Journal of Korean Society of Industrial and Systems Engineering
/
v.23
no.59
/
pp.37-42
/
2000
The parallel machines scheduling problems is one of the combinatorial optimization problems that often occurs in the real world. This problem is classified into two cases, one of which is the case which processing time are identical and the other, nonidentical. Not so much researches have been made on the case that nonidentical parallel machines scheduling problem. This study proposes Tabu Search methods for solving parallel machines scheduling problems related to due dates: minimizing mean tardiness, minimizing the number of tardy jobs, minimizing the maximum tardiness.
Germination of sweet and super sweet corn is lower than normal corn due to the higher sugar and lower starch contents of kernels. Sweet corn seeds are easily deteriorated in the field under the unfavorable condition, therefore it is important to identify the optimal harvesting time for seed production. This trial was conducted to investigate the responses of germination percentage of shrunken-2(sh2), brittle(bt), sugary(su), and sugary enhancer(se) hybrids in relation to harvesting dates. Eight hybrids of four different gene sweet corns were harvested at 15, 20, 25, 30, 35, 40, 45, and 50 days after silking(DAS). Germination test was performed using paper towel method. Mean germination percentages across eight hybrids showed the highest value at 45 DAS. There were significant differences among genes and within gene for germination. Shrunken-2 hybrid Mecca was higher than su hybrids for germination, indicating that sh2 would not be poorer than su Late harvesting beyond the optimal harvesting date might not be desirable because of more lodging and ear rots. Theoretical optimal harvesting date estimated from the regression equation was 40.9 DAS, however, practical date for harvesting would be a few days later than the estimated date if seedling vigor might be considered. Kernel dry weight per ear showed similar response to germination. Regression equation showed the highest kernel dry weight at 40.7 DAS. Significant correlations between kernel dry weight and germination were observed, impling that kernel dry matter accumulation would be an important factor for germination.
Journal of The Korean Society of Grassland and Forage Science
/
v.11
no.2
/
pp.129-136
/
1991
Dry matter productivity at silage stage of two corn hybrids varying resistance to rice blackstreaked dwarf virus(RBSDV) and two sorghum hybrids varying growth duration was evaluated at six planting dates (Apr. 1, Apr. 15, Apr. 29, May 13, May 27, and June 10) in Kyongsan where RBSDV is prevalent.Corn was harvested 38-40 days after silking. For sorghum 1st-cut was made 19-22 days after heading and some regrowth (2nd-cut) on October 13. 1. Percent stand of both corn hybrids was over 91% at all planting dates, but that of sorghum ranged 37.2-80.3% depending on hybrids and planting dates. 2. The number of days from planting to emergence decreased as planting date delayed in both crops. The number of days from emergence to silking of both corn hybrids and a sorghum hybrid(P 956) decreased as planting date delayed, but that of the other sorghum hybrid(P 931) increased significantly after May 13 planting. 3. RBSDV infection rate of corn hybrids was highest at April 1 planting (Kwanganok 24.896, Jinjuok 63.0%) and decreased up to April 29 planting and then increased as planting date delayed. Sorghum was not infected by RBSDV at all. 4. EarfTotal dry matter ratio of corn ranged 30.6-47.9% and that of sorghum 3.1-30.7% depending on hybrids and planting dates. All the hybrids developed grain normally at all planting dates except a sorghum hybrid (P 931) which developed few grains after May 13 planting. 5. Crude (C) protein and C. fat contents were similar among all treatments. C. fiber content of P 931 was higher than that of both corn hybrids and P 956, but nitrogen free extract (NFE) was lower. C. fiber and NFE of both corn hybrids and 1st-cut sorghum were similar among the planting dates, but C. fiber and NFE of 2nd-cut of sorghum decreased and C. protein increased as planting date delayed due to plants were younger. 6. Dry matter (DM) yield of all hybrids decreased as planting date delayed except Jinjuok of which yield was highest at April 29 planting. DM yield of corn was similar to 1st-cut sorghum, but lower than total DM yield of sorghum at April 1 and 15 plantings where regrowth yield was high.
Kim, Hong-Joe;Oh, Ji-Yeon;Kim, Dong-Kwan;Yun, Hong-Tai;Jung, Woo-Suk;Hong, Jeum-Kyu;Kim, Ki-Deok
Research in Plant Disease
/
v.16
no.2
/
pp.176-182
/
2010
Occurrence of plant diseases is dependent on various factors in the agricultural system. Due to recent extensive environmental climate changes, i.e. global warming, agricultural systems such as planting dates and cultivars are being affected. Gradual transition in disease occurrence and incidence in the agricultural fields can also be affected by direct and/or indirect environmental changes. In this study, we evaluated disease occurrence and incidence in soybean plants to investigate whether it could be related with cultivars, planting dates and geographical differences in Korea in 2008. Soybean cultivars including 'Taekwang', 'Pungsan', 'Cheongja 3', 'Saeol', and 'Dawon' were planted in four different dates, May 15, June 1, June 15, and June 30, in two locations, Suwon, and Naju. Soybean diseases such as wild fire and bacterial pustule were mainly found depending on cultivars, planting dates, and areas. Wild fire occurred severely on cv. 'Taekwang' while bacterial blight did on cv. 'Dawon' among tested cultivars. Disease developments of wild fire and bacterial blight generally decreased in delayed planting regardless of cultivars.
The need to synchronize flowering in two lines of different maturities is frequently encountered in hybrid com (Zea mays L.) seed production. To establish the methods for synchrony of flowering in parent lines of different maturities be effects of clipping at 4 and 6-leaf stages of growth and two levels, clear polyethylene mulching and five different planting dates on flowering date growth and seed yield of two dent com inbred lines of different maturities were evaluated Clipping just above the shoot-apex delayed pollen sheeding 6 to 9days and silking 5 to 13 days but reduced stand and seed yield 30 to 70% and 67 to 81%. respectively. Clipping 5cm above the shoot apex delayed flowering 1 to 4 days without stand reduction but reduced yield 3 to 29%. Laterclipping was slightly more effective for delaying flowering than earlier clipping but reduced stand more severely when clipped just above the shoot apex. Under clear polyethylene film mulching, flowering of two lines was 13 to 15 days earlier and seed yield of B68 (late line) was significantly increased. As planting was delayed from April 18 to June 13, the number of days from planting to flowering of two lines decreased due to increase in air temperature. However, growing degree days (GDD) from planting to flowering of each lines was similar regardless planting dates indicating that GDD can be satisfactoryly used for choosing the planting dates of parent lines of different maturities. Seed yields of two lines were decreased with delaying planting dates.
Journal of Korean Institute of Industrial Engineers
/
v.28
no.4
/
pp.415-424
/
2002
Semiconductor manufacturing has been emerged as a highly competitive but profitable business. Accordingly it becomes very important for semiconductor manufacturing companies to meet customer demands at the right time, in order to keep the leading edge in the world market. However, due-date oriented production is very difficult task because of the complex job flows with highly resource conflicts in fabrication shop called FAB. Due to its cyclic manufacturing feature of products, to be completed, a semiconductor product is processed repeatedly as many times as the number of the product manufacturing cycles in FAB, and FAB processes of individual manufacturing cycles are composed with similar but not identical unit processes. In this paper, we propose a production scheduling and control scheme that is designed specifically for semiconductor scheduling environment (FAB). The proposed scheme consists of three modules: simulation module, cycle due-date estimation module, and dispatching module. The fundamental idea of the scheduler is to introduce the due-date for each cycle of job, with which the complex job flows in FAB can be controlled through a simple scheduling rule such as the minimum slack rule, such that the customer due-dates are maximally satisfied. Through detailed simulation, the performance of a cycle due-date based scheduler has been verified.
Journal of the Korea Academia-Industrial cooperation Society
/
v.13
no.4
/
pp.1648-1653
/
2012
In general, fault of a virtually finished product that is value-added one, since it has gone throughout the most of processes, may give rise to quality cost nearly amount to its selling price and can be a main cause that decreases the efficiency of manufacturing process. This paper proposes a dispatching algorithm for manufacturing process with quality volatilities with consideration of due-dates and required quality level. In order to evaluate the proposed algorithm, this paper examines the performance of the proposed method by comparing it with that of the existing dispatching algorithms in terms of minimizing the mean tardiness. In addition, from the perspective of process capability based on required quality level, this study shows the superiority of the proposed dispatching algorithm.
Journal of Korean Institute of Industrial Engineers
/
v.21
no.3
/
pp.357-369
/
1995
Wafer fabrication process is the most important and critical process in semiconductor manufacturing. The process is very complicated and hard to establish an efficient schedule due to its complexity. Furthermore, several performance indices such as due dates, throughput, cycle time and workstation utilizations are to be considered simultaneously for an efficient schedule, and some of these indices have negative correlations in performances each other. We develop an efficient heuristic scheduling algorithm; Hybrid Input Control Policy and Hybrid Dispatching Rule. Through numerical experiments, it is shown that the proposed Hybrid Scheduling Algorithm gives better performance compared with existing algorithms.
Journal of Korean Institute of Industrial Engineers
/
v.24
no.1
/
pp.37-50
/
1998
This paper considers the nonidentical parallel machine scheduling problem in which n jobs having different due dates are to be scheduled on m nonidentical parallel machines. For the make-to-order manufacturing environment, the objective is to minimize the number of tardy jobs. A 0-1 nonlinear programming model is formulated and a heuristic algorithm that allocates and sequences jobs to machines is developed. The proposed algorithm makes use of the concept of assignment problem based on the suitability measure as the cost coefficient. Computational experiments show that the proposed algorithm is superior to the existing one in some performance measures such as number of tardy jobs. In addition, this algorithm is appropriate for solving real industrial problems efficiently.
in the real world situations that some jobs need be processed only on certain limited machines frequently occur due to the capacity restrictions of machines such as tools fixtures or material handling equipment. In this paper we consider n-job non-preemptive and m parallel machines scheduling problem having two machines group. The objective function is to minimize the sum of earliness and tardiness with different release times and due dates. The problem is formulated as a mixed integer programming problem. The problem is proved to be Np-complete. Thus a heuristic is developed to solve this problem. To illustrate its suitability and efficiency a proposed heuristic is compared with a genetic algorithm and tabu search for a large number of randomly generated test problems in ship engine assembly shop. Through the experimental results it is showed that the proposed algorithm yields good solutions efficiently.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.