• Title/Summary/Keyword: discrete preventive maintenance

Search Result 7, Processing Time 0.024 seconds

Warranty Models with Discrete Preventive Maintenance (이산예방보수 정책을 고려한 보증모형분석)

  • Kim, Che-Soong
    • IE interfaces
    • /
    • v.15 no.3
    • /
    • pp.286-296
    • /
    • 2002
  • Products which are sold with warranty, preventive maintenance actions by manufacturers and/or buyers have an impact on the total costs for both parties. In this paper, we develop the models to study the expected warranty cost for products with free repairable warranty with three types of discrete preventive maintenance. We deal with by utilizing the concept that preventive maintenance reduces the virtual age of the system. We assume that the maintenance planning horizon can be segmented into k discrete and equally sized periods. In such a scenario, numerical examples are presented.

An Effective Priority Method Using Generator's Discrete Sensitivity Value for Large-scale Preventive Maintenance Scheduling (발전기 이산 민감도를 이용한 효율적인 우선순위법의 대규모 예방정비계획 문제에의 적용 연구)

  • Park, Jong-Bae;Jeong, Man-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.3
    • /
    • pp.234-240
    • /
    • 1999
  • This paper presents a new approach for large-scale generator maintenance scheduling optimizations. The generator preventive maintenance scheduling problems are typical discrete dynamic n-dimensional vector optimization ones with several inequality constraints. The considered objective function to be minimized a subset of{{{{ { R}^{n } }}}} space is the variance (i.g., second-order momentum) of operating reserve margin to levelize risk or reliability during a year. By its nature of the objective function, the optimal solution can only be obtained by enumerating all combinatorial states of each variable, a task which leads to computational explosion in real-world maintenance scheduling problems. This paper proposes a new priority search mechanism based on each generator's discrete sensitivity value which was analytically developed in this study. Unlike the conventional capacity-based priority search, it can prevent the local optimal trap to some extents since it changes dynamically the search tree in each iteration. The proposed method have been applied to two test systems (i.g., one is a sample system with 10 generators and the other is a real-world lage scale power system with 280 generators), and the results anre compared with those of the conventional capacith-based search method and combinatorial optimization method to show the efficiency and effectiveness of the algorithm.

  • PDF

Development of a Simulation System for Reliability Centered Maintenance (신뢰성 기반 정비를 위한 시뮬레이션 시스템 개발)

  • Yun, Won-Young;Son, Sung-Min;Kim, Jong-Woon
    • IE interfaces
    • /
    • v.13 no.3
    • /
    • pp.521-527
    • /
    • 2000
  • A simulation model is developed for planning maintenance, and it can be used in the procedure of Reliability-Centered Maintenance. System availability and the total cost of system operation are predicted by discrete event simulation. These two kinds of output are useful to determine the interval of preventive maintenance. This paper describes simulation logic, and focuses on modeling the maintenance effects and the relations of maintenance works. An example is described for illustrating the simulation model.

  • PDF

Optimal control of stochastic continuous discrete systems applied to FMS

  • Boukas, E.K.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1989.10a
    • /
    • pp.733-743
    • /
    • 1989
  • This paper deals with the control of system with controlled jump Markov disturbances. A such formulation was used by Boukas to model the planning production and maintenance of a FMS with failure machines. The optimal control problem of systems with controlled jump Markov process is addressed. This problem describes the planning production and preventive maintenance of production systems. The optimality conditions in both cases finite and infinite horizon, are derived. A numerical example is presented to validate the proposed results.

  • PDF

Discounted Cost Model of Condition-Based Maintenance Regarding Cumulative Damage of Armor Units of Rubble-Mound Breakwaters as a Discrete-Time Stochastic Process (경사제 피복재의 누적피해를 이산시간 확률과정으로 고려한 조건기반 유지관리의 할인비용모형)

  • Lee, Cheol-Eung;Park, Dong-Heon
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.29 no.2
    • /
    • pp.109-120
    • /
    • 2017
  • A discounted cost model for preventive maintenance of armor units of rubble-mound breakwaters is mathematically derived by combining the deterioration model based on a discrete-time stochastic process of shock occurrence with the cost model of renewal process together. The discounted cost model of condition-based maintenance proposed in this paper can take into account the nonlinearity of cumulative damage process as well as the discounting effect of cost. By comparing the present results with the previous other results, the verification is carried out satisfactorily. In addition, it is known from the sensitivity analysis on variables related to the model that the more often preventive maintenance should be implemented, the more crucial the level of importance of system is. However, the tendency is shown in reverse as the interest rate is increased. Meanwhile, the present model has been applied to the armor units of rubble-mound breakwaters. The parameters of damage intensity function have been estimated through the time-dependent prediction of the expected cumulative damage level obtained from the sample path method. In particular, it is confirmed that the shock occurrences can be considered to be a discrete-time stochastic process by investigating the effects of uncertainty of the shock occurrences on the expected cumulative damage level with homogeneous Poisson process and doubly stochastic Poisson process that are the continuous-time stochastic processes. It can be also seen that the stochastic process of cumulative damage would depend directly on the design conditions, thus the preventive maintenance would be varied due to those. Finally, the optimal periods and scale for the preventive maintenance of armor units of rubble-mound breakwaters can be quantitatively determined with the failure limits, the levels of importance of structure, and the interest rates.

A Study on Simulation Model for RAM Analysis of SWRO Plant (SWRO 플랜트의 RAM 분석을 위한 시뮬레이션 모델 연구)

  • Kim, Yong Soo;Park, Jungwon;Choi, Sukho;Kang, Jun-Gyu
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.4
    • /
    • pp.1-10
    • /
    • 2019
  • The Sea Water Reverse Osmosis (SWRO) plant should take into account the availability of the plant from the design stage for long-term and continuous fresh water production. As it occurs, it is necessary to establish a corrective maintenance plan and preventive maintenance plan to maintain availability. In the field of complex engineering structures such as seawater desalination plants, it is difficult to estimate the reliability or availability of the system in a mathematical way. This study develops RAM analysis framework and model, and proposes discrete event simulation model as a application sowtware specialized for seawater desalination plant. Considering the characteristics of the plant maintenance, in case of corrective maintenance, we propose a preventive maintenance policy that not only repairs or replaces a single-broken part, but also simultaneously maintains all accessible parts according to the level of overhaul. A case study was conducted to estimate the availability of the system based on the field data of the seawater desalination plant in Korea and Saudi Arabia. The result was close to the expected availability of the plant.

Prediction of Flashover and Pollution Severity of High Voltage Transmission Line Insulators Using Wavelet Transform and Fuzzy C-Means Approach

  • Narayanan, V. Jayaprakash;Sivakumar, M.;Karpagavani, K.;Chandrasekar, S.
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.5
    • /
    • pp.1677-1685
    • /
    • 2014
  • Major problem in the high voltage power transmission line is the flashover due to polluted ceramic insulators which leads to failure of equipments, catastrophic fires and power outages. This paper deals with the development of a better diagnostic tool to predict the flashover and pollution severity of power transmission line insulators based on the wavelet transform and fuzzy c-means clustering approach. In this work, laboratory experiments were carried out on power transmission line porcelain insulators under AC voltages at different pollution conditions and corresponding leakage current patterns were measured. Discrete wavelet transform technique is employed to extract important features of leakage current signals. Variation of leakage current magnitude and distortion ratio at different pollution levels were analyzed. Fuzzy c-means algorithm is used to cluster the extracted features of the leakage current data. Test results clearly show that the flashover and pollution severity of power transmission line insulators can be effectively realized through fuzzy clustering technique and it will be useful to carry out preventive maintenance work.