• Title/Summary/Keyword: development delay

Search Result 1,310, Processing Time 0.281 seconds

Burn Delay Analysis of the Lunar Orbit Insertion for Korea Pathfinder Lunar Orbiter

  • Bae, Jonghee;Song, Young-Joo;Kim, Young-Rok;Kim, Bangyeop
    • Journal of Astronomy and Space Sciences
    • /
    • v.34 no.4
    • /
    • pp.281-288
    • /
    • 2017
  • The first Korea lunar orbiter, Korea Pathfinder Lunar Orbiter (KPLO), has been in development since 2016. After launch, the KPLO will execute several maneuvers to enter into the lunar mission orbit, and will then perform lunar science missions for one year. Among these maneuvers, the lunar orbit insertion (LOI) is the most critical maneuver because the KPLO will experience an extreme velocity change in the presence of the Moon's gravitational pull. However, the lunar orbiter may have a delayed LOI burn during operation due to hardware limitations and telemetry delays. This delayed burn could occur in different captured lunar orbits; in the worst case, the KPLO could fly away from the Moon. Therefore, in this study, the burn delay for the first LOI maneuver is analyzed to successfully enter the desired lunar orbit. Numerical simulations are performed to evaluate the difference between the desired and delayed lunar orbits due to a burn delay in the LOI maneuver. Based on this analysis, critical factors in the LOI maneuver, the periselene altitude and orbit period, are significantly changed and an additional delta-V in the second LOI maneuver is required as the delay burn interval increases to 10 min from the planned maneuver epoch.

Development of Non-Electric and Delay-Type Explosive Bolt (비전기식 지연형 폭발볼트 개발)

  • Lee YeungJo;Kim DongJin
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.9 no.3
    • /
    • pp.60-65
    • /
    • 2005
  • The present work has developed non-electric and delay-type explosive bolt that does not need electric power supply device and has the delay function in the operation. Non-electric power supply system enables separation device system to be minimized. In order to prove the mechanism of the operation, the power of air resistance caused from aviation object used to ignite the initiator. we can be founded from the present work that the changes in the operation load influence directly the ignition of the initiator. The design of non-electric and delay type of explosive bolt is the most suitable for the separation system that is necessary to reduce the velocity of aviation object and safe landing of parachute system.

Function Development for Apportioning System of Responsible Number of Days by Construction Delay (공기지연에 따른 책임일수 산정 시스템 구축방안)

  • Kang, Leen-Seok;Kwon, Jung-Hui;Park, Seo-Young;Yun, Seon-Mi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.805-808
    • /
    • 2007
  • Recently there are many contract claims, which are caused by duration delay, in construction industry. Many kinds of research for solving such duration delay problem are being progressed and an effective computerized system needs to improve it. This study suggests an improved methodology and necessary functions to make a time impact analysis system. This results will be useful for quantifying responsible number of days caused by duration delay.

  • PDF

Effect of 1-MCP and Temperature on the Quality of Red-fleshed Kiwifruit (Actinidia chinensis)

  • Kwanhong, Prangthong;Lim, Byung-Seon;Lee, Jin-Su;Park, Hee-Ju;Choi, Mi-Hee
    • Horticultural Science & Technology
    • /
    • v.35 no.2
    • /
    • pp.199-209
    • /
    • 2017
  • This study detailed the effects of 1-methylcyclopropene (1-MCP) on ripening and fruit quality in red-fleshed kiwifruit (Actinidia chinensis) stored at 0 or $10^{\circ}C$ for 20 days, and $20^{\circ}C$ for 13 days. The quality of the fruit was assessed by measuring ethylene production, respiration rate, weight loss, firmness, flesh color, soluble solids content (SSC), and titratable acidity (TA), along with a sensory evaluation. Compared to untreated kiwifruit, fruit treated with $1{\mu}L{\cdot}L^{-1}$ 1-MCP for 24h at $20^{\circ}C$ prior to storage showed a delay in ripening and maintained fruit quality during storage. Ethylene production and respiration rate were affected by 1-MCP treatment only in fruit stored at $20^{\circ}C$, where the values were markedly higher compared to kiwifruit stored at 0 and $10^{\circ}C$. 1-MCP treatment resulted in a clear reduction in weight loss due to a delay in fruit ripening. The firmness of kiwifruit stored at 10 and $20^{\circ}C$ decreased significantly compared to fruit stored at $0^{\circ}C$, but 1-MCP treatment led to a reduction in this loss. Upon storage, SSC increased while TA decreased across all treatments. Sensory evaluation scores increased with decreasing firmness and acidity and increasing SSC. The shelf life of kiwifruit stored at $0^{\circ}C$ was extended without any chilling injury or color changes. In summary, the results show that 1-MCP treatment can potentially maintain quality and delay ripening of red-fleshed kiwifruit stored at all storage temperatures.

Teratological Study of LBD-001, a Recombinant Human Interferon $\gamma$, in Rats

  • Cho, Sung-Ig;Lee, Eun-Bang
    • Biomolecules & Therapeutics
    • /
    • v.4 no.4
    • /
    • pp.301-309
    • /
    • 1996
  • LBD-001, a recombinant human interferon ${\gamma}$ produced by genetically engineered yeast as a host system, was intravenously administered to pregnant female rats (Sprague-Dawley) from day 7 to 17 of gestation at dose levels of 0.35$\times$10$^{6}$ , 0.69$\times$10$^{6}$ , and 1.38$\times$10$^{6}$ I.U./kg/day. As the control groups, hydrocortisone sodium succinate (5 or 10 mg/kg/day) was also similarly administered. Teratological effects of the test agents on fetuses and development of offsprings (F1 rats) were investigated. (1) No significant changes by the treatment of LBD-001 were observed in body weight, food and water consumption, feeding and nursing behaviors, and autopsy of pregnant or lactating mother rats. However, in hydrocortisone sodium succinate (10 mg/kg/day)-treated group, significant decreases of body weight on day 16, 18, and 20 of gestation and food consumption on day 20 of gestation and outstanding atrophy of thymus and adrenals were observed in two rats autopsied on day 20 of gestation. (2) No significant changes in resorption rate, skeletal or visceral development of fetuses, and physical or sensory development of offsprings (Fl) by the treatment of LBD-001 were detected. In hydrocortisone sodium succinate (10 mg/kg/day)-treated group, however, there were significant decreases of body weight of fetuses, delay of ossification, temporary delay of body weights of offsprings (F1) on day 1 and 3 of lactation, and increased tendency of stillborn rate and malformation rate of bone. The results show that LBD-001 at the dose of 1.38$\times$10$^{6}$ I.U./kg/day or less is not teratogenic in organogenesis of fetuses and the development of offsprings (F1). Meanwhile, hydrocortisone sodium succinate (10 mg/kg/day) seems to delay ossification of fetuses and temporarily retard the development of offsprings (Fl).

  • PDF

Characteristic Analysis of Cognitive and Motor Development in Children With Developmental Delay (발달지연 아동의 인지발달과 운동발달의 양태분석)

  • Kim, Ji-Sun;Kim, Tae-Hyeon;Choi, Yun-Jung;Han, Youn-Kyo;Jung, Han-Young
    • Physical Therapy Korea
    • /
    • v.12 no.3
    • /
    • pp.31-38
    • /
    • 2005
  • The purpose of this study was to investigate the characteristics of cognitive development and motor development in children with developmental delays. Subjects were 43 children with a mean corrected age of 19.19 month (SD=7.48). The Gross Motor Function Measure (GMFM) and the Bayley Scale of Infant Development-second edition (BSID-II) were administered to the total children. Statistical analysis was done by paired t-test and Pearson correlation, using SPSS software. The results were as follows: 1) Most of the children with developmental delays showed statistical delays on the mental scale rather than on the motor scale. 2) The correlation coefficients of cognitive performance and motor performance were ranged between r=.38 and r=.83 in children with developmental delays. 3) Lower motor performance showed significant association with lower cognitive score. The findings suggest that cognitive and motor performance in children with developmental delays was significantly correlated.

  • PDF

Development of Shock Wave Delay Estimation Model for Mixed Traffic at Unsaturated Signalized Intersection (충격파를 이용한 신호교차로 지체산정 모형 개발 (비포화 2차로 신호교차로 상에서의 버스혼합교통류 지체산정모형))

  • Kim, Won-Gyu;Kim, Byeong-Jong;Park, Myeong-Gyu
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.6
    • /
    • pp.75-84
    • /
    • 2010
  • Controlled traffic intersection is critical point in terms of transportation network performance, where the most of traffic congestion arises. One of the most important and favorable measure of effectiveness in the signal controlled intersection is approach delay. Although lots of efforts to develop traffic delay estimation models have been made throughout the years, most of them were focusing on homogeneous traffic flow. The purpose of this research is to develop a traffic delay estimation model for traffic flow mixed with bus based on the horizontal shockwave theory. Traffic simulation is performed to test the adaptation level of the model in generic environment. The result shows that the delay increases with increasing bus traffic. Overall model accuracy comparing simulation result is acceptable, that shows the error range around 10 percent.

What Factors Make the Delay of the Information System Project Implementation? (무엇이 정보시스템 프로젝트 일정을 지연시키는가?)

  • Seoung, Byung Ook;Park, Sang Cheol;Koh, Joon
    • Knowledge Management Research
    • /
    • v.22 no.1
    • /
    • pp.1-19
    • /
    • 2021
  • Large-scaled hospital information system projects are often delayed than originally planned. Regarding project management, it is necessary to examine main factors triggering the schedule delay and to analyze the causality of such delay. This study tries to find the delay factors and causal relationship between them based on the case of the hospital information system development project by using the grounded theory method. It turned out that 'unrealistic scheduling' affects overall schedule delays like domino phenomenon, and 'poor analysis of existing systems' leads to poor quality of work analysis while 'poor subsystem integrated interface' triggers poor design quality. This study found out the factors affecting the delay of a project, analyzing cause-and-effect relationships between them in the academic side. From the practical view, it shows a solution to minimize delays in the project schedule for each of SI companies, hospitals and project managers.

Development of Optimization Model for Traffic Signal Timing in Grid Networks (네트워크형 가로망의 교통신호제어 최적화 모형개발)

  • 김영찬;유충식
    • Journal of Korean Society of Transportation
    • /
    • v.18 no.1
    • /
    • pp.87-97
    • /
    • 2000
  • Signal optimization model is divided bandwidth-maximizing model and delay-minimizing model. Bandwidth-maximizing model express model formulation as MILP(Mixed Integer Linear Programming) and delay-minimizing model like TRANSYT-7F use "hill climbing" a1gorithm to optimize signal times. This study Proposed optimization model using genetic algorithm one of evolution algorithm breaking from existing optimization model This Proposed model were tested by several scenarios and evaluated through NETSIM with TRANSYT-7F\`s outputs. The result showed capability that can obtain superior solution.

  • PDF