• Title/Summary/Keyword: earthworks

Search Result 56, Processing Time 0.021 seconds

AR-based 3D Digital Map Visualization Support Technology for Field Application of Smart Construction Technology

  • Song, Jinwoo;Hong, Jungtaek;Kwon, Soonwook
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1255-1255
    • /
    • 2022
  • Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.

  • PDF

Utilization of LFWD for Compaction Management of Embankment in Expressway Construction (고속도로 건설 시 성토부 다짐관리를 위한 LFWD의 활용성)

  • Park, Yangheum;Jang, Ilyoung;Do, Jongnam
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.3
    • /
    • pp.45-51
    • /
    • 2021
  • The evaluation of the degree of compaction of the embankment area, which accounts for most of highway earthworks, is generally performed by a flat plate loading test. The plate loading test is a traditional test method and has high reliability in the field. However, as reaction force equipment must be carried out and it takes about 40 minutes per site during the test, there may be limitations in managing the entire expanse of earthworks. Meanwhile, in order to overcome this, the Ministry of Land, Infrastructure and Transport proposed a simple method of evaluating the level of compactness in the provisional guidelines for compaction management of the packaging infrastructure in 2010. However, it has not been utilized at the highway construction site until now, 10 years later. Therefore, this study attempted to verify the utility of the compaction evaluation method using LFWD (Light Falling Weight Deflectometer) of the impact loading method among the test methods suggested in the provisional guideline. To this end, the correlation was derived by conducting a plate loading test and an LFWD test for each site property and compaction degree. As a result of the test, there was no consistency of test data in the ground with a relative compaction of 80% or less. However, it was confirmed that the correlation has a tendency to increase beyond that. If the test method or test equipment is improved to ensure the consistency of the test values of the impact loading method in the future, it will play a big role in solving the blind spot for compaction management in the earthworks.

Behaviors of Settlement for Transitional zone with Moving Wheel Loading (이동하중을 고려한 토공-접속구간 침하거동)

  • Choi, Chan-Yong;Lee, Jin-Wook
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.238-242
    • /
    • 2008
  • Transitional zones, one of the typical weak area of earthworks, require lasting a maintenance work due to a differential stiffness of substructures. It is very difficult problem that transition zone was perfectively prevented against a differential settlement. The transitional zone will deteriorate at an accelerate rate. This may lead to pumping ballast, swinging or hanging sleepers, permanent rail deformations, worn track components, and loss of surface and gauge. In this study, it is performed that settlement behavior in transitional zone was compared with small model test.

  • PDF

Hydrologic Analysis for the Prevention of Flood Damage in Earthworks Site (토공현장의 수해방지를 위한 수문분석)

  • Han, seung-hee
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2019.05a
    • /
    • pp.169-170
    • /
    • 2019
  • 지구단위계획에 의한 택지개발 등의 현장에서 빈번하게 발생하는 토공은 우기 시에 많은 양의 토사침식이 우려된다. 따라서 현장에서 물관리는 매우 중요하며 이를 간과했을때는 대형 재해로 연결 될 수 있으므로 중요하다. 이들 지역은 대부분 소규모지역이므로 수문해석에 필요한 DSM을 드론사진측량으로 손 쉽게 구축할 수 있으며 이를 이용하여 유역면적의 파악, Flow direction, Flow accumulation을 분석한다면 준공까지 효율적으로 물관리가 가능하다.

  • PDF

3D-based Earthwork Planning and CO2 Emission Estimation for Automated Earthworks (자동화 토공을 위한 3D 토량배분과 탄소발생량 추정)

  • Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1191-1202
    • /
    • 2013
  • The former researches on earthwork automation were mainly focused on GPS and sensor application, environment modelling, equipment path planning, work information management, and remote control etc. Recently, reducing $CO_2$ emission becomes one of main focuses for an automation research. In the case of earthwork operations, many kinds of construction machines or robots are involved, which can cause high level of $CO_2$ in a construction site. An effective earthwork plan and construction machine operation can both increase productivity and safety and decrease $CO_2$ emission level. In this research, some automation concepts for green earthworks are suggested such as a 3D construction site model, a 3D earthwork distribution based on two different earthwork methods, and an earthwork package construction method. A excel-based simulator is developed to generate the 3D earthwork distribution and to estimate the level of $CO_2$ emission for the given earthwork.

UAV Utilization for Efficient Estimation of Earthwork Volume Based on DEM

  • Seong, Jonghyeun;Cho, Sun Il;Xu, Chunxu;Yun, Hee Cheon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.5
    • /
    • pp.279-288
    • /
    • 2021
  • In the era of the 4th industrial revolution, smart construction, in which new technologies such as UAV (Unmanned Aerial Vehicle) are fused, is attracting attention in the construction field. However, the method of estimating earthwork volume using DEM generated by UAV survey according to practical regulations such as construction design guidelines or standard product counting is not officially recognized and needs to be improved. In this study, different types of UAV were measured and DEM was obtained using this data. The DEM (Digital Elevation Model) thus obtained was analyzed for changes in the amount of earthworks according to the size of the GSD (Ground Sample Distance). In addition, the amount of earthwork by DEM and the amount of earthwork by existing design drawings were compared and analyzed. As a result of the study, it was suggested that images with a GSD of 5cm or less are effective to generate a high-quality DEM. Next, as a result of comparing the earthwork volume calculation method using DEM and the earthwork volume based on the existing 2D design drawings, a difference of about 1% was shown. In addition, when the design earthwork amount calculated by the double-section averaging method was compared with the designed earthwork amount using DEM data by UAV survey, a difference of about 1% was found. Therefore, it is suggested that the method of calculating the amount of earthworks using UAV is an efficient method that can replace the existing method.

Evaluation on Probability and Intensity of Hazards Exposure by Construction Occupations (건설업 직종별 노출 가능 유해인자 및 노출강도에 관한 평가)

  • Hyunhee Park;Sedong Kim
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.33 no.3
    • /
    • pp.317-331
    • /
    • 2023
  • Objectives: Construction workers are exposed to various hazardous substances simultaneously. However, little is known about the exposure hazards in construction industry. This study was aimed at identifying the risk of exposure hazards among construction workers. Methods: The expert survey (n=29) was conducted, including construction industry health managers (n=11) and work environment monitoring experts (n=18), on exposure probability, intensity and risk of hazardous substances by construction occupations Results: The exposure hazards of 30 construction occupations were identified and summarized through a literature review and expert survey. The most prevalent hazards were in order of noise, awkward posture, heat/cold, crystalline silica, cement/concrete dust, metal fumes, and volatile organic compounds. The hazards with highest risk score(over seven points) at construction occupations were noise(formwork carpenter, concrete finisher, rebar worker, demolition worker, driller/rock blaster), hazardous rays(welder), heat/cold (earthworks, formwork carpenter, rebar worker, concrete placer, scaffolder), awkward posture(bricklayer, caulker/tile setter, rebar worker) and heavy lifting(bricklayer, rebar worker). Among construction workers, the job types with the highest risk of exposure to carcinogens, and in which occupational cancer has been reported, were in order of stonemason, concrete finisher, rock blaster, welder, insulation installer, painter, scaffolder, plant worker and earthworks in order Conclusions: Systematic research and discussion on occupational disease among construction workers and its various hazardous factors are needed to establish job exposure matrix for facilitating standard for promptly processing the workers' compensation.

Process Interference Management for Finish Works using Mobile Technology (모바일 기술을 이용한 마감공사의 작업간섭 관리)

  • Ko, Yong-Ho;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.35-36
    • /
    • 2017
  • The finish works of construction projects comprises approximately 40% of the total construction duration. Thus, the management of finish works have as big as impacts on total project duration as the earthworks, foundation and structure works. Process interference management is considered one of the most important issues dealt during finish works. However, it was investigated that effective management systems have yet not been applied for practical use. Accordingly, this paper suggests a mobile technology based finish works management system that mainly focuses on preventing process interference occurred due to ineffective communication between general and sub-contractors.

  • PDF

Volumes of Solids in Joseon Mathematics (조선(朝鮮) 산학(算學)과 체적(體積))

  • Hong, Sung Sa;Hong, Young Hee;Kim, Chang Il
    • Journal for History of Mathematics
    • /
    • v.27 no.2
    • /
    • pp.101-110
    • /
    • 2014
  • Joseon is mainly an agricultural country and its main source of national revenue is the farmland tax. Since the beginning of the Joseon dynasty, the assessment and taxation of agricultural land became one of the most important subjects in the national administration. Consequently, the measurement of fields, or the area of various plane figures and curved surfaces is a very much important topic for mathematical officials. Consequently Joseon mathematicians were concerned about the volumes of solids more for those of granaries than those of earthworks. The area and volume together with surveying have been main geometrical subjects in Joseon mathematics as well. In this paper we discuss the history of volumes of solids in Joseon mathematics and the influences of Chinese mathematics on the subject.

Decision Making Model for Optimal Earthwork Allocation Planning (최적 토량배분 계획을 위한 의사결정 모델)

  • Gwak, Han-Seong;Seo, Byoung-Wook;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.162-163
    • /
    • 2016
  • This paper presents a mathematical model for optimizing earthwork allocation plan that minimizes earthwork cost. The model takes into account operational constraints in the real-world earthwork such as material-type (i.e., quality level of material) and quantities excavated from cut-sections, required quality of material and quantities for each embankment layer, top-down cutting and bottom-up filling constraints, and allocation orders. These constraints are successfully handled by assuming the rock-earth material as the three dimensional (3D) blocks. The study is of value to project scheduler because the model identifies the optimal earth allocation plan (i.e., haul direction (cut and fill pairs), quantities of soil, type of material, and order of allocations) expeditiously and is developed as an automated system for usability. It is also relevant to estimator in that it computes more realistic earthworks costs estimation. The economic impact and validity of the mathematical model was confirmed by performing test cases.

  • PDF