Benefit-Cost Analysis for Developing Jeongja Port in Ulsan (울산지역 어항개발의 경제성 평가 - 정자항을중심으로 -)

  • Kim, Tae-Yong
    • The Journal of Fisheries Business Administration
    • /
    • v.39 no.1
    • /
    • pp.63-85
    • /
    • 2008
  • The objective of this study is to review the methodology of economic analysis of fishing ports by examining the economical feasibilities of a national fishing port (Jeongja Port) in Ulsan. This study utilized market value evaluation method to measure the benefits and costs related to the development of ports. The benefit variables are income effects resulting from the developments while the cost variables are sum of construction costs and maintenance costs. The income effects are measured in two ways: (1) income from individual project resulting from the developments, (2) the income effects by utilizing investment multipliers. The results shows that the BC ratio (Benefits/Costs) of Jeongja port by using (1) income from individual project resulting from the developments was 1.07 while the BC ratio by using (2) the income effects by utilizing investment multipliers was 1.10 due to a relative short period of useful life for investment multipliers. However, the income variable utilizing investment multipliers is more sensitive to the period of duration than the income variable from individual project.

  • PDF

Time-Profit Trade-Off of Construction Projects Under Extreme Weather Conditions

  • Senouci, Ahmed;Mubarak, Saleh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.33-40
    • /
    • 2014
  • Maximizing the profitability and minimizing the duration of construction projects in extreme weather regions is a challenging objective that is essential for project success. An optimization model is presented herein for the time-profit trade-off analysis of construction projects under extreme weather conditions. The model generates optimal/near optimal schedules that maximize profit and minimize the duration of construction projects in extreme weather regions. The computations in the model are organized into: (1) a scheduling module that develops practical schedules for construction projects, (2) a profit module that computes project costs (direct, indirect, and total) and project profit, and (3) a multi-objective module that determines optimal/near optimal trade-offs between project duration and profit. One example is used to show the impact of extreme weather on construction time and profit. Another example is used to show the model's ability to generate optimal trade-offs between the time and profit of construction projects under extreme weather conditions.

Capital Structure Adjustment in Korean Retail Firms

  • Kim, Sang-Su;Lee, Jeong-Hwan
    • Journal of Distribution Science
    • /
    • v.15 no.11
    • /
    • pp.41-48
    • /
    • 2017
  • Purpose - Capital structure adjustment costs influence the test of the standard trade-off theory of capital structure. We investigate whether there exist economically significant capital adjustment costs in the Korean retail industry. Research design, data, and methodology - This paper adopts the model of Leary and Roberts(2005) to obtain the hazard rate of capital structure variations. The retail firms traded in the KOSPI and KOSDAQ markets are analyzed from 2000 to 2016. Results - The empirical analysis shows infrequent capital structure adjustments in the Korean retail firms. The duration analysis emphasizes that the fixed adjustment cost plays an important role in the determination of capital structure adjustments for the Korean retail firms. Yet, even after taking account of infrequent capital structure adjustments, the trade off theory only weakly explains the capital structure variations of the Korean retail firms. Conclusions - This paper confirms the existence of capital structure adjustment costs for the Korean retail firms. Our results argue for the significance of fixed adjustment costs in capital structure adjustments. Such emphasis on the fixed cost is inconsistent with the existing studies. The trade off theory does not successfully explain capital structure policy in the Korean retail firms even after considering adjustment costs.

Comparison the Diagnostic Value of Dilatation and Curettage Versus Endometrial Biopsy by Pipelle - a Clinical Trial

  • Sanam, Moradan;Majid, Mir Mohammad Khani
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.16 no.12
    • /
    • pp.4971-4975
    • /
    • 2015
  • Background: Several methods have been presented for the evaluation of the endometrium in patients with abnormal uterine bleeding, which include minimal invasive and invasive approaches such as diagnostic curettage or endometrial biopsy by Pipelle. Many studies have been performed in order to compare two methods; diagnostic curettage and outpatient endometrial biopsy. This investigation compared sampling adequacy, endometrial histopathology, failure rates, duration and costs between diagnostic curettage in a hospital and endometrial biopsy. Materials and Methods: This single blind clinical trial was performed on 130 patients older than 35 years who was referred to Amir training hospital in 2013 for elective diagnostic curettage because of abnormal uterine bleeding. For all patients eligible for the study, an endometrial sample by Pipelle was taken without anesthesia or dilatation. Then under general anesthesia diagnostic curettage was performed by sharp curette. Sampling duration was calculated and both samples were sent to the same pathologist. The diagnostic values of two methods in the diagnosis of normal endometrium, endometrial hyperplasia and carcinoma were compared. The costs of these two methods were also compared. Data analysis was performed by SPSS (version 16.0) software. Chi-Square, Fisher, and Pearson tests were used and were considered statistically significant at P values less than 0.05. Results: Two methods were agreed upon 88% of sampling adequacy and 94% of pathological results. Specificity of 100% and sensitivity of 90% for detection of proliferative endometrium, secretory endometrium, simple hyperplasia without atypia and 100% for cancer were recorded. Pipelle diagnostic accuracy in comparison with curettage, have been reported over 97%, so the failure rate in this study was below 5%. Sensitivity of Pipelle for detection of atrophic endometrium was reported below 50%. Duration and cost was lower in Pipelle versus curettage. Conclusions: It is concluded that due to high agreement and cohesion coefficient between curettage and Pipelle on the issue of sampling adequacy, histopathology finding (except atrophic endometrium), low failure rate, duration of sampling and cost, Pipelle can be introduced as a suitable alternative of diagnostic curettage.

Economical Analysis of Cervical Disc Disease by Anterior Inter-body Fusion Methods - Comparing of Bone Graft vs Plating - (경추간판 탈출 환자의 전방 고정술에 따른 경제적 분석 - 골 이식법과 금속판 고정 병행술의 비교 -)

  • Gill, Seung-Bae;Lee, Sang-Youl;Heo, Seung-Ho;Jang, Yeun-Gyu
    • Journal of Korean Neurosurgical Society
    • /
    • v.30 no.2
    • /
    • pp.201-206
    • /
    • 2001
  • Objective : The purpose of this study was to assess the complications, duration of admission, cost effectiveness, radiologic stabilization of the anterior cervical bone fusion in the treatment of cervical disc disease with and without plating. Materials and Methods : Fifty-two surgically treated patients for cervical disc disease were reviewed. Group I consisted of consecutive treated patients with iliac auto-bone graft without instrumentation after anterior cervical discectomy. Group II consisted of consecutive treated patients with iliac autologous-bone graft with CASPER cervical plate fixations. Radiologic fusion was decided when loss of end plate boundary between graft bone and vertebral body and immobile, maintenance of the disc space were evident on simple dynamic plain films. The patients were discharged after the stabilization of cervical motion by films was of tained. These groups were analysed multiple variably with Mann-Whitney U-test. Results : Group I consisted of 18 patients, group II consisted of 34 patients. Mean age was $49.0{\pm}8.1years$, mean duration of admission was $17.27{\pm}10.51days$, mean costs for treatment was $1,970,000{\pm}475,000won$. In group I, mean age was 47.7(34-60) years, 16 patients had undergo on one-level operation, 2-patients had undergo on two-level operation, mean duration of admission was $28.7{\pm}10.4days$, mean costs for treatment was $2,194,473{\pm}561,639won$. The periods of stabilization was $6.6{\pm}3.36weeks$ on radiologic study. Mean periods of out patient follow up was 16.8(6-64) weeks after discharge. Mean period of radiologic follow up was 17.3(4-6) weeks after surgical operation. In group II, mean age was 49.7(37-62) years and 18 patients one-level operation, 14- patients had undergo on two-level operation and 2-patients three-level operation. Mean duration of admission was $11.24{\pm}3.29days$, mean costs for treatment was $1,850,823{\pm}389,372won$. The periods of stabilization was $5.88{\pm}7.07weeks$ on radiologic study. Mean period of out patients follow up was 16.7(4-60) weeks after discharge. Mean period of radiologic follow up was 12.4(3-52) weeks after surgical operation. The duration of admission showed statistical significance in Group II but other items showed no significant difference between two groups. Conclusions : The more economic, early life return and effective method of cervical disc disease in our series were evident in patients who had undergone, iliac bone graft and plate fixations after anterior discectomy.

  • PDF

RISK ANALYSIS FOR INDUSTRIAL PROJECT IN CONSTRUCTION PHASE: A MONTE-CARLO SIMULATION APPROACH

  • Soo-Yong Kim;Luu Truong Van;Han-Ki Ha;Nguyen Quoc Tuan
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.130-139
    • /
    • 2007
  • This paper presents a study on risk analysis in terms of contractor's costs in construction phase in which Crystal ball (software of Decisioneering, UK) has been utilized as a main tool. To realize it, a questionnaire survey has been carried out to identify the dominant factors that strongly influence contractor costs in Vietnam. Based on results of questionnaire investigation, the survey identified three factors which were duration of each construction task, costs of reinforcing steel, and cement. Then a spreadsheet model was created in order to analyze risks. The study also indicates that the cost of reinforcing steel and cement are the cause of risks for contractors. According to the suggested model, contractors may foresee the probability of completion within the approved budget, and the possibility of earning in accordance with owner's payment conditions.

  • PDF

Assessment of Interruption Costs for Residential Customers (주택용 수용가 정전비용 평가)

  • Choi, Sang-Bong;Nam, Ki-Young;Kim, Dae-Kyeong;Jeong, Seong-Hwan;Rhoo, Hee-Seok;Lee, Jae-Duk
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.196-198
    • /
    • 2003
  • The impacts of electric service interruption to customers depend on customer and interruption characteristics. Customer characteristics include demographic aspects(residential type, and number of household members) and power supply types whereas interruption characteristics include frequency, duration, time, and day of interruption. Accordingly evaluation of these customer interruption costs is very complicated and subjective. For residential customers, customer survey method seems most appropriate because interruption impact to residential customers is intangible. In other words, the value of housework or lost leisure due to interruption is individual. Accordingly, this paper selected the customer survey method to assess the interruption costs for residential customers.

  • PDF

DATA QUALITY AND COSTS IN MEASURING TIME-RELATED UNDEREMPLOYMENT IN KOREA

  • Kim Sulhee
    • Proceedings of the Korean Statistical Society Conference
    • /
    • 2000.11a
    • /
    • pp.97-104
    • /
    • 2000
  • Time-related underemployment exists when a person's employment is insufficient in terms of the volume of work. Two alternative definitions can be considered based on a longer-term view or a shorter-term view and these were designed into a single questionnaire. We conducted a pilot sample survey with about 6,000 respondents in Korea. The estimates of underemployment using the two definitions show some differences given the ages, genders, industrial areas and main activities of the respondents. A larger number of people could be identified as underemployed when the longer-term view is used than when the shorter-term view is used, but there is a greater cost associated with the former. The cost-benefit of the interviewers' time was investigated by multiple visits to households. Biases and costs are also analyzed using the results of the comparison of the decrease in non-responses with the increase in the costs for the interviews.

  • PDF

A Study on Estimation Model of Construction Duration for Public Construction (공공건설공사 공사기간 산정모델에 관한 연구)

  • Kim, Byeong-Soo;Chun, Jin-Ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.142-151
    • /
    • 2005
  • On public constructions, that the first planed projects delay than the scheduled completion day occurrence frequently because gap between the scheduled construction durations and the actual construction durations. These facts connect with not only problems of the construction during as the construction delay but also brought about the distribution costs increase as the failure of facility use plan and the people discomfort weight, failure of the production and the supply using facility then tremendous loss of each part etc. For reduce these loss, it must improve accuracy of the scheduled construction duration estimating when it order. This study try contribute to a successful manage of public project and reduce the construction duration extension frequent of the construction during, and then ensure the suitable construction duration by present the estimation model of the scheduled construction duration that include the construction duration correct element using as an index on the scheduled construction duration estimation.

A Study on the Selection of a Bridge Structure Type Using DEA and LCC (DEA기법과 LCC개념을 활용한 교량형식 선정 방법에 관한 연구)

  • Han, Sam-Heui;Kim, Jong-Gil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.4
    • /
    • pp.101-111
    • /
    • 2013
  • In this study, DEA (Data Envelopment Analysis) was carried out on the four bridges, which have the same extension (L=1,615m), in order to select the most superior, economical method of construction using the LCC concept of each bridge structure in the case of the Ulsan-Pohang double track railway which is scheduled to be constructed. DEA models were analyzed with the CCR model, which was designed for the evaluation of relative efficiency of each model. The initial construction costs, maintenance costs, indirect costs (user costs + indirect loss of social costs), and life cycle costs were used as input variables, and average duration was applied as the output variable. LCC was applied to calculate the input variables, and to get the costs of LCC, 100 years of period and 4.83% of real discount rate were applied, and the costs are classified into initial construction, maintenance, user, and indirect loss of social cost. The analysis results showed that the Method 2 and 3 were evaluated as the most efficient, and the other alternatives were evaluated as the following order; Method 1, the default, and Method 4.