A Study on the Possibility of Initial Cost Saving in the New Housing Model Considering Long-life and Constructability - Focused on the Case Analysis with Converting Skeleton and Cladding to New Systems - (장수명화와 시공성을 고려한 새로운 공동주택 모델의 초기 비용절감 가능성 연구 - 구조체와 외장전환 사례분석을 중심으로 -)

  • Kim, Soo-Am;Shin, Sung-Eun;Chung, Joon-Soo;Shon, Young-Jin
    • Journal of the Korean housing association
    • /
    • v.23 no.6
    • /
    • pp.49-59
    • /
    • 2012
  • This study suggested a new model in consideration of long life and constructability of apartment house suggested in the former part. New model suggested the possibility of cost saving based on the idea that people trend to reject because of the recognition that the new model would cost a lot of expense which work as the barrier for the expansion and distribution at the local market so as to prepare the ground for its activation. The Study was aimed at verifying the possibility of cost saving through comparing it with the existing standard apartment house system centered on the skeleton and cladding system among the new structural design models suggested in the former part. Assuming that these existing standard both models should be changed structural design into new model system, the quantity volume, cost and construction period along with the alteration of finished materials between two models were compared altogether. Simultaneously BIM library was built for easy taking-off bill of quantity and consideration of working methodology for construction working cycle, which was translated into construction cost so as to derive the cost of the two subject systems to be counted. Through the analysis, it was concluded that new model would secure variability in the future and constructability along with shortening the construction period (29%) and achieve cost saving (13%) of construction against the those of existing model.

Investigating Structural Stability and Constructability of Buildings Relative to the Lap Splice Position of Reinforcing Bars

  • Widjaja, Daniel Darma;Rachmawati, Titi Sari Nurul;Kwon, Keehoon;Kim, Sunkuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.3
    • /
    • pp.315-326
    • /
    • 2023
  • The design principles and implementation of rebar lap splice in architectural structures are governed by building regulations. Nevertheless, the minimization of rebar-cutting waste (RCW) is often impeded by the mandatory requirements pertaining to the rebar lapping zone as prescribed in design codes. In real-world construction scenarios, compliance with these rules often falls short due to hurdles concerning productivity, quality, safety, time, and cost. This discrepancy between code stipulations and on-the-ground construction practices necessitates an academic exploration. The goal of this research was to delve into the effect of rebar lap splice placement on the robustness and constructability of building edifices. The study initially took on a review of the computation of rebar lapping length and the rules revolving around the lapping zone. Following this, a structural robustness and constructability examination was undertaken, focusing on adherence to the lap splice zone. The interpretations and deductions of the research led to the following insights: (1) the efficacy of rebar lap splice is not solely contingent on the moment, and (2) the implementation of rebar lap splice beyond the specified zone can match the structural integrity and robustness of those confined within the designated area. As a result, the constraints on the rebar lapping zone ought to be revisited and possibly relaxed. The conclusions drawn from this research are anticipated to reconcile the disconnect between building codes and practical construction conditions, furnishing invaluable academic substantiation to further the endeavor of achieving near-zero RCW.

Identifying Construction Engineering Tasks at the Design Phase for Enhancing Constructability in High-rise Building Construction - Focused on Temporary Work - (고층 건축공사의 시공성 향상을 위한 설계단계의 시공엔지니어링 업무 도출 - 가설공사를 중심으로 -)

  • Lee, Jin-Woong;Cho, Kyu-Man;Kim, Tae-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.453-463
    • /
    • 2017
  • Due to the increase in the size of buildings and scale, the importance of construction engineering that reflects the constructability from the design stage of the project is increasing. Especially, engineering efforts related to facilities, equipment and construction methods for temporary work at the design stage can significantly contribute to improvement of constructability and project performance. The purpose of this study is to derive construction engineering tasks on temporary work at the design phase of the high-rise building projects. 27 preliminary tasks were firstly investigated through literature review and experts' group interview, and the necessity and importance analysis of each tasks were then performed based on questionnaire survey. Most of the tasks related to plans on structural framework and lifting equipment were analyzed as relatively more important ones. Lastly, 21 engineering tasks, which are classified into 5 factors, were proposed through factor analysis. The factors were determined as 1) structural framework, measurement and circulation, 2) lifting equipment and pumping, 3) space zoning, 4) water supply, 5) temporary facility, electric power supply and lighting. The results of this study can be used as basic data for establishing efficient work process of construction engineering on temporary work at the design phase.

Improvement of Constructability of Coping by Reduction of Reinforcement Amount (철근량 저감을 통한 코핑부 시공성 향상)

  • Park, Bong-Sik;Park, Sung-Hyun;Cho, Jae-Yeol
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1577-1582
    • /
    • 2011
  • Recently rapid construction of bridge is a main interest in construction. A research on rapid construction of pier coping is urgently needed because pier, which is a bridge understructure, directly affect lane reduction and increase of social cost. Precast assembly method and pre-assembly method are the main subjects of rapid construction. But these researches have focused not on reduction of reinforcement amount, but on modifying production method of coping. Reinforcement amount of design specification is as much as that of coping under constructing. So different approach is needed for reduction of reinforcement amount. In this paper, design of pier coping using strut-tie model was proposed for reduction of reinforcement amount and improvement of constructability. Railway bridge pier coping under constructing was analyzed using a finite element method and designed using strut-tie model.

  • PDF

BIM based Design Optimization and Constructability Improvement for Adoption of Pre-construction Service. (프리컨스트럭션 서비스 도입을 위한 BIM 기반 설계 최적화 및 시공성 검토)

  • Lee, Chang-Hee;Lee, Jeong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.187-188
    • /
    • 2017
  • Korean government is trying to adopt 'CM at Risk(CMR)' method to solve some problems of traditional project delivery method such as cost increase, delay, low quality. Pre-construction service(PCS) is a project management methodology of CMR and BIM is the best tool for efficient PCS execution. PCS is consisted of several main items such as Target costing, Cost trending, GMP, Design optimization, Constructability review and Productivity. The purpose of this research is to analyse contractor's PCS application case result and to find improvement items.

  • PDF

3D Digital Design Optimization Process Considering Constructability of Freeform Structure (비정형 구조물의 시공성을 고려한 3차원 디지털 설계 최적화 프로세스)

  • Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.35-43
    • /
    • 2013
  • Nowadays the widely used media in architecture include visualizations, animations and three-dimensional models. 3D digital methods using active CAM(Computer Aided Manufacturing) and CNC(Computerized Numerical Control) imaging have been developed for accurate shape and 3D measurements in freeform buildings. In contrast to a conventional building using auto CAD system and others, the proposed digital optimization method is based on a combination of 3D numerical data and parametric 3D model for design and construction. The objective of this paper is therefore to present digital optimization process for constructability of freeform building. The method can be useful in the effective implementation of an error-proofing process of freeform building during design and construction phase. 3D digital coordinate data can be used effectively to identify correct size of structural and finish members and installation location of each members in construction field. In addition, architects, engineers and contractors can evaluate design, materials, constructability and identify error-proofing opportunities. Other project participants can also include representatives from all levels of management, departments as well as workers and key subcontractors' personnel, if necessary. The 3D digital optimization process is therefore appropriate to serious variations in freeform shape. For future study, the developed digital optimization method is necessary to be carried out to verify the robustness and accuracy for constructability in construction field.

Design Program and Economic Evaluation for Hollow RC Bridge Columns with Reinforcement Details for Material Quantity Reduction (물량저감 중공 철근콘크리트 교각의 설계프로그램과 경제성 평가)

  • Kim, Tae-Hoon;Son, Yun-Ki;Yang, Nam-Seok;Lee, Seung-Hoon
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.5
    • /
    • pp.403-412
    • /
    • 2014
  • This paper presents special-purpose design program and plastic design results for hollow RC bridge columns with reinforcement details for material quantity reduction. The developed reinforcement details has economic feasibility and rationality and makes construction periods shorter. This study documents the economic evaluation of hollow reinforced concrete bridge column systems with reinforcement details for material quantity reduction and presents conclusions based on the application findings. As a result, the proposed reinforcement details for material quantity reduction were designed prior to the existing reinforcement details in terms of structural rationality, constructability, and economic.

Evaluation of Structural Behavior of Connections in Precast Arch Structures (프리캐스트 아치구조의 이음부 구조 거동 평가)

  • Shim, Chang Su;Kim, Dong Chan;Choi, Dae;Jin, Kyung Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.747-756
    • /
    • 2016
  • In this paper, a connection details for precast arch structures was proposed. Experiments were performed to evaluate structural performance of the loop connection details satisfying current design requirements and of alternative details for improvement of constructability. Precast arch specimens considering the current design requirements showed higher structural capacity than a cast-in-place arch specimen. Crack width at the connection of arch crown showed smaller value than 0.2 mm due to increased compression force by the applied vertical load. Strengthening by wire-mesh at notch area of the connection improved initial crack control capability. Connection detail with couplers and headed bars showed similar capacity to the reference specimen. The alternative details to improve constructability of reinforcements can be used without decreasing structural performance. Specimens with smaller internal diameter of mandrel and shorter loop splicing than the current design codes showed worse behavior in terms of crack width control.

A Study on Controlling the Negative Reaction of Cable Stayed Bridge Considering Constructability and Economy : Vam Cong Cable Stayed Bridge in Vietnam (시공성 및 경제성을 고려한 사장교 부반력 제어 연구 : 베트남 밤콩 사장교 사례)

  • Lee, Yong-Jin;Lho, Byeong-Cheol;Kim, Chang-Kyo;Bae, Sang-Woon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.5
    • /
    • pp.87-95
    • /
    • 2014
  • Cable stayed bridge is supported by cables and the negative reaction occurs by cables at anchor pier. To solve this problem, the proper side span ratio and the negative reaction measure of anchor pier are needed. And structural system of cable stayed bridge is determined by solution of the negative reaction as installation of the intermediate pier, counterweight and so on. In feasibility study, Vam Cong bridge was planned as 5 span cable stayed bridge. However, it was changed to 3 span cable stayed bridge in detailed design because of constructability and economy. The intermediate pier was excluded in order to improve the constructability, and side span ratio increased to control the negative reaction. As a result, Vam Cong bridge secure constructability, structural safety, and efficiency.

The Optimal Design of a PC System in HIBRAND (PC공법을 이용한 최적의 구조설계)

  • Kim, Jong-Soo;Park, Hyung-Suk;Choi, Dong-Sub
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.298-301
    • /
    • 2006
  • The HIBRAND located in Yangjaedong, Seochogu, Seoul is a large complex shopping center of total space 48,000 p'yongs which consists of a nineteen-story business facility and a six-story sale facility. In the case of a big construction work in the downtown, they are suffered much difficulty by construction period and working space lack. They, however, can satisfy construction period, constructability and quality using a PC system in HIBRAND. Also, we maximized the advantage of each material being the abreast of a RC and steel structure method partially and devised a reasonable copula. A PC system with advantages of construction period, constructability and quality assurance should be actively practiced to big downtown construction work.