Analysis of Effect on Lightning Surge according to the Grounding Condition of Overhead Ground Wire in Distribution System (국내 배전계통의 가공지선 접지조건에 따른 뇌서지 영향 분석)

  • Han, Joon;Kim, Chul-Hwan;Seo, Hun-Chul;Choi, Sun-Kyu;Lee, Byung-Sung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.3
    • /
    • pp.331-337
    • /
    • 2014
  • The Korean distribution system consists of overhead ground wire (OHGW), phase conductors and neutral wire. Especially, OHGW is installed over the phase conductors to protect distribution system from the lightning surge. The flashover rate and the magnitude of lightning overvoltage on distribution system can be affected by grounding condition of OHGW such as grounding resistance and grounding interval. In this paper, we conduct an analysis of lightning overvoltage and flashover rate according to the grounding condition of OHGW. The distribution system and lightning surge are modeled by using ElectroMagnetic Transient Program (EMTP). Also, the Monte Carlo method is applied to consider random characteristics of lightning, and the flashover rate is calculated based on IEEE std. 1410. The simulations are performed by changing the grounding resistance and interval of OHGW and the simulation results are analyzed.

Autonomous Separation Methodology of Faulted Section based on Multi-Agent Concepts in Distribution System (멀티 에이전트 개념에 기반한 배전계통의 분산 자율적 고장구간 분리 기법)

  • Ko, Yun-Seok;Hong, Dae-Seung;Song, Wan-Seok;Park, Hak-Ryeol
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.6
    • /
    • pp.227-235
    • /
    • 2006
  • In this paper, autonomous separation methodology of faulted section based on network is proposed newly, which can minimize the outage effect as compared with the existing center-based faulted section separation method by determining and separating autonomously the faulted section by the free operation information exchange among IEDs on the feeder of distribution system. The all IEDs is designed in network in which client/server function is possible in order to separate autonomously the faulted section using PtP(Peer to Peer) communication. Also, Inference based solution of IED for the autonomous faulted section separation is designed by rules obtained from the analyzing results of distribution system topology. Here, the switch IEDs transmit on network the fault information utilizing on multi-casting communication method, at the fame time, determine selfly whether they operates or not by inferencing autonomously the faulted section using the inference-based solution after receiving the transmitted information. Finally, in order to verify the effectiveness and application possibility of the proposed methodology, the diversity fault cases are simulated for the typical distribution system.

A Study on Efficient Stock Arrangement of Distribution Center Using MBA Analysis and Simulation in Retail Business (유통업에서 MBA분석과 시뮬레이션을 이용한 물류센타 재고배치 효율화에 관한 연구)

  • Yeo, Sung-Joo;Seong, Kil-Young;Wang, Gi-Nam
    • IE interfaces
    • /
    • v.22 no.3
    • /
    • pp.234-242
    • /
    • 2009
  • It is most important for distribution center in retail business to delivery commodities in a timely manner. Accordingly, many companies try to make distribution center effective using the Warehouse Management System(WMS) integrated legacy system. Also, the Customer Relationship Management(CRM) is the most typical paradigm in management lately. Even though the WMS and CRM are independent system of each other, WMS, coupled with CRM makes customer satisfied more effectively. In this paper, we proposed the methodology for inventory location after analyzing and applying customer buying pattern data in the CRM through the MBA(Market Basket Analysis), which is part of data mining. We used an example modeling a real distribution center in retail through a 3D simulation tool and examined correlation between commodities using customer buying pattern. After that, we applied it to the inventory location system through the MBA in an example. Finally, we identified decrease in the time for picking, which is the majority of distribution center. Besides, we proposed a simulation methodology before applying new methodology. Consequently, it removes potential errors in advance and makes a optimized inventory location system.

A Decision-Supporting Model for Rehabilitation of Old Water Distribution Systems

  • Kim, Joong-Hoon;Geem, Zong-Woo;Lee, Hyun-dong;Kim, Seong-Han
    • Korean Journal of Hydrosciences
    • /
    • v.8
    • /
    • pp.31-40
    • /
    • 1997
  • Flow carrying capacity of water distribution systems is getting reduced by deterioration of pipes in the systems. The objective of this paper is to present a managerial decision-making model for the rehabilitation of water distribution systems with a mininum cost. The decisions made by the model also satisfy the requirements for discharge and pressure at demanding nodes in the systems. Replacement cost, pipe break repair cost, and pumping cost are considered in the economic evaluation of the decision along with the break rate and the interest rate to determine the optimal replacement time for each pipe. Then, the hydraulic integrity of the water distribution system is checked for the decision by a pipe network simulator, KYPIPE, if discharge and pressure requirements are satisfied. In case the system does not satisfy the hydraulic requirements, the decision made for the optimal replacement time is revised until the requirments are satisfied. The model is well applied to an existing water distribution system, the Seoul Metropolitan Water Supply System (1st Phase). The results show that the decisions for the replacement time determined by the economic analysis are accepted as optimal and hydraulic integrity of the system is in good condition.

  • PDF

Development Plans of Egg Industry Using International Comparison (국제비교를 통한 계란산업의 발전방안)

  • Kim, Yoon-Doo;Kim, Dong-Jin;Chae, Sue-Ho
    • Korean Journal of Poultry Science
    • /
    • v.47 no.1
    • /
    • pp.39-48
    • /
    • 2020
  • The present study intended to analyze and detect any possible shortcomings in the current egg distribution system in Korea through a questionnaire. The institutional system and cases of operation thereof in advanced countries such as the USA, Japan, and Germany for the development of the egg distribution industry in Korea. The results revealed the following issues: absent pricing system, ineffective egg distribution, and difficulty in balancing supply and demand. Suggestions for addressing these issues and the subsequent improvement were based on cases found in the instated systems of advanced countries, and were given as follows: (i) The existing GP Center needs to be separated from the farms of laying hens, and the current institutional system and its operations need to be improved and should be approved by the government. Parallel to the institutional improvement, establishing a distribution system centered on the GP Center would be desirable. (ii) Egg pricing regulations are needed as a standard to determine the price of eggs. (iii) The reinforcing control standards and securing means for egg preservation are pertinent to each stage of egg distribution and should take into account environmental factors such as egg preservation temperature to guarantee high hygiene standards and egg safety.

A Study on the Application of SFCL on 22.9 kV Bus Tie for Parallel Operation of Power Main Transformers in a Power Distribution System (배전계통에 전력용 변압기 병렬운전시 22.9 kV SFCL Bus Tie 적용방안에 관한 연구)

  • On, Min-Gwi;Kim, Myoung-Hoo;Kim, Jin-Seok;You, Il-Kyoung;Lim, Sung-Hun;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.1
    • /
    • pp.20-25
    • /
    • 2011
  • This paper analyzed the application of Superconducting Fault Current Limiter (SFCL) on 22.9 [kV] bus tie in a power distribution system. Commonly, the parallel operations of power main transformers offer a lot of merits. However, when a fault occurs in the parallel operation of power main transformer, the fault currents might exceed the interruption capacity of existing protective devices. To resolve this problem, thus, the SFCL has been studied as the fascinating device. In case that, Particularly, the SFCL could be installed to parallel operation of various power main transformers in power distribution system of the Korea Electric Power Corporation (KEPCO) on 22.9 [kV] bus tie, the effect of the resistance of SFCL could reduce the increased fault currents and meet the interruption capacity of existing protective devices by them. Therefore, we analyzed the effect of application and proposed the proper impedance of the R-type SFCL on 22.9 [kV] bus tie in a power distribution system using PSCAD/EMTDC.

Electrical Characteristics of ZnO Blocks by a Lightning Impulse Current and the Expert System to Diagnose Arrester Deterioration (뇌충격전류에 의한 산화아연형 피뢰기 소자의 전기적 특성과 피뢰기 열화진단 전문가 시스템)

  • Gil, Gyeong-Seok;Han, Ju-Seop;Song, Jae-Yong;Kim, Myeong-Jin;Kim, Jeong-Bae;Jo, Han-Gu
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.51 no.4
    • /
    • pp.152-157
    • /
    • 2002
  • This paper describes an effect of a single- and a quadruple-lightning impulse currents on electrical characteristics of ZnO blocks, and an expert system to diagnose arrestor deterioration. To deduce the parameters needed for diagnosing arrester deterioration, an accelerate deterioration teat is carried out. In the experiment, leakage current components are measured. Also, wave height distribution of the leakage current according to the progress of arrester deterioration is analyzed. From the experimental results, the wave height distribution of the leakage current showed conspicuous difference even in an immaterial leakage current increase. Therefore, the use of wave height distribution of the leakage current in deterioration diagnostic technique makes more accurate diagnosis than the conventional method by using only a leakage currant value. Finally, the expert system based on the experimental results is developed and the system can diagnose arrestor deterioration by measuring the leakage current and its wade height distribution.

A Study on Public Key Distribution System (공개키 분배방식에 관한 연구)

  • 권창영;원동호
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.15 no.12
    • /
    • pp.981-989
    • /
    • 1990
  • Thos paper summarized previously proposed several public key distribution systems and proposes a new public key distribution system to generate an common secret conference key for public key distribution systems three or more user. The now system is based on discrete exponentiation, that is all operations involve reduction modulo p for large prime p and we study some novel characteristics for computins multiplicative inverse in GF(p). We use one-way communication to distribute work keys, while the other uses two-way communication. The security of the new system is based on the difficulty of determining logarithms in a finite field GF(p) and stronger than Diffie-Hellman public key distribution system.

  • PDF

Development of Genetic Algorithm for Production and Distribution Management in Multiple Supplier Network Environment of Robot Engineering Industry (로봇 산업의 다중 공급망 환경을 고려한 생산 및 분배 관리를 위한 유전 알고리듬 개발)

  • Jo, Sung-Min;Kim, Tai-Young;Hwang, Seung-June
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.2
    • /
    • pp.147-160
    • /
    • 2013
  • Today, the management environments of intelligence firm are changing the way of production planning and logistics management, and are changing the process of supply chain management system. This paper shows the development of information system software for intelligence enterprises is used in supply chain management for robot engineering industry. Specifically, supply chain management system in this paper has been developed to analyze the impact of multi plant and multi distribution environment, showing the process analysis and system development of hierarchical assembly manufacturing industry. In this paper we consider a production planning and distribution management system of intelligence firm in the supply chain. We focus on a capacitated production resource and distribution volume allocation problem, develop a mixed integer programming model, and propose an efficient heuristic procedure using a genetic algorithm to solve it efficiently. This method makes it possible for the population to reach the feasible approximate solution easily. The proposed regeneration procedures, which evaluate each infeasible chromosome, makes the solution converge to the feasible approximate solution quickly.

Making Decision of the Maintenance Priority of Power Distribution System using Time Varying Failure Rate and Interruption Cost

  • Chu, Cheol-Min;Kim, Jae-Chul;Yun, Sang-Yun
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.1
    • /
    • pp.43-48
    • /
    • 2009
  • The purpose of the this paper is to make decision of the maintenance priority of power distribution system using Time-Varying Failure Rate(TVFR) with interruption cost. This paper emphasizes the practical use of the reliability indices and interruption cost. To make a decision of maintenance priority on power distribution system equipment, the quantification of the reliability level should be represented as a cost. In this paper, the TVFR of power distribution system equipment applied in this paper utilizes analytic method to use the historical data of KEPCO. From this result, the sensitivity analysis on TVFR of equipment was done for the priority, which represents that high priority of the equipment has more effect on system reliability, such as SAIDI or SAIFI, than other equipment. By this priority, the investment plan is established. In this result, customer interruption cost(CIC) could be extracted, and CIC is used as weighting factor to consider a importance of customer. After that, the result calculated the proposal method in this paper is compared with other priority method, such as lifetime, failure rate or only sensitivity.