Browse > Article
http://dx.doi.org/10.7738/JAH.2014.23.1.007

A Study on the Repair Method for Performance Degradation Cause of Korean Arch Bridge -Focused on the Seonamsa Seungseonggyo, Songgwangsa Geukrockgyo-  

Kim, Jeong-Eon (전남대학교 건축공학과)
Cheon, Deuk-Youm (전남대학교 건축학부)
Publication Information
Journal of architectural history / v.23, no.1, 2014 , pp. 7-19 More about this Journal
Abstract
This study considers the proper repair techniques by examining the most representative repair cases of the Korean arch bridges and proposes the constructional manual which can apply similar occasions. The cases are Seonamsa Seungseongyo and Songgwangsa Geukrockgyo where this researcher had taken part in the repair works. This Study proposes the maintenance construction manual about the performance degradation drew by performance degradation of the both Korean arch bridges in the maintenance process. First, arch bridge maintenance should be carried out in the dry season, when water is impermeable in the bottom surface of the bridge. Moreover, risk factors of the maintenance should be excluded to secure the water vally flow, the bypass and the temporary bridge. Second, prior to repair, it has to precede (1)3D shooting (2)formal examination (3)structure safety test (4)geological and lithic surveys (5)arch curvature establishment and makeshift frame settlement before transformation (6)relationship expert comments. Third, if the baduk and the foundation stones are inevitable to replace due to performance degradation on the foundation, it should use the high quality stones and secure greater stress by extending the standard range. The foundation on irregular rock needs to be flattened and underside on the replaced materials require Grengyijil to deliver the equal loads. Fourth, In the process of dismantling the stones of the arched bridge, it could make heavy weathering degree and not reuse the materials. Charge should converge the expert advices to choose the reuseable, the conservate and the alternative materials, and increase the reutilization of the raw materials by preservation and reinforcement treatments. Fifth, the side wall should be repaired by the rubble work technique which is not able to pile compost satiety, so it must use long depth of masonary stones for reinforcement. It is considered to reinforce the stone wall in shore as much as possible and protect the abutment and the side wall on the upstream for the arch bridge maintenance works.
Keywords
Arch Bridge; Seungseongyo Bridge; Geukrockgyo Bridge; Degradation of Performance;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Goheung County, Precision ordnance survey report of Goheung-Honggyo, 2003
2 Cultural Heritage Administration, Structure stability research reports of Sungnyemun lower masonry, 2011
3 Cheon, Deuk-Youm, Traditional Architecture of Jeonnam Region, Chonnam University publisher, 1999
4 Suncheon City, Measurement & Repair report of Seungseongyo Bridge of Seonamsa Temple, 2004
5 Jeong, Mong-Sub, A Study on structural form by function in Korean Traditional Arch, Department of Architectural engineering Master the graduate school of Myongji University, 1992
6 Hangook Gunsul Anjeon Gisulwon, Structure stability research reports of Songgwangsa Geukrockgyo Bridge, 2005
7 Songgwangsa Temple, Repair report of Songgwangsa Geukrockgyo Bridge, 2008
8 Son, Young-Sik, A Study on the Type of Old Bridges in Korea, Department of Civil Engineering Ph. D. the graduate school of Hanyang University, 1992
9 Cheon, Deuk-Youm.Jeon, Bong-Hee, Architectural Cultural properties of Korean(Jeonnam-Province), Gimondang, 2002