• Title/Summary/Keyword: delay term

Search Result 309, Processing Time 0.023 seconds

A Study on I-PID-Based 2-DOF Snake Robot Head Control Scheme Using RBF Neural Network and Robust Term (RBF 신경망과 강인 항을 적용한 I-PID 기반 2 자유도 뱀 로봇 머리 제어에 관한 연구)

  • Sung-Jae Kim;Jin-Ho Suh
    • The Journal of Korea Robotics Society
    • /
    • v.19 no.2
    • /
    • pp.139-148
    • /
    • 2024
  • In this paper, we propose a two-degree-of-freedom snake robot head system and an I-PID (Intelligent Proportional-Integral-Derivative)-based controller utilizing RBF (Radial Basis Function) neural network and adaptive robust terms as a control strategy to reduce rotation occurring in the snake robot head. This study proposes a two-degree-of-freedom snake robot head system to avoid complex snake robot dynamics. This system has a control system independent of the snake robot. Subsequently, it utilizes an I-PID controller to implement a control system that can effectively manage rotation at the snake robot head, the robot's nonlinearity, and disturbances. To compensate for the time delay estimation errors occurring in the I-PID control system, an RBF neural network is integrated. Additionally, an adaptive robust term is designed and integrated into the control system to enhance robustness and generate control inputs responsive to signal changes. The proposed controller satisfies stability according to Lyapunov's theory. The proposed control strategy was tested using a 9-degreeof-freedom snake robot. It demonstrates the capability to reduce rotation in Lateral undulation, Rectilinear, and Sidewinding locomotion.

A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims (해외 대형건설공사 공기지연클레임의 공기연장기간 입증방법)

  • Kim, Young-jae;Kim, Tae-kyoung;Jo, Duk-sang;Lee, Hwang-ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.165-176
    • /
    • 2015
  • Recently many Korean large-sized construction companies as well as specialty contractors have been expanding their business in the overseas market to mitigate impacts from long-term stagnation in the domestic market. Such as a result, it has been arisen as a major issue that contractors effectively manage the delays which have been commonly faced with in international mega-projects. Therefore it can be said that the ability of the delays management leads a success of project. This paper presents a review of literature for delay analysis methods such as time impact analysis(TIA) and raises practical problems to rationally substantiate the duration of extension of time(EoT) in international mega projects which have wide scope of works as well as complicated and detailed contract baseline programs by taking theoretical approaches. We suggest the two improvement concepts to substantiate the EoT claims which are effectively applicable to practical projects. The first is to sort out dominant delays among numerous delays in advance of applying a delay analysis. The second is to set up the delay sections with the advanced concept for analysing delays' effects by TIA. This study performed a case study on an actual international mega-project. to confirm the effectiveness of improvement concepts that this practical approach is applicable for the assessment of EoT. In conclusion, this paper supposes to provide practitioner in charge for an EoT claim with an advanced substantiation methodogy when they not only analyse the construction delays by using TIA, but also negotiate with stakeholders about with the assessment of EoT.

The Effects of PEOE-Based Class on Learners' Long- and Short-Term Retention and Affective Area (PEOE 수업모형을 적용한 수업이 학습자의 장·단기 파지 및 정의적 영역에 미치는 효과)

  • Choi, Sung-Bong
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.25 no.4
    • /
    • pp.878-890
    • /
    • 2013
  • The purpose of this study is to apply the PEOE class model that can enhance students' scientific creative problem-solving ability and self-directed learning ability in the middle school science subject and analyze the effects of it on students' long- and short-term retention, scientific creative problem-solving ability, and self-directed learning characteristics. And the paper has gained the following results: First, according to the result of analysis through the pre-test, post-test, and delay test to examine the effects of PEOE-based class on learners' long- and short-term retention, it is found to be statistically significant in the significant level of .05. In other words, the class using PEOE influences learners' short-term retention significantly, but it is even more effective in transmitting the concept that students acquire into their long-term memory. Second, according to the result of analysis through the pre-test and post-test to examine the effects of PEOE-based class on learners' scientific creative problem-solving ability, it is found to be statistically significant in the significant level of .05 in general. However, 'elaboration' and 'originality', the subfactors of scientific creative problem-solving ability, do not indicate significant effects. Third, according to the result of analysis through the pre-test and post-test to examine the effects of PEOE-based class on learners' self-directed learning characteristics, it is found to be statistically significant in the significant level of .05 as a whole. However, 'openness' and 'future-oriented self-understanding', the subfactors of self-directed learning characteristics, do not exert significant effects. Based on the above study results, it can be concluded that PEOE-based class is more effective for learners' academic achievement in science, scientific creative problem-solving ability, and self-directed learning characteristics than lecture-method instruction regarding the middle school science unit of 'The Properties of Air and Weather Change'.

A Comparative Study on the Growth & Developmental Status of Premature and Full Term Infants During the First 3Years (미숙아와 정상아의 영유아기 성장발달상태 비교연구)

  • 박영애
    • Journal of Korean Academy of Nursing
    • /
    • v.15 no.3
    • /
    • pp.62-73
    • /
    • 1985
  • The problems of growth & development due to maladjustment are gradually increasing while need for the treatment of children's diseases is decreasing. The level of developmental deficiency or delay correlates with neonatal birth weight and also with gestational age, i.e. degrees of prematurity. There-fore, developmental defects and potential risk factors' are more Common in premature infants than in full term infants. The purpose of this study is to define the difference in the growth at developmental status between premature and full term infants, and to define the relation between the developmental status and the physical growth during the first 3 years' Data were collected from January 10, 1985 to April 6, 1985 at 3 hospitals including St. Mary's Hospital, and through home visiting. The subjects of this study consisted of 79 Premature infants (G.A. <37wks. & B.W. <2.5kg) and 94 full term infants (G.A.≥37 wks. & B.W.≥2.5kg). The study method used was a questionnaire, anthropometric assessment and DDST for normative data of growth & development. The collected data were analyzed using descriptive statistics, chi-square test and t-test. The results of the study were as follows: Hypothesis: 1 : That the prematures will differ from the full term infants in the physical growth status during the first 3 years was partially supported (p<0.02) : The prematures reached up the full term infants in the physical growth status in the first 6 months. And, the first hypothesis was supported (P<0.01) : There are more cases which is below‘the Korean children's physical. growth standards’in prematures than in full term infants. Hypothesis 2 : That the prematures will differ from the full term infants in the developmental status during the first 3 years was supported (P< 0.001);‘Normal’developmental status due to DDST was less in prematures than in full term infants. And, the second hypothesis was Partially supported (P<0.02) : The developmental status of the pre-matures was different from that of the full term infants within the first 3 months by analysis of passed items in DDST, Hypothesis 3 : That the prematures' developmental status will relate to their physical growth during the first 3 years was supported (P<0.001) : If the prematures' developmental status is in delayed status, then, their physical growth status is also in delayed status. This study shows that the prematures differed significantly from the full term infants in the growth at developmental status during their infancy. This means that the nurse can foster the growth & development of the prematures by supportive care during their infancy. Further longitudinal study is needed to verify these findings for the environmental factors.

  • PDF

Main Issues on the Insurer's Duty of Payment of Insurance Claim in English Insurance Law -Focused on the Revised Provisions in Insurance Act 2015 - (영국 보험법 상 보험자의 보험금지급의무와 관련한 주요 쟁점 - 2015년 보험법 상 개정내용을 중심으로 -)

  • SHIN, Gun-Hoon;LEE, Byung-Mun
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.76
    • /
    • pp.125-145
    • /
    • 2017
  • Where an insurer has unreasonably refused to pay a claim or paid it after unreasonably delay, the existing law in England does not provide a remedy for the insured. Accordingly, the insured is not entitled to damages for any loss suffered as a result of the insurer's unreasonable delay. This legal position differs from the law in Scotland and most major common law jurisdictions. LC thought that the legal position in England is anomalous and out of step with general contractual principles. LC considered that a policyholder should have a remedy where an insurer has acted unreasonably in delaying or refusing payment of claim, and, therefore, recommended a statutory implied term in every insurance that the insurer will pay sums due within a reasonable time and breach of that term should give rise to contractual remedies, including damages. More detailed recommendations of LC are as followings. First, it should be an implied term of every insurance contract that, where an insured makes a claim under the contract, the insurer must pay sums due within a reasonable time. Secondly, a reasonable time should always include a reasonable time for investigating and assessing a claim. Although a reasonable time will depend on all the relevant circumstances, for example, the following things may need to be taken into account, that is, (1) the type of insurance, (2) the size and complexity of the claim, (3) compliance with any relevant statutory rules or guidance, and (4) factors outside the insurer's control. Thirdly, if the insurer can show that it had reasonable grounds for disputing the claim(whether as to pay or not, or the amount payable), the insurer does not breach the obligation to pay within a reasonable time merely by failing to pay the claim while the dispute is continuing. In those circumstances, the conduct of the insurer in handling the dispute may be a relevant factor in deciding whether the obligation was breached and, if so, when. Fourthly, Normal contractual remedies for breach of contract should be available for breach of the implied term to pay sums due within a reasonable time. Finally, In non-consumer insurance contracts, the insurer should be permitted to exclude or limit its liability for breach of the obligation to pay sums due within a reasonable time, unless such breach was deliberate or reckless, and such an insurer's right to contract out will be subject to satisfying the transparency requirements.

  • PDF

Development of Technology Mapping Algorithm for CPLD by Considering Time Constraint (시간제약 조건을 고려한 CPLD 기술 매핑 알고리즘 개발)

  • Kim, Hi-Seok;Byun, Sang-Zoon
    • Journal of the Korean Institute of Telematics and Electronics C
    • /
    • v.36C no.6
    • /
    • pp.9-17
    • /
    • 1999
  • In this paper, we propose a new technology mapping algorithm for CPLD under time constraint. In our technology mapping algorithm, a given logic equation is constructed as the DAG type, then the DAG is reconstructed by replicating the node that outdegree is more than or equal to 2. As a result, it makes delay time and the number of CLBs to be minimized. Also, after the number of multi-level is defined and cost of each nodes is calculated, the graph is partitioned in order to fit to k that is the number of OR term within CLB. The partitioned nodes are merged through collapsing and bin packing is performed in order to fit to the number of OR term within CLB. In the results of experiments to MCNC circuits for logic synthesis benchmark, we can shows that proposed technology mapping algorithm reduces delay time and the number of CLBs much more than the existing tools of technology mapping algoritm.

  • PDF

Influence of Taking Medicine for a Period of Time on the Liver Function and Improvement of the Developmental Disordered Children (한약 장기복용이 발달장애아동의 간기능과 건강증진에 미치는 영향)

  • Park, Jae-Hyung;Park, Jae-Hyun;Yoon, Young-Joo;Jeong, Seul-Ki;Lee, Hyun-Jung;Lim, Ja-Sung;Bahn, Geon-Ho;Moon, Jin-Soo;Paeck, Eun-Kyung
    • Journal of Physiology & Pathology in Korean Medicine
    • /
    • v.20 no.2
    • /
    • pp.494-497
    • /
    • 2006
  • A child with five delay, five ankylosis, five weakening needs to take herbal medicine for a long term. So safety, efficacy inspection for the long term usage of herbal medicine and mixed dose is needed because other medication or functional health foods, etc could be taken during this process. Operated liver function test before and after dosing herbal medicine to one hundred and sixty children who aided private oriental medicine located in Seoul, and measured the efficacy by comparing sleeping hours, morbidity, stamina, sanguineness, personality, digestion with the state before taking herbal medicine based on questionnaire done by the parents. Every children were under the limits, and there were no differences between boys and girls, and no notable differences according to family histories. There were positive results in efficacy inspection ordered as improvement in personality, stamina, sanguineness, decrease in morbidity, increase in appetite, digestion. No signs of disorder in liver function has been found during the dose of herbal medicine or simultaneous medicine, and shown promotion of health.

A Study on the Radiation Exposure Dose of Brain Perfusion CT Examination a Phantom (Phantom을 이용한 뇌 관류 CT검사에서 방사선 피폭선량에 관한 연구)

  • Jung, Hong-Rynag;Kim, Ki-Jeong;Mo, Eun-Hee
    • Journal of the Korea Convergence Society
    • /
    • v.6 no.5
    • /
    • pp.287-294
    • /
    • 2015
  • The purpose of this study, was Let's examine the exposure dose at the time of cerebral blood flow CT scan of acute ischemic stroke patients. In particular, long-term high doses of radiation sensitive organs and we Measured using phantom and a glass dosimeter. Apply the existing protocol suggested by the manufacturer (fixed time delay technique) and the proposed new convergence protocol (bolus tracking technique), reporting to measure the dose, dose reduction was to prepare the way. Results up to 39.8% as compared to the existing protocols in a new suggested convergence protocol, a minimum of 5.8% was long-term dose is reduced. Test dose of $CDTI_{vol}$ and DLP values decreased 25%, respectively, were measured at less than recommended dose. Try checking the protocol set out in the existing based on the analysis result of the above, by applying the proposed new convergence protocol by reducing the dose would have to contribute to improved public health. It is believed to be research continues to find the optimum protocol in the other tests.

A Study on Reliability and Shelf-Life of DELAY M9 (DELAY M9 탄약의 신뢰도 및 저장수명 연구)

  • Lee, Jeong-Ho;Choi, Jae-Sung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.9
    • /
    • pp.64-72
    • /
    • 2020
  • DELAY M9 is an ammunition used in combination with the fuse M904 and M905 of aviation drop-off ammunitions. Due to the properties of the ammunition, the performance or safety of the ammunition cannot be verified until it is used, because of its one-time function, no reproduction and is finally destroyed at the same time. Long-term storage of ammunition in use by the army is inevitable due to its operational characteristics, and a test evaluation is required to maintain and verify the performance of stored ammunition for immediate use in case of emergency. This paper estimates the reliability and shelf life of the DELAY M9 ammunition by using the test data obtained through ASRP performed from the past to the present. The result of the performance evaluation test for the currently stored DELAY M9 ammunition is analyzed, and the reliability and shelf-life of the stored ammunition are assessed by examining the number of defects according to the storage time and production year. This research result can be used to manage the stored ammunition, such as ASRP planning and evaluation test, result analysis and munition state decision.

Automatic Recognition of Pitch Accents Using Time-Delay Recurrent Neural Network (시간지연 회귀 신경회로망을 이용한 피치 악센트 인식)

  • Kim, Sung-Suk;Kim, Chul;Lee, Wan-Joo
    • The Journal of the Acoustical Society of Korea
    • /
    • v.23 no.4E
    • /
    • pp.112-119
    • /
    • 2004
  • This paper presents a method for the automatic recognition of pitch accents with no prior knowledge about the phonetic content of the signal (no knowledge of word or phoneme boundaries or of phoneme labels). The recognition algorithm used in this paper is a time-delay recurrent neural network (TDRNN). A TDRNN is a neural network classier with two different representations of dynamic context: delayed input nodes allow the representation of an explicit trajectory F0(t), while recurrent nodes provide long-term context information that can be used to normalize the input F0 trajectory. Performance of the TDRNN is compared to the performance of a MLP (multi-layer perceptron) and an HMM (Hidden Markov Model) on the same task. The TDRNN shows the correct recognition of $91.9{\%}\;of\;pitch\;events\;and\;91.0{\%}$ of pitch non-events, for an average accuracy of $91.5{\%}$ over both pitch events and non-events. The MLP with contextual input exhibits $85.8{\%},\;85.5{\%},\;and\;85.6{\%}$ recognition accuracy respectively, while the HMM shows the correct recognition of $36.8{\%}\;of\;pitch\;events\;and\;87.3{\%}$ of pitch non-events, for an average accuracy of $62.2{\%}$ over both pitch events and non-events. These results suggest that the TDRNN architecture is useful for the automatic recognition of pitch accents.