• Title/Summary/Keyword: economic calculation

Search Result 377, Processing Time 0.026 seconds

Analysis of Economic Lifespan for Replacement Policy of Container Ship using Fuzzy Interval Numbers

  • Jang, Woon-Jae
    • Journal of Navigation and Port Research
    • /
    • v.35 no.2
    • /
    • pp.173-178
    • /
    • 2011
  • This study determined the ship replacement life expectancy from an economic perspective. There are many ambiguities in the cost for calculation of economic lifespan, and these were expressed as fuzzy numbers. Also, a fuzzy cost model using fuzzy numbers was developed and suggested as a more practical analysis method than the existing cost model. And the suggested fuzzy model was used to determine the economic lifespan for various types of container ships. As the result, Without fuzziness, the economic lifespan of 5000 TEU Ships was found to be 19 years. it was found that the greater the container ship, the greater the economic lifespan was.

A Study on the Electrical Resistivity Prospecting for Geologic Model Strata (지층모형(地層模型)에 의(依)한 전기비저항(電氣比抵抗) 탐사법(探査法) 연구(硏究))

  • Min, Kyung Duck;Lee, Young Hoon
    • Economic and Environmental Geology
    • /
    • v.12 no.1
    • /
    • pp.1-12
    • /
    • 1979
  • A model study was conducted for the interpretation of simple geologic structures. Experiments were carried out for the cases of two horizontal beds and dipping beds in a water tank by using Wenner and Schlumberger arrays respectively. As a geologic stratum of experimental model, cement be (cement: sand=1:2) of $70cm{\times}60cm{\times}10cm$ was used. It was found out from a preliminary experiment that a measuring sounding of Wenner arrays is one third of the distance between two current electrodes, and Schlumberger arrays is one fourth of the distance which is a half of the value determined by usual method of calculation. Equi-resistivity curves were obtained for the cases of horizontal beds and dipping beds, and mapped on the longitudinal and cross sections of the water tank. These curves delineate the shape and degree of dip of bed to some extent. The calculation of depth to beds by using a master curve is somewhat complicated and inexact. In this study, new method for this calculation using a ${\rho}_a/{\rho}_1-a$ graph was proposed, and turned out that this method is simpler and exact.

  • PDF

Matrix Method in Multiple Projection through Plagioclase (사장석(斜長石)을 포함(包含)한 복수투영(複數投影)에 있어서의 행렬식(行列式) 이용(利用)에 관(關)한 연구(硏究))

  • Lee, Sang Hun
    • Economic and Environmental Geology
    • /
    • v.17 no.4
    • /
    • pp.283-288
    • /
    • 1984
  • Projection method has been used in the phase equilibria study. The projection is made through the saturated phase on the smaller chemical system from larger system. This decreases the number of phases which are included in the larger chemical system. In multiple projection containing plagioclase as a projection phase, there is a difference in matrix calculation when plagioclase is treated as a single composite component and separately as an albite and anorthite. The matrix calculation is considered to be more usable and easier in multiple projection. The value of the A component in the AFM system, which is the smaller system projected from the larger one, is effected and varies according to the change in the An content in plagioclase that is examined as an example.

  • PDF

A Study of Economic ESS Utilization Based on Supplement Control Plan for Stable Wind Energy Extraction (풍력발전의 전력공급 안정화를 위한 ESS 보조제어 기법과 경제적 용량 산정 연구)

  • Jung, Seungmin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.1
    • /
    • pp.22-28
    • /
    • 2018
  • In case of developing a combined system by a number of distributed resources with storage device, a number of application suggests a huge capacity can derive operational flexibility both power supply issues or when unexpected situation imposed. However, it is important to determine a resonable energy capacity because the device have many controversial cost issues in current power system industry. An ESS application which focusing essentially required points can induce appropriate storage capacity that required in economic operation. In this paper, a curtailment supporting algorithm based on storage device is introduced, and applied in the capacity calculation method. The main algorithm pursues handling minor exceeding quantities which can cause mechanical load at blade; This paper tries to include it for configuring hybrid algorithm with pitch control. Several fluctuating conditions are utilized in simulation to reflect critical situation. The analyzing process focuses on the control feasibility with applied capacity and control method.

Study of Economic Damage Due to Windows Device Driver Failure (Windows System에서 Device Driver Failure로 인한 경제적인 피해 산출 모델 연구)

  • Kim, Sung-Min
    • Proceedings of the IEEK Conference
    • /
    • 2008.06a
    • /
    • pp.1163-1164
    • /
    • 2008
  • From the complexities and functional/operational expectations, the compositions of PC devices requires Device Drivers to deliver full performance of the Hardware. However, due to quick transition of hardwares and expectations of better performance of the system. As a rest users are exposed of unexpected failures of device drivers which will cause malfunction of the system which consequently cause damages in quantity as well as quality wise. In this paper, the method of calculation and/or forecast to unexpected failure will be suggested. It may not be the answer but can be a guide to calculation to economic damage due to device driver failure.

  • PDF

A Study on Applying the Ground Source Heat Pump System in Greenhouse and Livestock Facility (지열 시스템의 원예시설과 축사시설 적용에 관한 연구)

  • Jang, Jea-Chul;Kang, Eun-Chul;Song, Jun-Ik;Kim, Ji-Young;Lee, Euy-Joon
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.5 no.2
    • /
    • pp.1-6
    • /
    • 2009
  • In this paper, RETScreen program model has been investigated to predict the economic analysis for greenhouse and livestock facility. Load calculation result was 35.2[kW] of greenhouse and the calculation result of livestock facility was 35.5[kW]. Also, a case study of the RETScreen program indicated that the equity payback is 6.9 years for a greenhouse facility and the equity payback is 9.5 years for a livestock facility.

  • PDF

Performance Simulation of Part Load Operation for 2MWe Circulating Fluidized Bed Boiler (2MWe 순환유동상 보일러의 부분 부하 운전 성능 모사)

  • Kim, Taehyun;Choi, Sangmin;Hyun, Ju-soo
    • 한국연소학회:학술대회논문집
    • /
    • 2012.04a
    • /
    • pp.35-36
    • /
    • 2012
  • Part load operation usually covers large periods of the total operation time on the economic ground and electricity demand in small-scale boilers. Performance analysis of part load behavior is very important for the purpose of boiler operation optimization. A simple thermal calculation approach is applied to predict performance of a pilot-scale circulating fluidized bed (CFB) boiler at part load operation. Verification has been carried out by comparing between calculation results an operation data of the boiler.

  • PDF

An Analysis on Effectiveness of BIM-based Area Calculation Method for Improving Quality of Korean Apartment Housing (국내 공동주택의 품질향상을 위한 BIM기반 면적산정 방법의 실효성 연구)

  • Kim, Jun-Gyu;Ryu, Jung-Rim;Choo, Seung-Yeon
    • Journal of the Korean housing association
    • /
    • v.24 no.2
    • /
    • pp.45-52
    • /
    • 2013
  • The Purpose of this study is to improve construction quality with area calculation methods from BIM design technology. BIM has been supporting public-private-organizations and academic circles as a solution technology to manage and produce informations effectively from construction field including facility manage one. BIM standards are necessary but not sufficient for achieving perfect practical application in South Korea. In particular, development of architectural rule based area calculation methods is very urgent and important to improve construction quality. To solve those problems, methods and standards on area calculation are developed and its effectiveness of the proposed BIM-based methods is defined through the analysis between the existed area calculation method and process which are 2D based. This study will not only improve economic efficiency and accuracy of the construction quality but also settle the BIM environment in the domestic architecture.

A New Economic Dispatch Algorithm Considering Any Higher Order Generation Cost Functions (고차 발전 비용 함수를 고려한 새로운 경제급전 알고리즘)

  • 박정도;문영현
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.12
    • /
    • pp.603-610
    • /
    • 2002
  • In this paper, a new economic dispatch algorithm for unit commitment is proposed to improve both the accuracy of the final solution and the calculation speed of economic dispatch. By using the inverse incremental cost functions, economic dispatch can be transformed into a simple optimization problem associated with an n-th order polynomial equation. The proposed method remarkably reduces the computation time with adaptability to any higher order generation cost functions. The proposed method is tested with sample system, which shows that the proposed algorithm yields more accurate and economical generation scheduling results with high computation speed.

Economic Analysis of the Piezoelectric Power using the California Standard Test (캘리포니아 표준 테스트 방법을 사용한 압전 발판의 경제성 분석)

  • Jung, Soon-Sung
    • Journal of Power System Engineering
    • /
    • v.21 no.4
    • /
    • pp.51-56
    • /
    • 2017
  • The purpose of this study is to suggest economic analysis for piezoelectric power. Economic analysis method uses california standard test. Perspectives of california standard test is participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. This study identifies the cost and benefit components. This study identifies benefit-cost calculation procedures from four test : participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. In the economic analysis, the order of benefit cost ratio in piezoelectric power shows total resource cost test, program administrator cost test, ratepayer impact measure test and participant test.