• Title/Summary/Keyword: delay term

Search Result 309, Processing Time 0.02 seconds

Development of Ground-based GNSS Data Assimilation System for KIM and their Impacts (KIM을 위한 지상 기반 GNSS 자료 동화 체계 개발 및 효과)

  • Han, Hyun-Jun;Kang, Jeon-Ho;Kwon, In-Hyuk
    • Atmosphere
    • /
    • v.32 no.3
    • /
    • pp.191-206
    • /
    • 2022
  • Assimilation trials were performed using the Korea Institute of Atmospheric Prediction Systems (KIAPS) Korea Integrated Model (KIM) semi-operational forecast system to assess the impact of ground-based Global Navigation Satellite System (GNSS) Zenith Total Delay (ZTD) on forecast. To use the optimal observation in data assimilation of KIM forecast system, in this study, the ZTD observation were pre-processed. It involves the bias correction using long term background of KIM, the quality control based on background and the thinning of ZTD data. Also, to give the effect of observation directly to data assimilation, the observation operator which include non-linear model, tangent linear model, adjoint model, and jacobian code was developed and verified. As a result, impact of ZTD observation in both analysis and forecast was neutral or slightly positive on most meteorological variables, but positive on geopotential height. In addition, ZTD observations contributed to the improvement on precipitation of KIM forecast, specially over 5 mm/day precipitation intensity.

Establishment of the Repair Cycle of the Components of the Apartment Housing

  • Lee, KangHee;Ahn, YongHan;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.14 no.2
    • /
    • pp.69-75
    • /
    • 2014
  • Building has been deteriorated over the year after construction. The deterioration has caused to hinder the living condition and to decrease the building value. Thus, it is important to prevent or delay the building deterioration as well as to proceed the maintenance. The long-term repair program for the apartment in Korea plays a key role to make the repair plan after construction and to assure the function decent. This is not flexible to the change of the material and component because the program is provided by the Korean-law. Many items are omitted in the long-term program so that the maintenance experts face many difficulties to make a repair plan. In this paper, it aimed at providing the repair cycle and repair ratio according to the repair scope, which are not provided in the current program. This study shows that the repair ratio is presented with quartile range in 25%, 50%, 75% and 100%. This has an advantage to take an overall look in repair items. Under this presentation of the repair ratio, each item has a unique repair value. Second, the repair scope is divided into partly repair, fully repair, partly alteration and fully alteration. If a fully repair has a repair ratio close to 100%, it would mean that a fully repair is a fully alteration. Third, the short repair cycle means that it requires to maintain the function or performance of the components in a short term.

Performance evaluation of LTE/LTE-A closed subscriber group femto-cell discovery (LTE/LTE-A 배타적 접속 펨토셀에 대한 검출 성능 평가)

  • Joo, Yang-Ick
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.38 no.4
    • /
    • pp.451-455
    • /
    • 2014
  • In LTE (Long Term Evolution)/LTE-A (Long Term Evolution-Advanced) networks, hierarchical macro/femto-cell structure is adopted to enhance system capacity. Such a femto-cell is deployed as a Closed Subscriber Group (CSG) eNB. However, the inbound handover to CSG cell experiences longer delay than normal handover because it spends more time detecting the associated CSG cells due to its sparse deployment. Most of all the legacy UEs (User Equipments) have been implemented without considering the inbound CSG handover. Accordingly, they may not meet the performance requirements on the cell discovery described in the LTE/LTE-A standards. Therefore, in this paper, the performance of the CSG femto-cell detection is evaluated using computer simulation. The evaluation results will provide a basis to tackle the latency problem of inbound CSG handover.

National Registry Data from Korean Neonatal Network: Two-Year Outcomes of Korean Very Low Birth Weight Infants Born in 2013-2014

  • Youn, YoungAh;Lee, Soon Min;Hwang, Jong-Hee;Cho, Su Jin;Kim, Ee-Kyung;Kim, Ellen Ai-Rhan
    • Journal of Korean Medical Science
    • /
    • v.33 no.48
    • /
    • pp.309.1-309.13
    • /
    • 2018
  • Background: The aim of this study was to observe long-term outcomes of very low birth weight infants (VLBWIs) born between 2013 and 2014 in Korea, especially focusing on neurodevelopmental outcomes. Methods: The data were collected from Korean Neonatal Network (KNN) registry from 43 and 54 participating units in 2013 and 2014, respectively. A standardized electronic case report form containing 30 items related to long-term follow up was used after data validation. Results: Of 2,660 VLBWI, the mean gestational age and birth weight were $29^{1/7}{\pm}2^{6/7}$ weeks and $1,093{\pm}268g$ in 2013 and $29^{2/7}{\pm}2^{6/7}$ weeks and $1,125{\pm}261g$ in 2014, respectively. The post-discharge mortality rate was 1.2%-1.5%. Weight < 50th percentile was 46.5% in 2013 and 66.1% in 2014. The overall prevalence of cerebral palsy among the follow up infants was 6.2% in 2013 and 6.6% in 2014. The Bayley Scales of Infant Developmental Outcomes version II showed 14%-25% of infants had developmental delay and 3%-8% of infants in Bayley version III. For the Korean developmental screening test for infants and children, the area "Further evaluation needed" was 5%-12%. Blindness in both eyes was reported to be 0.2%-0.3%. For hearing impairment, 0.8%-1.9% showed bilateral hearing loss. Almost 50% were readmitted to hospital with respiratory illness as a leading cause. Conclusion: The overall prevalence of long-term outcomes was not largely different among the VLBWI born between 2013 and 2014. This study is the first large national data study of long-term outcomes.

Characteristics of Long-Term Settlement in the Soft Ground of Nakdong River by Numerical Analysis (수치해석에 의한 낙동강 하구 연약지반의 장기침하특성)

  • Park, Choon-Sik;Ryu, Mean-Young
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.3
    • /
    • pp.55-67
    • /
    • 2019
  • Deep soft ground in mouth of Nackdong river requires to be analysed with prediction method concerning characteristics of secondary consolidation from the beginning because it causes excessive settlement due to time-dependant secondary consolidation characteristics. This study investigated characteristics of extended settlement by conducting one-dimensional theory, elasto-plastic model and visco-elasto-plastic model as well as analyzing long-term measuring data observed over 2,000 days. According to one-dimensional theory and elasto-plastic model, there is not definite correlation between height of embankment and depth of soft ground while visco-elasto-plastic model showed similar result of settlement to that of long-term measuring data. Consequently it is suggested that applying visco-elasto-plastic model to developing deep underground place as studied area on predicting extended settlement before construction prevents economic loss and delay during process by preparing secondary consolidation characteristics.

Characteristics of Initiation and Termination of Tibialis Anterior Contraction in Adults With Hemiplegia: A Preliminary Study

  • Chung, Yi-Jung;Lee, Jung-Ah;Shin, Won-Seob;An, Seung-Heon;Lee, Eun-Woo;Jung, Kyoung-Sim
    • Physical Therapy Korea
    • /
    • v.14 no.4
    • /
    • pp.50-57
    • /
    • 2007
  • The purpose of this study was to investigate the relationship between delays in initiation and termination of tibialis anterior contraction through surface electromyographic (sEMG) analysis in adults with hemiplegia and healthy subjects and clinical assessment of lower-limb mobility. EMG activity of 6 long-term survivors of stroke and 5 healthy subjects was recorded during maximal isometric ankle dorsiflexion in 3 seconds beeper signals. It must be done as fast and forcefully as possible. Lower limb mobility was assessed with Modified Emory Functional Ambulation Profile (mEFAP). Delay in initiation and termination of muscle contraction was significantly prolonged in the affected lower limb relative to the unaffected limb. Termination of muscle contraction in the hemiplegic lower limb was significantly delayed than the initiation on the affected sides. Delay in initiation and termination of muscle contraction correlated significantly with a few range of mEFAP. Abnormally delayed initiation and termination of muscle contraction may contribute to hemiparetic lower limb mobility in hemiparetic patients. Consequently, this study showed that abnormal delay of initiation and termination of muscle contraction may contribute to hemiparetic lower limb mobility in adults with hemiplegia. Further studies are needed to demonstrate a treatment effect.

  • PDF

STUDY ON THERMOSENSITIVITY OF CHITOSAN SCAFFOLD AND ON ITS EFFECTS ON FIBROBLAST PROLIFERATION IN CELL THERAPY FOR SOFT TISSUE AUGMENTATION (연조직 증강을 위한 세포치료 시 비계로서 키토산의 온도 감응성 및 섬유모세포의 증식에 미치는 영향에 관한 연구)

  • Kim, Jung-Ho;Choi, Jin-Young
    • Journal of the Korean Association of Oral and Maxillofacial Surgeons
    • /
    • v.35 no.3
    • /
    • pp.146-152
    • /
    • 2009
  • Traditional surgical method or injection using filler is performed for soft tissue augmentation. Surgical methods have disadvantage of surgical morbidity. Commercially available injectable materials have the disadvantages such as resorption, short-term effect. repeated application and hypersensitivity. Significant shortcoming of cell therapy using autologous fibroblasts is delay of treatment effect. Chitosan/${\beta}$-glycerol phosphate (GP) solution has thermosensitive property and allows sol-gel transition at physiologic pH and temperature. These properties may resolve the delay of treatment effect. The purposes of this study are to evaluate the viscosity and pH changes of chitosan/${\beta}$-GP solutions and to evaluate the effect of chitosan/${\beta}$-GP solution on fibroblast proliferation and production of collagen. We measured the viscosity and pH as function of temperature, of the solution containing 1:0.7, 1:0.75, 1:0.8 chitosan (1, 10, 100, 700 kDa) /${\beta}$-GP. Fibroblasts from ears of 5 rats were cultured in chitosan/${\beta}$-GP solutions for 3 weeks. Cell proliferation and collagen contents were measured every week with WST (water-soluble tetrazolium salt) assay and Collagen assay respectively. The Results are 1) Chitosan(100 kDa<)/${\beta}$-GP solution (1:0.75) showed sol-gel transition at physiologic pH and body temperature and injectable properties. It will enable to resolve the delay in treatment effect 2) Cell proliferation and total collagen contents of the control group were increased with time. However, these decreased after the 1st week in experimental group 3) Collagen contents in the experimental group are higher than that of control group. Chitosan/${\beta}$-GP solution may provide favorable conditions for cell function

A TCP-Friendly Congestion Control Scheme using Hybrid Approach for Reduction of Transmission Delay for Real-Time Video Stream (실시간 비디오 스트림의 전송지연 축소를 위한 TCP 친화적 하이브리드 혼잡제어 기법)

  • 김형진;조정현;나인호
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.2
    • /
    • pp.304-309
    • /
    • 2004
  • Recently, the needs for multimedia stream such as digital audio and video in the Internet has increased tremendously. Unlike TCP, the UDP protocol, which has been used to transmit streaming traffic thorough the Internet, does not apply any congestion control mechanism to regulate the data flow thorough the shared network And it leads to congestion collapse of the Internet and results in long-term transmission delay. To avoid any adverse effect on the current Internet functionality, a now protocol of modification or addition of some functionality to perform congestion control and to reduce huge transmission delay in transmitting of multimedia stream are in study. TCP-friendly congestion control mechanism is classified into two : one is window-based congestion control scheme using general window management functionalities, the other is rate-based congestion control scheme using TCP modeling equation. In this paper, we propose an algorithm for improving the transmitting rate on a hybrid TCP-friendly congestion control scheme combined with widow-based and late-based congestion control for multimedia stream. And we also simulate the performance of improved TEAR implementation using NS. With He simulation results, we show that the improved TEAR can provide better fairness and lower rate fluctuations than TCP.

Handover Delay Stability Method for Train Control on LTE Railway System (LTE-R 시스템에서 열차제어를 위한 핸드오버 지연 안정화 방안)

  • Oh, Sang-Chul;Yoon, Byung-Sik;Lee, Sook-Jin;Choi, Min-Suk;Kim, Dong-Joon;Sung, Dong-il
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.24 no.12
    • /
    • pp.1646-1653
    • /
    • 2020
  • In case that the train driving with diverse high-speeds is manipulates by real-time remote control in long-term evolution-railway (LTE-R) system with frequent handovers, the real-time safe transmission of train control messages is important element. The handover delay time stability method regardless of train speed in order to enhance the real-time remote train control stability in LTE-R system is proposed in the paper. Furthermore, the variable speeds and altitudes of train collected by real measurements are applied for upgrading simulation accuracy. The simulation results inform that not only there are stable and unstable ranges to A3 offset values, but the optimal offset value for average handover delay is in unstable range. However, the late handover with A3 offset values in stable range should be chosen to get the predictable handover delay regardless of train speed rather than the early handover with A3 offset values in unstable range, since the key value of high-speed Korea railway system is the stability.

A Fair Scheduling Model Covering the History-Sensitiveness Spectrum (과거민감도 스펙트럼을 포괄하는 공정 스케줄링 모델)

  • Park, Kyeong-Ho;Hwang, Ho-Young;Lee, Chang-Gun;Min, Sangl-Yul
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.34 no.5_6
    • /
    • pp.249-256
    • /
    • 2007
  • GPS(generalized processor sharing) is a fair scheduling scheme that guarantees fair distribution of resources in an instantaneous manner, while virtual clock pursues fairness in the sense of long-term. In this paper, we notice that the degree of memorylessness is the key difference of the two schemes, and propose a unified scheduling model that covers the whole spectrum of history-sensitiveness. In this model, each application's resource right is represented in a value called deposit, which is accumulated at a predefined rate and is consumed for services. The unused deposit, representing non-usage history, gives the application more opportunity to be scheduled, hence relatively enhancing its response time. Decay of the deposit means partial erase of the history and, by adjusting the decaying rate, the degree of history-sensitiveness is controlled. In the spectrum, the memoryless end corresponds GPS and the other end with full history corresponds virtual clock. And there exists a tradeoff between average delay and long-term fairness. We examine the properties of the model by analysis and simulation.