설폐기물 관리 지침 고찰)

  • Kim, Jee-Hye;Cha, Hee-Sung;Shin, Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.425-430
    • /
    • 2007
  • Although waste management in construction industry has a significant impact on both economical and environmental issues, the current level of waste management performance in Korean construction is reported as relatively low. In this context, this study aimed to suggest the considerations for the improved construction waste management guideline, which leads to the effective waste management on a construction site. In order to reach this goal, the existing domestic construction waste management guidelines were analyzed based on the criteria of the environmental management procedure of ISO 14001. These considerations were described in three aspects such as "planning", "implementation and operation", and "checking and corrective actions".

  • PDF

RELEVANT CODES AND REGULATIONS: EFFECTS ON THE DESIGN OF INDUSTRIAL CONSTRUCTION

  • Ahmed Abdallah
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.409-416
    • /
    • 2005
  • This paper presents the possible effects and restrictions that may arise in the field of industrial construction due to compliance with relevant construction codes and regulations, as well as the ways they can be favorably handled in the design of industrial buildings. Designs should be based primarily on human design factors, while considering the human as the centre of the work environment. Design parameters should be described as a function of both the physical and psychosocial attributes of a person as well as the technical and economical aspects on the design of industrial construction. This paper is an examination of the connection that exists between design law (codes and regulations) and industrial construction. The relevant construction laws and regulations are described, including standards and codes of practice that designing and supervising engineers are obliged to observe. Possible solutions and consequences of development in the production, constructional, and ergonomic field of design are also discussed.