1 |
Cass, D., and Mukherjee, A. (2011). "Calculation of greenhouse gas emissions for highway construction operations using a hybrid life cycle assessment approach: A Case Study for Pavement Operations." Journal of Construction Engineering and Management, ASCE, Vol. 137, No. 11, pp. 1015-1025.
DOI
ScienceOn
|
2 |
Ji, Y., Borrmann, A., Rank, E., Seipp, F., and Ruzika, S. (2010). "Mathematical modeling of earthwork optimization problems." Proceedings of the International Conference in Computing in Civil and Building Engineering, Nottingham, UK, Nottingham University Press, Paper 202, pp. 403-409.
|
3 |
Kang, T. W., Cho, Y. H. (2011). "The study on the optimized earthwork transfer path algorithm considering the precluded area of massive cutting and banking." International Journal of Highway Engineering, Vol. 13, No. 4, pp. 1-8 (in Korean).
과학기술학회마을
|
4 |
Kim, B. S. (2011). "Correlation analysis on the duration and emission following the earth-work equipment combination". Journal of the Korean Society of Civil Engineers, KSCE, Vol. 31, No. 4D, pp. 603-611 (in Korean).
|
5 |
Kim, C. H., Shin, M. H., Kang, L. S. (2010). "Integrated information system for environmental and economic evaluation." Journal of the Korean Society of Civil Engineers, KSCE, Vol. 30, No. 6D, pp. 615-622 (in Korean).
|
6 |
Kim, S. K, Lee, D. G., Kim, H. C. (2005). "A model for allocating automated earthwork equipment using contract net." Journal of the Korean Society of Civil Engineers, KSCE, Vol. 25, No. 5D, pp. 721-727 (in Korean).
|
7 |
Kim, S. K., Min, S, G. (2012a). "Development of a work information model and a work path simulator for an intelligent excavation." Journal of the Korean Society of Civil Engineers, KSCE, Vol. 32, No. 3D, pp. 259-267 (in Korean).
DOI
ScienceOn
|
8 |
Kim, S. K., Min, S, G. (2012b). "evelopment of core technologies for a low-carbon automated earthwork." Proceedings of the 13th KICEM Annual Conference, KICEM, Vol. 12, pp. 507-508. (in Korean)
|
9 |
Kim, S. K., Russell, J. S. (2003a). "Framework for an intelligent earthwork system. Part II. Task identification/scheduling and resource allocation methodology." Automation in Construction, Vol. 12, No. 1, pp. 15-27.
DOI
ScienceOn
|
10 |
Kim, S. K., Russell, J. S., Koo, K. J. (2003b). "Construction robot path planning for earthwork operations." Journal of Computing in Civil Engineering, ASCE, Vol. 17, No. 2, pp. 97-104.
DOI
ScienceOn
|
11 |
Kim, S. K., Seo, J. W., Russell, J. S. (2012). "Intelligent navigation strategies for an automated earthwork system." Automation in Construction, Vol. 21, No. 1, pp. 132-147.
DOI
ScienceOn
|
12 |
Lee, C. K., Kim, S. K., Sung, Y. J. (2003). "A study on 2D-based earthwork planning methods." Journal of the Korean Society of Civil Engineers, KSCE, Vol. 23, No. 3D, pp. 349-358 (in Korean).
과학기술학회마을
|
13 |
Lee, J. N., Pyeon, M. W., Koo, J. H., Park, J. S. (2010). "Earthwork plan using the precise 3D topographic data." Journal of the Korean Society for Geospatial Information System, Vol. 18, No. 1, pp. 63-72 (in Korean).
과학기술학회마을
|
14 |
Moon, J. S. (2009). LCA analysis and case study of environment factors for highway construct project, MSc thesis, GyeongSang National University (in Korean).
|