Pavement Maintenance System Through using the Permutation Algorithm (순열알고리즘을 이용한 도로포장의 유지보수)

  • Jang-Rak, Kim;Sang-Yum, Lee;Sungho, Mun
    • International Journal of Highway Engineering
    • /
    • v.16 no.5
    • /
    • pp.67-72
    • /
    • 2014
  • PURPOSES : This study focuses on conducting pavement rehabilitation for more deteriorated roads given a limited government budget. METHODS : Therefore, we apply a optimization programming model of the permutation algorithm used for rehabilitating more deteriorated pavement areas, which is subjected to the limited budget. RESULTS : The permutation algorithm was evaluated in terms of determining the maximized rehabilitation of deteriorated pavement areas, using the newly developed performance models such as fatigue cracking, rutting, international roughness index(IRI) through the surveying data from 2006 to 2012. When compared with a traditional model of the so-called worst-first sequence(WFS) method, the permutation algorithm worked better than the WFS method, resulting in covering more deteriorated pavement areas given the limited government budget. CONCLUSIONS : Through a case study, it could be concluded that the permutation algorithm provides more reliable results in terms of rehabilitating more deteriorated pavement areas given the limited budget.

Comparison of Performance of Non-Mill-and-Overlay and Mill-and-Overlay on Concrete Pavement (콘크리트 포장을 덧씌운 비절삭과 절삭 아스팔트 포장의 공용성 비교)

  • Choi, Mi Ran;Park, Hae Won;Jeong, Jin Hoon
    • International Journal of Highway Engineering
    • /
    • v.19 no.6
    • /
    • pp.97-103
    • /
    • 2017
  • PURPOSES : In this study, the pavement condition of non-mill-and-overlay and mill-and-overlay on deteriorated concrete pavement was compared. In addition, the suitable time to perform the initial overlay was investigated. METHODS : The condition of the pavement sections that were not additionally overlaid on non-mill-and-overlay or mill-and-overlay on deteriorated concrete pavements was investigated according to overlay pavement age. The condition of non-mill-and-overlay and mill-and-overlay sections of expressway route 25, which has more information on overlay history than other routes, was compared according to the number of times of overlay. The relation between the concrete pavement condition just before the overlay and the number of times of overlay was investigated for the non-mill-and-overlay and mill-and-overlay sections for which the first overlay was performed in the same year. RESULTS : The pavement condition of the non-mill-and-overlay sections was better than that of the mill-and-overlay sections, showing higher Highway Pavement Condition Index(HPCI) regardless of overlay pavement age. The number of reflection crackings of the non-mill-and-overlay sections was smaller than that of the mill-and-overlay sections. As a result of observing the cores obtained from the overlay sections, the proportion of the deteriorated non-mill-and-overlay sections was smaller than that of the mill-and-overlay sections. The SD measured just before the overlay on the concrete pavement for which additional overlay was not performed was smaller than that for which additional overlay was performed regardless of the milling of the concrete slab surface. The HPCI of the concrete pavement for which overlay was performed just once was higher than that for which overlay was performed more than one time. CONCLUSIONS : Accordingly, it was concluded that the condition of the non-mill-and-overlay sections was better than that of the mill-and-overlay sections. In addition, the better the condition of concrete pavement just before the initial overlay, the longer the duration of the overlay effect.

Case Studies of the Life Cycle Cost Analysis for Rehabilitation of Deteriorated Expressway Concrete Pavements (고속도로 노후 콘크리트 포장 보강의 경제성 분석 사례 연구)

  • Suh, Young-Chan;Park, Ji-Won;Kim, Chan-Woo
    • International Journal of Highway Engineering
    • /
    • v.18 no.3
    • /
    • pp.33-45
    • /
    • 2016
  • PURPOSES : Concrete pavement has been used in the construction of the Jungbu expressway in 1987. More than 60% of the pavement on the expressway is currently made of concrete, but most has been used far beyond their design life. Pavement life has been extended through routine maintenance or overlay. However, the structural capacity of the pavement has reached its limit, and extensive rehabilitation/reconstruction with long time traffic blocking should be considered. The three following issues on concrete rehabilitation/reconstruction will be discussed: (1) economic comparison of asphalt inlay and asphalt overlay, (2) economic comparison preventive overlay on a section which is currently good and routine overlay on the section which will be poor, and (3) economic analysis of early-strength concrete when it is used in concrete reconstruction. METHODS : First, various life cycle cost analysis tools were compared, and the proper tool for the extensive rehabilitation/reconstruction was selected. Second, a sensitivity analysis of the selected tool was performed to find the influential input variables, which should be carefully selected in the analysis. Third, three case studies, which can be issues in the rehabilitation/reconstruction of the expressway concrete pavement in Korea, were performed. RESULTS : Asphalt overlay without milling the deteriorated concrete showed 18~25% lower life cycle cost than the current asphalt inlay with milling. The good current preventive overlay on the section was economically justified within the scope of this study. The construction cost limit of the early strength concrete was suggested to be economical for 1, 3, and 7 days of construction alternative opening. CONCLUSIONS : CA4PRS was a viable tool for comparing various rehabilitation/reconstruction issue alternatives. Several concrete issues associated with the rehabilitation/reconstruction of the deteriorated concrete pavement were discussed as mentioned above.

Re-Repair Method for Deterioration of Partial Depth Repair Section in Portland Cement Concrete Pavement (콘크리트 포장 부분단면보수 재파손 구간의 적정 보수 방안)

  • Lee, Yong Hyeon;Kim, Hyun Seok;Jung, Won Kyong;Oh, Han Jin;Kim, Hyung Bae
    • International Journal of Highway Engineering
    • /
    • v.19 no.5
    • /
    • pp.33-42
    • /
    • 2017
  • PURPOSES : The purpose of this study is to suggest the construction and quality control method for the re-repair of a deteriorated partial depth repair for sections of Portland cement concrete pavement. METHODS : An experimental construction was conducted to extend the repair width for removing an existing repair section. A removal method was used to ensure early performance for a deteriorated partial depth repair section. Bond strength and split tensile strength were measured at the near vertical interface layer between the existing pavement and repair material. The area was analyzed for various conditions such as the extended repair area and the removing method of the existing repair section. RESULTS : As a result of analysis of bond strength and split tensile strength, the bonding performance of a milling removed section was improved over a cutting and hand breaker removed section. The bond strength was analyzed to increase slightly as the extended repair width for removing the existing repair section increased. The split tensile strength did not show a clear relationship to an increased extended repair width of an existing removed repair section. CONCLUSIONS : The milling removal method should be applied in the removal of existing deteriorated partial depth repair sections. The extended repair width for a re-repair section should be wider than the existing partial depth repair with at least a 75-mm length and width for the bond strength and the split tensile strength.

Development of Rehabilitation Criteria of National Highway Pavement (국도 아스팔트 콘크리트 포장의 보수공법 결정 기준 연구)

  • Kim, Da-Hae;Kwon, Soo-Ahn;Suh, Young-Chan;Lim, Kwang-Soo
    • International Journal of Highway Engineering
    • /
    • v.11 no.2
    • /
    • pp.37-44
    • /
    • 2009
  • Currently the reasonability of threshold values for rutting and cracking does not clearly defined at the Pavement Rehabilitation Decision Tree on national highway PMS(Pavement Management System). The goal of this study is to provide the reasonable threshold values for the national highway asphalt concrete pavement rehabilitation. To achieve this goal, test section that represents typical asphalt concrete pavement of national highway was selected and pavement export were participated. Pavement condition survey has been conducted and pavement performance data at the selected roadway section were analyzed. From this study, reasonable threshold values of Pavement Rehabilitation Decision Tree were suggested based on the pavement expert's engineering judgement. In terms of crack repairs, the application of overlay after cutting is required to deteriorated area where existing crack ratio is over 35% and just overlay is required to where crack ratio is over 20%. On rutting, rut depth over 13mm is required to overlay after cutting and rut depth over 10mm is just needed to overlay.

  • PDF

Finite Element Analysis of Heat Transfer Effects on Asphalt Pavement Heated by Pre-Heater Unit Used in Hot In-Place Recycling (유한요소해석을 통한 현장 가열 재활용 시공 장비의 가열판 용량에 따른 아스팔트 포장의 열전도성 평가)

  • Lee, Kang Hun;Lim, Jin Sun;Jeong, Kyu Dong;Im, Jeong Hyuk;Kwon, Soo Ahn;Kim, Yong Joo
    • International Journal of Highway Engineering
    • /
    • v.18 no.2
    • /
    • pp.73-82
    • /
    • 2016
  • PURPOSES: The national highways and expressways in Korea constitute a total length of 17,951 km. Of this total length of pavement, the asphalt pavement has significantly deteriorated, having been in service for over 10 years. Currently, hot in-place recycling (HIR) is used as the rehabilitation method for the distressed asphalt pavement. The deteriorated pavement becomes over-heated, however, owing to uncontrolled heating capacity during the pre-heating process of HIR in the field. METHODS: In order to determine the appropriate heating method and capacity of the pre-heater at the HIR process, the heating temperature of asphalt pavement is numerically simulated with the finite element software ABAQUS. Furthermore, the heating transfer effects are simulated in order to determine the inner temperature as a function of the heating system (IR and wire). This temperature is ascertained at $300^{\circ}C$, $400^{\circ}C$, $500^{\circ}C$, $600^{\circ}C$, $700^{\circ}C$, and $800^{\circ}C$ from a slab asphalt specimen prepared in the laboratory. The inner temperature of this specimen is measured at the surface and five different depths (1 cm, 2 cm, 3 cm, 4 cm, and 5 cm) by using a data logger. RESULTS: The numerical simulation results of the asphalt pavement heating temperature indicate that this temperature is extremely sensitive to increases in the heating temperature. Moreover, after 10 min of heating, the pavement temperature is 36%~38% and 8%~10% of the target temperature at depths of 25 mm and 50 mm, respectively, from the surface. Therefore, in order to achieve the target temperature at a depth of 50 mm in the slab asphalt specimen, greater heating is required of the IR system compared to that of the gas. CONCLUSIONS : Numerical simulation, via the finite element method, can be readily used to analyze the appropriate heating method and theoretical basis of the HIR method. The IR system would provide the best heating method and capacity of HIR heating processes in the field.

The Estimation of Durability Factor of Deteriorated Jointed Concrete Pavement Using Image Analysis Test (화상분석 실험을 이용한 열화된 줄눈콘크리트 포장의 내구성 지수 평가)

  • Choi, Pan-Gil;Kim, Yong-Gon;Yun, Kyong-Ku;Kwon, Soo-Ahn
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.5
    • /
    • pp.31-38
    • /
    • 2009
  • The primary objective of this study was to estimate the deterioration degree of jointed concrete pavement which was major concrete pavement type in Korea. First of all, visual survey of concrete pavement was performed to observe deterioration types. In the result of visual survey, the majority of concrete pavement deterioration was investigated in joint area. It is appeared that most of the distresses are durability cracking and joint distress. Second, concrete core specimens were taken from eight locations including good section (4 locations) and bad section (4 locations) based on visual survey. The deterioration reasons of concrete pavement were analyzed with ultrasonic pulse velocity test, splitting tensile strength test, and image analysis for concrete core specimens. Among the image analysis test result for 21 concrete core specimens, only two specimens satisfied the Kansas DOT criteria of spacing factor, $250\;{\mu}m$, and the remains of 19 specimens were estimated to be above $250\;{\mu}m$. The durability factor of concrete was estimated very low. As a result, it was analyzed that the main deterioration reason of the deteriorated jointed concrete pavement was to be freezing and thawing damages.

Performance Evaluation of Long-Life Asphalt Concrete Overlays Based on Field Survey Monitoring in National Highways (일반국도 현장조사 모니터링을 통한 장수명 아스팔트 덧씌우기 포장의 공용성 분석)

  • Baek, Jongeun;Lim, Jae Kyu;Kwon, Soo Ahn;Kwon, Byung Yoon
    • International Journal of Highway Engineering
    • /
    • v.17 no.3
    • /
    • pp.69-76
    • /
    • 2015
  • PURPOSES : Performance evaluation of four types of asphalt concrete overlays for deteriorated national highways. METHODS : Pavement distress surveys for crack rate and rut depth have been conducted annually using an automated pavement survey vehicle since 2007. Linear and non-linear performance prediction models of the asphalt concrete overlays were developed for 43 sections. The service life of the asphalt overlays was defined as the number of years after which a crack rate of 30% or rut depth of 15mm is observed. RESULTS : The service life of the asphalt overlays was estimated as 17.4 years on an average. In 90.7% of the sections, the service life of the overlays was 15 years or more which is 1.5 times the life of conventional asphalt concrete overlays used in national highways. The performance of the overlays was dependent on the type of asphalt mixture, traffic volume levels, and environmental conditions. CONCLUSIONS : The usage of stone mastic asphalt (SMA) and polymer-modified asphalt (PMA) for the overlays provided good resistance to cracking and rutting development. It is recommended that appropriate asphalt concrete overlays must be applied depending on the type of existing pavement distress.

Rehabilitation of Concrete Pavement with VES-LMC overlay (VES-LMC 덧씌우기를 이용한 콘크리트 포장 보수)

  • Jeong, Won-Kyong;Kim, Yong-Gon;Kim, Ki-Hyun;Yun, Kyong-Ku
    • Journal of Industrial Technology
    • /
    • v.25 no.B
    • /
    • pp.3-10
    • /
    • 2005
  • Since in 1970, the length of concrete pavements(JCP, JRCP and CRCP) are growing rapidly at both of main highways and local roads. Many of them are deteriorated and old enough to be repaired or replaced. The pavement is more important than the other infrastructures and it is very difficult to go around or block the traffic during the rehabilitation. The very-early strength latex-modified concrete(VES-LMC)may offer the advantages of high-early-strength, higher flexural strength, higher bond strength, and improved durability. The VES-LMC could be used at a kind of fast track ofr early opening to the traffic after 3 hours of concrete placement. The installation of VES-LMC overlay at Jung-Boo highway was successfully done from April 28 to 29, 2005. The traffic was closed at 07:00 PM and opened to traffic at 08:30 AM. The compressive and flexural strength of VES-MC were more than 28MPa, 6.2MPa after 4 hours, respectively.

  • PDF

Air-void Analysis of Deteriorated Jointed Concrete Pavement Using Concrete Core Specimen (코어 시편을 이용한 열화된 줄눈콘크리트 포장의 공극구조 분석)

  • Choi, Pan-Gil;Jeong, Beom-Seok;Yun, Kyong-Ku;Kwan, Soo-Ahn
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.253-254
    • /
    • 2009
  • This study was conducted to estimate deterioration reason of jointed concrete pavement. Image analysis tests were performed according to ASTM C 457 using concrete core specimens. Durability factors were estimated according to spacing factor, which is related with air content and air-void information. Test results show that spacing factors of most specimens were estimated above 250$\mu$m so that investigated concrete pavement has the problem of freeze and thawing resistance.