• 제목/요약/키워드: dispatching strategy

검색결과 33건 처리시간 0.031초

Optimizing Automated Stacking Crane Dispatching Strategy Using an MOEA for an Automated Container Terminal

  • Wu, Jiemin;Choe, Ri;Park, Tae-Jin;Ryu, Kwang-Ryel
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2011년도 춘계학술대회
    • /
    • pp.216-217
    • /
    • 2011
  • The problem of automated stacking cranes (ASC) dispatching in container terminals is addressed in this paper. We propose a heuristic-based ASC dispatching approach which adopts multi-criteria decision strategy. By aggregating different criteria the proposed strategy can consider multiple aspects of the dispatching situation and make robust decision in various situations. A multi-objective evolutionary algorithm (MOEA) is adopted to tune the weights associated to each criteria to minimize both the quay crane delay and external truck delay. The proposed approach is validated by comparison with different dispatching heuristics and simulation results obtained confirms its effectiveness.

  • PDF

자동화 컨테이너 터미널의 복수 규칙 기반 AGV 배차 전략 최적화 (Optimizing dispatching strategy based on multicriteria heuristics for AGVs in automated container terminal)

  • 김정민;최이;박태진;류광렬
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2011년도 춘계학술대회
    • /
    • pp.218-219
    • /
    • 2011
  • 본 논문은 컨테이너 운송을 위한 AGV(Automated Guided Vehicle) 배차 전략을 대상으로 한다. AGV 배차 문제는 안벽 크레인의 대기 시간과 AGV의 주행 거리를 최소화하도록 AGV에 작업을 할당하는 것이 목표이다. 터미널 환경의 동적인 특성으로 인해 계획 결과의 정확한 예측이 어렵고 수정이 빈번하기 때문에 실무에서는 의사결정 시간이 짧은 단순 규칙 기반 배차가 많이 쓰인다. 그러나 단순 규칙 기반 배차는 근시안적 특성으로 인해 배차의 다양한 성능 지표를 만족시키지 못하는 한계가 있으며 이를 극복하기 위해 본 논문에서는 복수 규칙 기반의 배차 전략을 제안한다. 복수 휴리스틱 기반 배차 전략은 여러 규칙의 가중합으로 구성되며 규칙 사이의 가중치를 최적화하기 위해 다목적 진화 알고리즘을 적용하였다. 시뮬레이션 실험을 통해 제안 방안이 기존 단일 규칙 기반 배차에 비해 더 좋은 성능을 보임을 확인하였다.

  • PDF

자동화 컨테이너 터미널의 복수 규칙 기반 AGV 배차전략 최적화 (Optimizing dispatching strategy based on multicriteria heuristics for AGVs in automated container terminal)

  • 김정민;최이;박태진;류광렬
    • 한국항해항만학회지
    • /
    • 제35권6호
    • /
    • pp.501-507
    • /
    • 2011
  • 본 논문은 컨테이너 운송을 위한 AGV(Automated Guided Vehicle) 배차 전략을 대상으로 한다. AGV 배차 문제는 안벽 크레인의 대기 시간과 AGV의 주행 거리를 최소화하도록 AGV에 작업을 할당하는 것이 목표이다. 터미널 환경의 동적인 특성으로 인해 계획 결과의 정확한 예측이 어렵고 수정이 빈번하기 때문에 실무에서는 의사결정 시간이 짧은 단순 규칙 기반 배차가 많이 쓰인다. 그러나 단순 규칙 기반 배차는 근시안적 특성으로 인해 배차의 다양한 성능 지표를 만족시키지 못하는 한계가 있으며 이를 극복하기 위해 본 논문에서는 복수 규칙 기반의 배차 전략을 제안한다. 복수 휴리스틱 기반 배차 전략은 여러 규칙의 가중합으로 구성되며 규칙 사이의 가중치를 최적화하기 위해 다목적 진화 알고리즘을 적용하였다. 시뮬레이션 실험을 통해 제안 방안이 기존 단일 규칙 기반 배차에 비해 더 좋은 성능을 보임을 확인하였다.

컨테이너터미널에서 다기능 이송차량의 2단계 배차 방안 (A Study on Two-step Dispatching for Multi-function Transport Vehicle at Container Terminal)

  • 최용석;김우선
    • 한국항해항만학회지
    • /
    • 제32권10호
    • /
    • pp.829-835
    • /
    • 2008
  • 본 연구의 목적은 컨테이너터미널에서 사용되는 다기능 이송차량을 위한 2단계 배차전략을 제시하는 것이다. 2단계 배차는 실시간 위치 제어를 사용하여 이송차량과 크레인간의 대기시간을 절감시키기 위한 방법이다. 배차 1단계는 실시간 위치정보를 바탕으로 목적지 위치를 할당하는 것이며, 기존의 실시간 배차에서 이용되는 방식에 모니터링을 보안한 것이다. 배차 2단계는 이송차량의 싣기, 놓기, 집기 등의 기능을 작업장소의 작업상황에 따라 선택하여 작업지시를 내리는 것이다. 다기능 이송차량의 2단계 배차전략은 하역시스템의 대기시간을 감소시켜 생산성 향상에 기여할 것이다.

AutoMod를 활용한 효율적 작업배정에 관한 연구 (A Study on the Job Dispatching using AutoMod)

  • 김봉선;이승무;이석환
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2007년도 추계학술대회
    • /
    • pp.163-180
    • /
    • 2007
  • The purpose of this paper is to develop an efficient production strategy with changing factors to influence the productivity. The factors would be the number of Multi-Function worker, the method of job dispatching, and lot size. A simulation model has been developed for this study. We used AutoMod simulation and the process activity was animated to follow the flow of process easily. The alternatives have been tested through the simulation model, and the various alternatives is proposed for the efficient production strategy. We hope that the system is applied to similar types of small and medium-sized enterprises to develop an efficient production strategy and to achieve the satisfactory result.

  • PDF

AutoMod를 활용한 작업배정에 관한 연구 (A Study on the Job Dispatching using AutoMod)

  • 김봉선;이승무;이석환
    • 대한안전경영과학회지
    • /
    • 제9권6호
    • /
    • pp.181-191
    • /
    • 2007
  • The purpose of this paper is to develop an efficient production strategy with changing factors to influence the productivity. The factors would be the number of Multi-Function worker, the method of job dispatching, and lot size. A simulation model has been developed for this study. We used AutoMod simulation and the process activity was animated to follow the flow of process easily. The alternatives have been tested through the simulation model, and the various alternatives is proposed for the efficient production strategy. We hope that the system is applied to similar types of small and medium-sized enterprises to develop an efficient production strategy and to achieve the satisfactory result.

유전 알고리즘을 이용한 자동화 컨테이너 터미널에서의 장치장 크레인의 작업 할당 전략 (Automated Stacking Crane Dispatching Strategy in a Container Terminal using Genetic Algorithm)

  • 우졔민;양영지;최이;류광렬
    • 한국항해항만학회지
    • /
    • 제36권5호
    • /
    • pp.387-394
    • /
    • 2012
  • 자동화 컨테이너 터미널에서 자동화 장치장 크레인(ASC)은 장치장 블록 내에서의 컨테이너 운송을 담당한다. 본 논문에서는 크기와 사양이 동일한 두 대의 ASC의 작업 할당 문제를 해결하기 위한 다중 평가 기준 전략을 제안한다. 제안 방안은 컨테이너 터미널의 상황을 다각적으로 고려하기 위하여 여러 평가 요소를 통해 후보 작업을 평가하고, 결과를 가중합함으로써 가장 높은 점수를 얻은 작업을 크레인에 할당하는 방식을 취한다. 본 논문에서는 작업 할당을 위한 평가 기준을 고안하고, 평가 결과를 취합하기 위한 가중치를 유전 알고리즘을 이용하여 최적화하는 방안을 제안한다. 실험 결과를 통하여 제안 방안이 낮은 계산 비용으로 실시간 터미널에 적합함을 보이고, 다양한 평가 기준을 통한 작업 할당이 컨테이너 터미널의 효율을 개선시킴을 확인하였다.

자동화 컨테이너 터미널에서 이적작업을 위한 장치장 크레인 작업할당 (Yard Crane Dispatching for Remarshalling in an Automated Container Terminal)

  • 배종욱;박영만
    • 한국항해항만학회지
    • /
    • 제36권8호
    • /
    • pp.665-671
    • /
    • 2012
  • 이적작업은 자동화 컨테이너 터미널에서 하역작업의 생산성을 높이는 운영 전략으로 연구되고 있다. 이는 장치장 블록 내 컨테이너들의 재배치 작업을 의미한다. 이적작업의 크레인 작업할당 문제는 작업가능시간에 대한 제약을 고려하여 이적작업의 효과를 최대화하기 위해 가능한 이적작업 중에서 효율적인 이적작업을 선정하고 이들의 작업순서를 정하는 것이다. 본 연구는 혼합정수계획법을 활용하여 장치장 크레인의 작업할당 문제에 대한 최적화 수리모형을 개발하고 이의 예를 제시하였다. 그러나 수리모형은 계산시간이 많이 소요되어 현장에서 사용되기 어렵다. 따라서 현실 적용을 위해 대표적인 5개의 작업할당 규칙을 비교 평가하였다. 수치실험에서 maximum weight ratio(MR) 규칙이 전반적으로 뛰어난 성능을 보였다.

Probabilistic Load Flow for Power Systems with Wind Power Considering the Multi-time Scale Dispatching Strategy

  • Qin, Chao;Yu, Yixin;Zeng, Yuan
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권4호
    • /
    • pp.1494-1503
    • /
    • 2018
  • This paper proposes a novel probabilistic load flow model for power systems integrated with large-scale wind power, which considers the multi-time scale dispatching features. The ramp limitations of the units and the steady-state security constraints of the network have been comprehensively considered for the entire duration of the study period; thus, the coupling of the system operation states at different time sections has been taken into account. For each time section, the automatic generation control (AGC) strategy is considered, and all variations associated with the wind power and loads are compensated by all AGC units. Cumulants and the Gram-Charlier expansion are used to solve the proposed model. The effectiveness of the proposed method is validated using the modified IEEE RTS 24-bus system and the modified IEEE 118-bus system.

A POLLED DISPATCHING STRATEGY FOR AUTOMATED GUIDED VEHICLES IN PORT CONTAINER TERMINALS

  • Bae, Jong Wook;Kim, Kap Hwan
    • Management Science and Financial Engineering
    • /
    • 제6권2호
    • /
    • pp.47-67
    • /
    • 2000
  • It is discussed how to assign delivery tasks to automated guided vehicles (AGVs) for multiple container cranes in automated container terminals. The primary goal of dispatching AGVs is to complete all the lading and discharging operations as early as possible, and the secondary goal is to minimize the total travel distance of AGVs. It is assumed that AGVs are not dedicated to a specific container crane but shared among multiple cranes. A mathematical formulation is developed and a heuristic algorithm is suggested to obtain a near optimal solution with a reasonable amount of computational time. The single-cycle and the dual-cycle operations in both the seaside and the landside operations are analyzed. The effects of pooling AGVs for multiple container cranes on the performance of an entire AGV system are also analyze through a numerical experiment.

  • PDF