• Title/Summary/Keyword: dismantling work

Search Result 79, Processing Time 0.036 seconds

Estimation of the Asbestos Handling History of Workers in the Automobile Manufacturing Industry in Korea (자동차 제조 사업장 근로자들의 석면 취급 이력 추정)

  • Choi, Sangjun;Kim, Shinbum;Choi, Youngeun
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.27 no.4
    • /
    • pp.423-432
    • /
    • 2017
  • Objectives: This study was conducted to evaluate asbestos handling history of workers at automobile manufacturing plants in Korea. Methods: National regulations on asbestos and Korea Occupational Safety and Health Agency(KOSHA) database on the information of asbestos containing products were reviewed. We investigated asbestos related materials from one automobile manufacturing plant. Material safety data sheets(MSDS) collected in 2010, work environment monitoring results reported from 2000 to 2013, trade union reports and asbestos survey reports were reviewed. We also interviewed workers with long career and did walk-through survey. Results: The Ministry of Labor in Korea has permitted asbestos manufacturing since 1990. In 1997, the use of crocidolite and amosite asbestos were banned. In 2007, the Korean government announced a total ban on the manufacturing, importation and use of all kinds of asbestos, which took full effect in 2009. A total of 174 asbestos products information from KOSHA database was analyzed. Extruded cement panel for building, special brake for crane farm machinery, gasket, joint sheet and thermal insulator were produced until 2007. From automobile manufacturing plant survey, we confirmed that asbestos containing materials(ACM) such as gasket, heating induction materials have been used until 2011. Asbestos containing building materials(ACBM) such as bamlites, slate and ceiling tex were reported at 122 asbestos dismantling projects in 2014. Conclusion: Although the use of all kinds of asbestos were banned from 2009, ACMs and ACBMs installed before 2009 were still found at automobile manufacturing plant until 2011 and 2014 respectively. In particular, asbestos slates should be managed because most of slates had not been removed until 2014.

The Study for the Fast Detection of the Stereo Radiation Detector using the Image Processing (영상처리기반 스테레오 감마선 탐지장치의 고속탐지에 관한 연구)

  • Hwang, Young-gwan;Lee, Nam-ho
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.10a
    • /
    • pp.1103-1105
    • /
    • 2015
  • Leaked Radioactive source in nuclear power station, radiation related facilities and the aging nuclear power plant for the dismantling must need to detect and remove early to prevent major accidents. In this paper, we implemented a single sensor-based gamma-ray detectors stereo which can provide the distance to the radiation source, a direction and doserate information for fast and efficient decontamination work the radiation source. And we have carried out an algorithm development for high-speed detection of the detection equipment. Two detectors are required for stereo structure for obtaining the distance information of the radioactive source, but we designed the only sensor-based detection device for the weight reduction. We have extracted the region of interest and obtained the distance calculation result and distribution of radiation source in order to minimize a stereo image acquisition time. Detection time of the algorithm showed a shorter time of about 41%.

  • PDF

Scheduling Technique for Remodeling Project of Inhabited Condition (재실 리모델링 특성을 반영한 공정계획 기법)

  • Paik, Hwa-Sook;Nam, Wook-Jin;Kim, Sung-Han;Kim, Hyung-Jin;Choi, Jong-Soo;Kim, Kyung-Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.141-149
    • /
    • 2013
  • This paper presents a scheduling technique that reflects various constraints in remodeling project of inhabited condition. The remodeling project of inhabited condition is required more detailed planning and control due to claims by noise, vibration, dust, smells, limited lift capacity, and limited temporary stock area. Because of the constraints, complexity in scheduling is increased and earlier completion is required to reduce the possibility of safety and environment accidents. Especially, in case of inhabited condition, the scheduling should be linked day-time/night-time/weekend work. This paper proposes a structured scheduling technique to incorporate those constraints in remodeling of inhabited condition. This scheduling technique considers not only remodeling process but also dismantling, newly-construction, and residents movement. Process expression method using MS-Project also presented to keep connectivity with existing scheduling system.

A Study on the Repair Method for Performance Degradation Cause of Korean Arch Bridge -Focused on the Seonamsa Seungseonggyo, Songgwangsa Geukrockgyo- (홍예교 성능저하 원인에 따른 보수방안 고찰 - 선암사 승선교·송광사 극락교를 중심으로 -)

  • Kim, Jeong-Eon;Cheon, Deuk-Youm
    • Journal of architectural history
    • /
    • v.23 no.1
    • /
    • pp.7-19
    • /
    • 2014
  • This study considers the proper repair techniques by examining the most representative repair cases of the Korean arch bridges and proposes the constructional manual which can apply similar occasions. The cases are Seonamsa Seungseongyo and Songgwangsa Geukrockgyo where this researcher had taken part in the repair works. This Study proposes the maintenance construction manual about the performance degradation drew by performance degradation of the both Korean arch bridges in the maintenance process. First, arch bridge maintenance should be carried out in the dry season, when water is impermeable in the bottom surface of the bridge. Moreover, risk factors of the maintenance should be excluded to secure the water vally flow, the bypass and the temporary bridge. Second, prior to repair, it has to precede (1)3D shooting (2)formal examination (3)structure safety test (4)geological and lithic surveys (5)arch curvature establishment and makeshift frame settlement before transformation (6)relationship expert comments. Third, if the baduk and the foundation stones are inevitable to replace due to performance degradation on the foundation, it should use the high quality stones and secure greater stress by extending the standard range. The foundation on irregular rock needs to be flattened and underside on the replaced materials require Grengyijil to deliver the equal loads. Fourth, In the process of dismantling the stones of the arched bridge, it could make heavy weathering degree and not reuse the materials. Charge should converge the expert advices to choose the reuseable, the conservate and the alternative materials, and increase the reutilization of the raw materials by preservation and reinforcement treatments. Fifth, the side wall should be repaired by the rubble work technique which is not able to pile compost satiety, so it must use long depth of masonary stones for reinforcement. It is considered to reinforce the stone wall in shore as much as possible and protect the abutment and the side wall on the upstream for the arch bridge maintenance works.

Recycling Waste Paste from Concrete for Solidifying Agent (콘크리트 폐기물에서 분리된 페이스트를 활용한 고화재 기술개발 기초연구)

  • Mun, Young-Bum;Choi, Hyun-Kuk;Kim, Jae-Young;Lee, Jea-Hyung;Chung, Chul-Woo;Kim, Ji-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.3
    • /
    • pp.269-277
    • /
    • 2017
  • In this work, as a preliminary experimental works, which focuses on utilizing separated pastes from activated (or radioactive) concrete as solidifying agents for radioactive waste immobilization, were performed. It was found that density of hydrated cement paste, which was lower than that of ordinary portland cement, increased as temperature for heat treatment increased. Highest compressive strength was observed with the specimens that was heat treated at $600^{\circ}C$. However, heat treatment over $700^{\circ}C$ showed higher CaO content that caused higher heat of hydration after in contact with water, lows of workability, and lower strength. Based on experimental results, it is suggested that $600^{\circ}C$ heat treatment is more appropriate for waste cement paste to be used as a solidifying agent.

A Nietzsche's Critical Theory of Justice (니체의 정의론에 대한 비판적 고찰)

  • Kang, Yong-soo
    • Journal of Korean Philosophical Society
    • /
    • v.147
    • /
    • pp.1-28
    • /
    • 2018
  • In order to reveal the differentiation of Nietzsche's justice theory, this paper attempted an intrinsic analysis of the political act of establishing a social contract with others through the fundamental concept of "will to the power", and the politics of modern nation including utilitarianism, liberalism and democracy. I will deal with criticism of ideology. In other words, it will be a work to clarify the fictitiousness and errors by digging out the ground of the value of justice as 'genealogical psychology' which strips off the psychological layers hidden behind the name of universal truth called 'virtue'. By dismantling the notion of self-righteous justice based on 'virtue' from 'immorality' as well as 'out of morality', it aims to reveal a new emotional dimension based on love, not retaliation. When Nietzsche emphasizes the role of positive emotions such as 'mercy' and 'forgiveness' rather than negative emotions such as revenge, retaliation, and grudge, while analyzing justice in the dynamics of power relations, By allowing exception rule, we will critically analyze whether universality and consistency are lost.

Robust Design for Parts of Induction Bolt Heating System (유도가열시스템의 구성부품에 대한 강건설계)

  • Kim, Doo Hyun;Kim, Sung Chul;Lee, Jong Ho;Kang, Moon Soo;Jeong, Cheon Kee
    • Journal of the Korean Society of Safety
    • /
    • v.36 no.2
    • /
    • pp.10-17
    • /
    • 2021
  • This paper presents the robust design of each component used in the development of an induction bolt heating system for dismantling the high-temperature high-pressure casing heating bolts of turbines in power plants. The induction bolt heating system comprises seven assemblies, namely AC breaker, AC filter, inverter, transformer, work coil, cable, and CT/PT. For each of these assemblies, the various failure modes are identified by the failure mode and effects analysis (FMEA) method, and the causes and effects of these failure modes are presented. In addition, the risk priority numbers are deduced for the individual parts. To ensure robust design, the insulated-gate bipolar transistor (IGBT), switched-mode power supply (SMPS), C/T (adjusting current), capacitor, and coupling are selected. The IGBT is changed to a field-effect transistor (FET) to enhance the voltage applied to the induction heating system, and a dual-safety device is added to the SMPS. For C/T (adjusting current), the turns ratio is adjusted to ensure an appropriate amount of induced current. The capacitor is replaced by a product with heat resistance and durability; further, coupling with a water-resistant structure is improved such that the connecting parts are not easily destroyed. The ground connection is chosen for management priority.

Strategies and difficulties of making Jeokbyeok-ga into Changguk (<적벽가> 창극화의 전략과 한계)

  • Lee, Jin-Joo
    • (The) Research of the performance art and culture
    • /
    • no.39
    • /
    • pp.31-67
    • /
    • 2019
  • This thesis examines the difficulties of utilizing the narrative and music of Pansori: 판소리 in Changguk: 창극. For this examination, I consider that the reason for the difficulty of making Changguk is the difference between Pansori and Changguk as the genres. Most of the Changguk based on the traditional five Pansori works perform the narration and songs of Pansori literally. However, the original narrative of Pansori has a distinctive dual structure since the formation of its first and second half is created separately. As the drama genre visualizes the story and emphasizes the consistency of action, unlike Pansori, the duality of the original narrative can be seen as the inconsistency of the action. In addition, since the sounds of the original Pansori are rather explanatory than dramatic even in the climax scenes of Jeokbyeok battlefields, it is difficult to produce dramatic scenes in Changguk. The voices of the military, not in the original works, play important roles in revealing the hidden theme effectively in Changguk. However It is impossible to relocate the original text of Pansori into Changguk, as even the voices of the military lack verisimilitude in terms of narrative. Changguk can only be developed as its own work by actively researching and dismantling Pansori .

Level of Lead in Air and Blood Zinc Protoporphyrin of Workers in Lead Plants (연 취급 노동자의 연 폭로 수준 및 혈중 Zinc Protoporphyrin 농도)

  • 김창영
    • Journal of Environmental Health Sciences
    • /
    • v.17 no.1
    • /
    • pp.95-103
    • /
    • 1991
  • For the purpose of estimating the working environment and the relationship between the airborne lead concentration and the ZPP level in the whole blood of the workers, the airborne lead concentrations and the ZPP level were measured at the 26 plants which deal with lead, from October 5 to November 5 in 1988. Analysis of the airborne lead concentration was performed by NIOSH Method 7082, and the ZPP level was measured by a hematofluorometer. The following results are concluded. 1. The average airborne lead concentration of the lead battery manufactures is 0.025mg/m$^{3}$ and that of the secondary lead smelters is 0.023mg/m$^{3}$. There were no significant differences between industry (p>0.1) 2. At the lead battery manufacture, the process of lead powder production showed the highest concentration of 0.034mg/m$^{3}$ but there were no significant differences among the processes (p>0.1). At the secondary lead smelter, the process of dismantling waste batteries showed the highest concentration 0.141mg/m$^{3}$, and there were very significant differences among the processes (p<0.005). 3. The ZPP level in the whole blood showed significant differences between industry (p<0.10). The average ZPP level of the lead battery manufactures is 133.0 + 106.3 $\mu$g/100ml and that of the secondary lead smelters is 149.6 + 110.9 $\mu$g/100ml. 4. The correlation coefficients between the airborne lead concantration and ZPP level were 0. 426 (p<0.001) for the lead battery manufactures and 0.484 (p<0.001) for the secondary lead smelters. The correlation coefficients between the work duration (in months) and the ZPP level were 0.238 (p<0.001) for the lead battery mannfactures and 0.075 (p>0.10) for the secondary lead smelters. 5. The linear regression equation, with the airborne lead concentration as an independent variable and the ZPP level as a dependent variable, is Y=96.84+1300.34X (r=0.448, p<0.001) for the 26 plants which deal with lead. The linear regression equation, with the work duration(in months) as an independent variable and the ZPP level as a dependent variable, is Y=127.28 +0.49X (r=0.162, p<0.05). 6. The correlation coefficients between the amount of inhaled lead and ZPP level were 0.349 (p < 0.001) for the lead battery manufactures and 0.318(p<0.001) for the secondary lead smeltes. The linear regression equation for the 26 plants surveyed, with the amount of inhaled lead as an independent variable and ZPP level as a dependent variable, is Y=123.63+18.82X (r=0. 335, p<0.001).

  • PDF

Structural Capacity Evaluation of System Scaffolding using X-Type Advanced Guardrail (교차가새형 선행 안전난간을 적용한 시스템비계의 구조 성능 평가)

  • Park, J.D.;Lee, H.S.;Shin, W.S.;Kwon, Y.J.;Park, S.E.;Yang, S.S.;Jung, K.
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.5
    • /
    • pp.49-58
    • /
    • 2020
  • In domestic construction sites, when installing steel pipe scaffolding and system scaffolding, the guardrails are installed after the installation of the work platforms. This conventional guardrail system (CGS) is always exposed to the risk of falls because the safety railing is installed later. In order to prevent fall disasters during erecting and dismantling scaffolds, it is necessary to introduce the advanced guardrail system (AGS) which installs railings in advance of climbing onto a work platform. For the introduction of the AGS, the structural performance of the system scaffolding applying the CGS and the AGS was compared and evaluated. The structural analysis of the system scaffold (height: 31 m and width: 27.4 m) with AGS confirmed that structural safety was ensured because the maximum stress of each element of the system scaffolding satisfies the allowable stress of each element. As a result of performance comparison of CGS and AGS for each element, the combined stress ratio of vertical posts in AGS was 6.4% lower than that of CGS. In addition, in the case of ledger and transom, the combined stress ratios of AGS and CGS were almost the same. The compression test of the assembled system scaffolding (three-storied, 1 bay) showed that the AGS had better performance than the CGS by 9.7% (8.91 kN). The cross bracing exceeds the limit on slenderness ratio of codes for structural steel design. But the safety factor for the compressive load of the cross bracing was evaluated as meeting the design criteria by securing 3 or more. In actual experiments, it was confirmed that brace buckling did not occur even though the overall scaffold was buckled. Therefore, in the case of temporary structures, it was proposed to revise the standards for limiting on slenderness ratio of secondary or auxiliary elements to recommendations. This study can be used as basic data for the introduction of AGS for installing guardrails in advance at domestic construction sites.