• 제목/요약/키워드: downtime

검색결과 133건 처리시간 0.021초

CBM기반의 고장 예측 신뢰성 모델 (Failure Prediction Reliability Model based on the Condition-based Maintenance)

  • 김연수;정영배
    • 산업경영시스템학회지
    • /
    • 제22권52호
    • /
    • pp.171-180
    • /
    • 1999
  • Industrial equipment reliability improvement and maintenance is gaining attention as the next great opportunity for manufacturing productivity improvement. Reactive maintenance is expensive because of extensive unplanned downtime and damage to machinery. To avoid such an unplanned machine downtime, it is needed to use proactive maintenance approach by either using historical maintenance data or by sensing machine conditions. This paper discusses failure diagonosis and prediction based on the condition-based maintenance and reliability technique. Thus, by enabling such a framework, it can bring us more efficient planning and execution of maintenance to reduce costs and/or increase profits.

  • PDF

비재생혼합보증이 종료된 이후의 비용과 비가동시간에 근거한 교체정책에 대한 베이지안 접근 (A Bayesian approach to replacement policy following the expiration of non-renewing combination warranty based on cost and downtime)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제21권5호
    • /
    • pp.873-882
    • /
    • 2010
  • 본 논문에서는 비재생혼합보증이 종료된 이후의 교체정책에 대한 베이지안 접근을 고려한다. 이때, 비재생혼합보증은 비재생무료교체보증과 비재생비례교체보증의 혼합된 형태가 된다. 최적의 교체주기를 결정하기 위하여 기대비용과 기대비가동시간에 근거한 기준이 사용되는데, 이를 위해서 단위시간당 기대비용과 단위시간당 기대비가동시간이 각각 구해진다. 시스템의 고장시간이 불확실한 모수를 갖는 와이블분포를 할 때, 베이지안 접근에 근거하여 최적의 교체정책이 제안된다. 이때, 최적의 교체주기를 결정하기 위해서 Jiang과 Ji (2002)에 의해서 제안된 총밸류함수가 사용된다. 끝으로, 본 논문에서 제안된 베이지안 교체정책을 설명하기 위해서 수치적 예를 살펴본다.

혼합보증이 종료된 이후의 비용과 비가동시간에 근거한 보전정책 (Maintenance Policy Based on Cost and Downtime Following the Expiration of Combination Warranty)

  • 정기문
    • Communications for Statistical Applications and Methods
    • /
    • 제15권6호
    • /
    • pp.909-923
    • /
    • 2008
  • 본 논문에서는 수리가 가능한 시스템에 대하여 혼합보증이 종료된 이후의 교체모형과 예방보전모형을 고려하는데, 만약 보증기간이 종료된 이후에 시스템에 고장이 발생하면 최소수리를 수행한다. 최적의 교체정책과 최적의 예방보전정책을 결정하기 위한 기준으로는 기대비용과 기대비가동시간에 근거한 총밸류함수를 사용한다. 그리고 시스템의 고장시간이 와이블분포를 할 때 수치적 예를 통해서 제안된 최적의 교체정책 및 예방보전정책을 자세히 설명하고자 한다.

효율적 설비관리를 위한 지능형 생산정보시스템 구축 (Construction of Intelligent Production Information System for Efficient Plant Engineering)

  • 심황용;이동형
    • 산업경영시스템학회지
    • /
    • 제37권3호
    • /
    • pp.16-23
    • /
    • 2014
  • Most of metal cutting and processing companies are going through the difficulties such as frequent downtime and high failure rates by missing times to replace parts of CNC equipment. The reason is that the correct operation times of expensive CNC equipment can't be calculated. In this paper, to solve this problem, we try to construct the intelligent production information system for a case company and analyze its expected effects. The effects are as follows. First, it saves money about 3 million won each year during the useful life of three years by reducing downtime and failure rates, and increasing production rates etc. Second, it makes easily find and fix the cause of faulty through traceability of the production process, and enables to perform a systematic facility management through the calculation of reliable equipment's overall efficiency. This case can be easily applied in similar industries, and will contribute greatly to enhancing the competitiveness of related industries.

전류신호를 이용한 유도전동기의 회전자봉 결함검출에 관한 연구 (A Study on Detection of Broken Rotor Bars in Induction Motors Using Current Signature Analysis)

  • 신대철;정병훈
    • 한국소음진동공학회논문집
    • /
    • 제12권4호
    • /
    • pp.287-293
    • /
    • 2002
  • The unexpected failure of the induction motor makes the downtime of production, and the cost of the process cessation enormous. To reduce the downtime and increase the reliability of the motor, the vibration measurements for the fault detection have been used previously. Recently motor current signature analysis(MCSA) has been adapted for the fault detection and diagnosis of the motors. MCSA provides a powerful analysis tool for detecting the presence of mechanical and electrical faults in both the motor and driven equipment. In this paper, the fault severity of the rotor bar has been derived in terms of the resistance change which is calculated from the equivalent circuit model. Results show that the fault of the rotor can be easily detected and the measured value of the resistance change is verified by the detected fault from on-site tests using MCSA for the induction motors in an iron foundry.

Optimal Maintenance Policy for Fishing Vessel Equipment Using Delay Time Analysis

  • Jung, Gi-Mun;Kwon, Young-Sub;Anand Pillay;Jin Wang
    • 한국신뢰성학회:학술대회논문집
    • /
    • 한국신뢰성학회 2000년도 추계학술대회
    • /
    • pp.329-333
    • /
    • 2000
  • Delay time analysis is a pragmatic mathematical concept readily embraced by engineers which has been developed as a means to model maintenance decision problem. This paper considers an inspection period using delay time analysis for fishing vessel equipment. We assume that delay time distribution is Weibull and inspections are perfect. In this paper, we determine the optimal inspection period which minimize the expected downtime per unit time.

  • PDF

정기검사정책과 개선에 관한 연구 (A Study on the Periodic Inspection Policy and Its Improvement)

  • 임평순;서용성;박영택
    • 품질경영학회지
    • /
    • 제22권4호
    • /
    • pp.40-58
    • /
    • 1994
  • Some systems such as early warning system should be inspected occasionally in order to detect failures. If the system is inspected too frequently, inspection cost increases. On the other hand, if the number of inspections is reduced too much, the undetected system downtime cost increases. Thus, it is of interest to find effective inspection schedule, which minimizes the sum of inspection and downtime costs. When the system has increasing failure rate, inspection intervals get shorter as time goes on. But a common practice is to inspect the system at predetermined periodic intervals. In this paper, periodic inspection policy and a modified periodic inspection policy are considered. The modified policy is easily applicable and cost-effective. Some numerical examples are included in order to explain the modified inspection ploicy and its cost performance.

  • PDF

Lab-Scale Biosparging Study to Remediate Diesel-Contaminated Soil and Groundwater : the effect of air injection rate and pattern

  • 조수형;이시진;권순열;장순웅
    • 한국지하수토양환경학회:학술대회논문집
    • /
    • 한국지하수토양환경학회 2003년도 추계학술발표회
    • /
    • pp.462-466
    • /
    • 2003
  • This study was conducted to examine the potential of biosparging process in removing diesel contaminated soil and groundwater. The experiment was carried out lab-scale biosparging reactor and the biodegradation rate of diesel was evaluated as function of air injection rate and pattern. When renter was operated as air injection rate of 1000$m\ell$/min and pulsed air injection(15min pulse, 15min downtime), DO concentration in the renter was higher than another operating condition. The evidence for biodegradation of diesel was the $O_2$ utilization and $CO_2$ product following the cessation of sparging. Especially, air injection rate of 2000$m\ell$/min and pulsed air injection(15min pulse, 15min downtime) enhanced the diesel biodegradation during the operating. After 120day, the biodegradation rate of diesel was decreased as the lack of carbon source.

  • PDF

단층대와 복합지반을 통과하는 쉴드TBM의 굴진율 및 다운타임 발생 특성 분석 (Analysis of Advanced Rate and Downtime of a Shield TBM Encountering Mixed Ground and Fault Zone: A Case Study)

  • 정호영;김민철;이민우;전석원
    • 터널과지하공간
    • /
    • 제29권6호
    • /
    • pp.394-406
    • /
    • 2019
  • 도심지와 하·해저 터널에서는 연약지반 혹은 특수지반(단층대, 복합지반 등)을 조우할 가능성이 높으며, 이러한 조건에서는 TBM의 굴진율이 저하되고 다운타임이 증가하는 등의 문제점이 발생한다. 이러한 문제점들은 지반조사에서 발견되지 않은 불리한 지반조건에 기인하는 경우가 많으며, 굴진 중 수집된 굴진데이터를 근거로 향후 지층조건에 대한 최적의 운용조건을 결정하는 것이 최선이다. 본 연구는 향후 쉴드 TBM을 이용한 터널공사에서 단층대 및 복합지반에서의 효율적인 시공을 위하여 수행되었다. 외국의 사례를 통해 수집된 TBM의 굴진데이터를 활용하여 굴진율과 다운타임 발생 특성을 지층조건에 따라 분석하였다. 추력, 토크, RPM 등 주요 TBM의 기계데이터와 굴진율, 다운타임은 단층대와 복합지반의 특징에 따라 크게 영향을 받는 것을 확인하였고, 그 특징에 대하여 논하였다. 향후 국내외 유사한 지반에서의 TBM 시공 시 유용하게 활용될 수 있을 것으로 기대된다.

장기간 파.바람 조사를 통한 포항신항의 하역중단 원인 분석 (Downtime Analysis for Pohang New Harbor through Long-term Investigation of Waves and Winds)

  • 정원무;류경호;백원대;최혁진
    • 한국해안·해양공학회논문집
    • /
    • 제23권3호
    • /
    • pp.226-235
    • /
    • 2011
  • 포항신항의 대부분의 부두에서 빈번하게 발생하는 하역중단 문제의 원인을 규명하고 효율적인 대책안을 수립하기 위하여 항내 외의 다수 정점에서 1년동안 바람 및 파랑 조사를 수행하였다. 동시에 선석별 하역중단 기록과 기상청의 강수자료도 입수하여 상호 비교함으로써 하역중단 원인을 종합적으로 분석하였다. 우천에 의한 요인을 제외하면 하역중단은 너울, 풍파와 너울 및 풍파로 인한 항내 침입파고가 임계치를 초과하는 경우에 발생하는 것으로 나타났다. 최근까지 하역중단 원인의 하나로 지목되었던 주기 5~80분의 부진동 현상은 직접적인 연관성이 없는 것으로 나타났다. 항입구까지 단주기파에 구속되어 전파해오는 주기 0.5~3분의 외중력파의 파고는 항내에서 단주기파 파고와 거의 선형적인 관계를 나타내었다. 본 연구를 통하여 너울, 풍파 등의 단주기파 항내 침입을 효과적으로 차단할 경우 포항신항의 하역중단 문제를 크게 개선할 수 있을 것으로 판단되었다.