• 제목/요약/키워드: demolition work

검색결과 95건 처리시간 0.019초

건축물 해체공사의 안전교육시스템 개선방안 (Improvement Plan of Safety Educational System for Construction Demolition Works)

  • 최종수;김경환;차헌주
    • 한국안전학회지
    • /
    • 제22권5호
    • /
    • pp.57-64
    • /
    • 2007
  • In the field of domestic construction demolition works, work process management system is left behind compared with that of several advanced countries such as US, Japan and UK. Especially, the problems regarding safety management are more serious in terms of the availability of safety manuals and law system. The analysis results fiom the questionnaire survey and interviews with demolition engineers indicated that current safety management practices in demolition works lack systematic approach and inappropriate in securing labors' safe working environment. In addition, field labors and managers strongly requested the improvement of safety educational system. Grounded upon the analyses results and investigations, suggestions were drawn for the establishment of advanced safety educational system.

해체공사의 수행실태 및 공동주택 분별해체 시험시공 (The Actual State of Demolition and Pilot Dismantling in Apartment Building)

  • 김효진;손정락;박성식;윤영상
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 춘계학술논문 발표대회
    • /
    • pp.113-118
    • /
    • 2007
  • Now a performance process of Demolition works is 'Before-Removal & After-Classification' method in Korea. This method is short of demolition time, but construction wastes contained substances lower recycling rate of construction, raise expenses of reclamation & treatment. Then the government has decided upon a positive 'Before-Classification & After-Removal' method, and substantially raise a recycling rate of construction wastes. Therefore, this study makes an investigation into state of internal and external demolition field through evaluating technological level, we make a proposal of dismantling method from there. Also, we put dismantling to the test in an apartment by proposed work process. As the result, it made a term of works increased for removing interior material. To solve this problem, we need to develop tools and methods of construction that can remove efficiently. From now on, we continuously need to study a breakdown system of dismantling, analysis of dismantling process and general system by inspecting entire demolition process. And we have to study details for making a specific thesis of method of removing interior material which was based on developing a suitable partial demolition machine and dismantling works.

  • PDF

물의 주거로서 더 갤러리 카사 델 아구아에 구현된 리카르도 레고레타의 건축언어 (The Architectural Languages of Ricardo Legorreta in the Gallery of Casa del Agua as Dwelling of Water)

  • 김형준
    • 한국주거학회논문집
    • /
    • 제25권2호
    • /
    • pp.37-44
    • /
    • 2014
  • The Gallery of Casa del Agua in Jeju Island was demolished by Jeju local government on March 6 in the last year. In the meanwhile, a lot of people including the architectural field had denied the demolition. Regardless of sustained efforts in order that the building could be preserved as a work, Jeju government ended up with demolishing the gallery. The Gallery of Casa del Agua was a temporary building constructed as a model house of Casa del Agua. As the remaining period of the temporary building had passed, it was on the verge of demolition by Jeju government. Casa del Agua is 'dwelling of water' in Korean, and the building was the last posthumous work of Mexican architect Ricardo Legorreta. Knowing from the expression of 'dwelling of water', this house is a dwelling work of him. Through this work, his architecture languages that he had pursued contained in dwelling could be looked into. This study examined the background and course of demolition of the Gallery of Casa del Agua, 'dwelling of water' and arranged problems in the course of demolition. Then, the fact that the Gallery of Casa del Agua as an architecture work of Ricardo Legorreta included his architecture languageswas analyzed. For this, his universalarchitecture languages were examined and how the architecture languages were applied to the Gallery of Casa del Agua was analyzed. As a result, it could be known that languages of composition and languages of emotion consistently shown in his works were represented in the Gallery of Casa del Agua.

대전 중앙데파트 발파해체 사례 (A Case Study of Blast Demolition at Chung-Ang Department Store in Daejeon City)

  • 민형동;박종호;송영석;박훈
    • 화약ㆍ발파
    • /
    • 제27권1호
    • /
    • pp.62-78
    • /
    • 2009
  • 최근 오래된 건축물의 재건축이나 도심재생, 자연 생태를 복원하기 위한 노력과 함께 빌딩 건축기술도 빠르게 발전하고 있어 노후화된 건축물에 대한 철거가 급증하고 있다. 건축물 철거공사 시에는 주변 환경에 피해를 주지 않고, 관련 법규를 준수하면서 수행되어야 하는데. 철거공법 중에는 여러 가지공법이 있으나 이중 발파해체 공법은 공사비용이나 안전 등을 고려할 때 가장 실용적인 철거공법이다. 본 논문은 대전천 생태 복원 사업 중의 일환으로 35년 전 대전천 상부에 복개 구조물로 건축된 중앙데파트를 철거하기 위해 발파해체 공법을 적용하여 철거를 수행한 사례이다. 본 구조물은 8층 건물로 높이는 지하층을 포함하여 총 41.6m이며, 건면적 $1,650m^2$, 연면적 $18,351m^2$ 이다. 주변에 상가 및 건물 등이 밀집한 대전시 중심에 위치하고 있으며, 주요시설물로는 대전 지하철(18m), 후면상가(20m), 지하상가(15m), 목척교와 은중교(0.25m) 및 광케이블(0.25m) 등이 있다. 본 porject는 복잡한 도심지인 점을 감안하여 발파해체 공법 중 내파공법으로 선정하였으며, 주요 시설물에 피해를 주지 않기 위하여 시뮬레이션 프로그램을 이용하여 사전에 구조물의 붕괴 거동을 검토한 후 시행되었다. 총 80kg의 폭약과 1,000발의 뇌관이 사용되었다. 본 프로젝트는 국내 도심지에서 내파공법을 적용하여 발파해체를 성공적으로 수행한 좋은 사례가 될 것이다.

AcciMap과 STAMP를 활용한 해체공사 붕괴사고 분석 (Analysis of Collapse Accidents in Demolition Work using AcciMap and STAMP)

  • 정현지;원정훈
    • 한국안전학회지
    • /
    • 제38권3호
    • /
    • pp.51-60
    • /
    • 2023
  • Investigation of the cause of the relatively recent building collapse accident in Gwangju revealed a lack of awareness about the safety of the dismantling construction system among stakeholders, in the form of issues such as illegal subcontracting, unauthorized design changes, and insufficient safety supervision. This study was conducted to analyze the safety interactions between the building dismantling construction system and the involved stakeholders and to propose ways to prevent accidents in related institutions and workplaces. AcciMap and STAMP-CAST analysis methods were used to evaluate safety interactions among the various stakeholders participating in building demolition work. Analysis results revealed that the collapse accident during the dismantling work was caused not only by structural causes occurring in the construction stage, but also by various causes throughout the system, such as the dismantling plan preparation stage and the construction permit stage. The results also revealed the need for proper implementation of safety control measures by various stakeholders to prevent collapse accidents during dismantling construction.

건축물 해체공사 전문인력을 위한 기본역량 분석 - 국내·외 사례를 중심으로 (Analysis of Basic Capabilities for Building Demolition Experts - Focused on Domestic and International Cases)

  • 이경구;신용섭;이형용;전재열
    • 한국건축시공학회지
    • /
    • 제23권6호
    • /
    • pp.841-849
    • /
    • 2023
  • 최근 건축물 해체공사 중 많은 사고가 발생함에 따라 건축물 해체에 대한 관심이 증가하고 있다. 이 연구에서는 국내와 국외의 사례를 통해 건축물 해체공사 전문인력에게 요구되는 기본역량을 분석하였다. 이를 위해 국내의 건축물 해체공사감리교육과 국가직무능력표준(NCS)의 구조물해체 직무의 능력단위에서 요구하는 능력을 조사하였고, 일본, 미국, 영국의 해체 공사 전문인력 자격시험 과목 및 관련 교육내용을 조사하였다. 연구결과, 해체공사 전문인력을 위한 요구역량을 법규, 구조, 안전, 계획, 운영, 시공, 환경의 7가지 분야로 분류하고, 기능직, 기술직, 관리직의 단계별로 분류할 필요성을 제안하였다.

해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발 (Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation)

  • 김효진;강인석;이동욱;김창학
    • 대한토목학회논문집
    • /
    • 제34권3호
    • /
    • pp.1007-1015
    • /
    • 2014
  • 지속가능한 발전을 추구하는 최근의 추세에서 해체산업은 자원의 재활용이나 재생측면에서 중요성이 더욱 커져가고 있다. 주택건립 및 기존주택현황을 고려할 때 해체시장의 규모는 계속 증가될 것으로 예측되고 있다. 그러나 국내에는 해체공사의 발주 및 입찰에 기본이 되는 내역기준이 매우 미비한 실정이고, 공사비를 산정하기 위한 전산시스템도 개발되어 있지 못하다. 따라서 본 연구에서는 분별해체에 대한 시험시공 자료를 분석하여 분별해체공사의 일위대가 산정에 도움 될 수 있는 품 21개 항목과 현재 해체공사에 가장 많이 활용되고 있는 1.0m3 급 압쇄장비의 작업능력을 제시한다. 해체공사의 원활한 공사비 견적을 위해 해체공사에 특화하여 단가정보, 단가관리, 표준일위대가관리, 일위대가표, 내역서 작성, 보고서 작성 시스템을 개발하였다. 공사비 견적 시스템은 기계식해체와 발파식해체에 공통 적용가능토록 구성하였다. 본 시스템의 가장 큰 특징은 표준 WBS를 활용하여 비용견적을 수행하는 것이다. WBS는 표준 일위대가표 및 표준 DB와 연계되어 견적에 경험이 없는 사용자도 견적작업을 수행할 수 있는 장점을 갖게 된다.

해체${\cdot}$신축용 가설울타리의 통합방안 (Integration of Temporary Fences for Demolition and Construction)

  • 신동성;전재만;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.258-261
    • /
    • 2003
  • 해체공사는 신축공사보다 위험하며 환경위해요인을 많이 야기시킨다. 그러나 해체공사현장에서 사용되는 가설울타리는 환경위해요인의 차단, 안정성과 작업공간확보의 역할을 하지 못한다. 단지 외부의 시선을 차단한 뿐이다. 이 연구는 가설울타리가 해체공사 초기에 설치될 수 있다는 가능성에서 시작하였다. 연구의 초기단계로 실제 가설울타리가 사용되는 실태를 파악하였으며 그 결과 가설울타리가 해체공사 이전에 설치할 수 있음을 알게 되었다. 이에 우리는 해체공사와 신축공사용 가설울타리의 통합을 실제화하는 데 주력하였다. 연구에 결과는 다음과 같다. .첫째, 통합에 제한요소를 파악해야 한다. 둘째, 건축공사 표준시방서의 보완이 필요하다. 셋째, 가설울타리의 훼손 및 변경에 대비해야한다. 마지막으로 가설울타리의 통한을 통해 환경위해요인 저감, 공사비 절감, 작업환경 개선, 해체공사의 이미지 제고를 기대할 수 있다.

  • PDF

Risk Assessment of Exposure to Silica Dust in Building Demolition Sites

  • Normohammadi, Mohammad;Kakooei, Hossein;Omidi, Leila;Yari, Saeed;Alimi, Rasul
    • Safety and Health at Work
    • /
    • 제7권3호
    • /
    • pp.251-255
    • /
    • 2016
  • Background: Building demolition can lead to emission of dust into the environment. Exposure to silica dust may be considered as an important hazard in these sites. The objectives of this research were to determine the amount of workers' exposure to crystalline silica dust and assess the relative risk of silicosis and the excess lifetime risk of mortality from lung cancer in demolition workers. Methods: Four sites in the Tehran megacity region were selected. Silica dust was collected using the National Institute for Occupational Safety and Health method 7601 and determined spectrophotometrically. The Mannetje et al and Rice et al models were chosen to examine the rate of silicosis-related mortality and the excess lifetime risk of mortality from lung cancer, respectively. Results: The amount of demolition workers' exposure was in the range of $0.085-0.185mg/m^3$. The range of relative risk of silicosis related mortality was increased from 1 in the workers with the lowest exposure level to 22.64/1,000 in the employees with high exposure level. The range of the excess lifetime risk of mortality from lung cancer was in the range of 32-60/1,000 exposed workers. Conclusion: Geometric and arithmetic mean of exposure was higher than threshold limit value for silica dust in all demolition sites. The risk of silicosis mortality for many demolition workers was higher than 1/1,000 (unacceptable level of risk). Estimating the lifetime lung cancer mortality showed a higher risk of mortality from lung cancer in building demolition workers.

구조물의 해체 공정별 오염농도 변화 및 비점오염원 관리 방안 (Variations of the Pollutant Concentration by Explosive Demolition of a Building and Management Plan of Non-point Source Pollution)

  • 주경훈;유성수;김효진;이경희;고광백
    • 화약ㆍ발파
    • /
    • 제29권1호
    • /
    • pp.17-26
    • /
    • 2011
  • 본 연구는 실제 발파해체가 진행된 현장을 대상으로, 해체공정 중 천공과 발파작업시 발생하는 수질 및 토양오염의 농도변화를 통해 환경오염 정도를 조사하였고, 시간 경과에 따른 오염물질의 거동특성을 파악하여 해체현장에서의 비점오염원 관리방안의 필요성을 제시하였다. 그 결과 천공과 발파작업 이후 수질 및 토양의 pH는 콘크리트의 수산화칼슘에 의해 8.5~9.3으로 기준치를 초과하였다. 천공과 발파작업으로 인한 중금속의 농도는 대부분이 기준치 이내였으며, 수질과 토양오염에 크게 영향을 미치지 않는 것으로 판단되었다. 하지만 천공과 발파작업 전후의 오염물에 대한 증감률을 통해, 중금속 중 Cr, Cu, Zn 및 Hg의 농도가 증가된 것을 확인하였으며, 발생된 오염물의 처리방안이 필요하다고 판단되었다. 해체현장에서 시간의 경과와 우기에 따른 오염물질의 농도는 대부분 감소하는 경향을 보였으며, 이는 발생된 오염물질이 비점오염원으로 주변 환경에 영향을 줄 것으로 보인다.