Joint Pricing and Lot Sizing Policy under Order-Size-Dependent Delay in Payments

  • Seong Whan Shinn
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2000.05a
    • /
    • pp.77-86
    • /
    • 2000
  • This paper deals with the problem of determining the retailer's optimal price and order size under the condition of order-size-dependent delay in payments. It is assumed that the length of delay is a function of the retailer's total amount of purchase. The constant price elasticity demand function is adopted which is a decreasing function of retail price. Investigation of the properties of an optimal solution allows us to develop an algorithm whose validity is illustrated through an example problem.

  • PDF

An Efficient Routing Algorithm for extreme networking environments (극단적인 네트워크 환경을 위한 효율적인 라우팅 알고리즘)

  • Wang, Jong Soo;Seo, Doo Ok
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.8 no.1
    • /
    • pp.47-53
    • /
    • 2012
  • Sensor networks and car networks that have different structure from that of conventional TCP/IP network require extreme network environment due to frequent change of connectivity. Because such extreme network environment has characteristics like unreliable link connectivity, long delay time, asymmetrical data transfer rate, and high error rate, etc., it is difficult to perform normally with the conventional TCP/P-based routing. DTNs (delay and disruption tolerant network) was designed to support data transfer in extreme network environment with long delay time and no guarantee for continuous connectivity between terminals. This study suggests an algorithm that limits the maximum number of copying transferred message to L by improving the spray and wait routing protocol, which is one of the conventional DTNs routing protocols, and using the azimuth and density data of the mobile nods. The suggested algorithm was examined by using ONE, a DTNs simulator. As a result, it could reduce the delay time and overhead of unnecessary packets compared to the conventional spray and wait routing protocol.

A Study of Storage Life Estimation for Delay System in the Fuse of 81mm Illuminating Projectile (81미리 조명탄용 신관 KM84A1E1 지연제의 저장수명 예측 연구)

  • Chang, Il-Ho;Kim, Ji-Hoon;Lee, Woo-Chul;Back, Seung-Jun;Son, Young-Kap
    • Journal of Korean Society for Quality Management
    • /
    • v.40 no.3
    • /
    • pp.270-277
    • /
    • 2012
  • Purpose: In this paper, storage lifetime of delay system in the fuse of 81MM illuminating projectile is estimated. Methods: Accelerated degradation testings of tungsten delay system using both temperature and humidity stresses were performed, and then delay time increase of the systems were analyzed as degradation data based on distribution-based degradation processes. Results: The estimated storage lifetime of detonator is between 11.8 years and 17.6 years with each stress-life relationship. Conclusion: Comparing with field data, storage lifetime of 90% reliability is about 12 years.

Improvement of the delay declaration of the traffic insurance accident -focus on a business truck- (자동차 보험사고 지연신고 개선방안연구 -사업용화물자동차를 중심으로-)

  • Lee, Seog-Hyeon;Jung, Jae-Jung;Lee, Jong-Eun;Kwon, Young-Jin;Kang, Kyong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.557-564
    • /
    • 2013
  • This study investigates the delay declaration of the traffic insurance accident which is focused on a business truck causing the traffic insurance accident. The type of the delay declaration is classified as 15 types and it differs in level of payment of insurance money. It is most important that the support policy of government and the self-help of related business to reduce the delay declaration and pursue progressive solution. Moreover, it is essential not only introducing the strict regulation system but also adapting the various victim protection system.

  • PDF

The study on the Derivation of major delay factors in Outrigger Framework of Tall Building (초고층 아웃리거층 골조공사의 주요 공기지연 요인 도출)

  • Kim, Wan-Soub;Lee, Dongyoon;Lee, Myungdo;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.190-191
    • /
    • 2015
  • Construction delays occur frequently in outrigger framework of tall buildings due to the unexpected conditions and lack of experience. However, delay factors of the outrigger framework has not been managed efficiently. Therefore, the systematic management is needed by perceiving possible delay factors before constructing management system. In this study, the major delay factors of outrigger framework are conducted to derive by using the Importance Performance Analysis(IPA). It is expected that the results of this study are utilized for planning of systematic scheduling in outrigger framework of tall building.

  • PDF

Investigating delay factors in construction industry: A Korean perspective

  • Acharya, Nirmal Kumar;Im, Hae-Man;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.177-190
    • /
    • 2006
  • Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.

SNMP Based Routing Process for Hand Handoff (Fast Handoff를 위한 SNMP 기반의 라우팅 프로세스)

  • 유상훈;박수현;백두권
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2003.11a
    • /
    • pp.139-144
    • /
    • 2003
  • Mobile Node has to maintain communication as they move form place to place, so it doesn't guarantee Quality of Service(QoS). Fast Handoff is important to provide multimedia and real-time applications services in mobile, and it is closely related to handoff delay. Therefore, handoff delay problem is actively studied to quarantee QoS as a main issue in mobile IP research area. Next generation Mobile IPv6 resolve this problem somewhat, triangle problem for first packet and handoff delay still remain. In this paper, we suggest SNMP Information-based routing that adds keyword management method to Information-based routing in active network in order to resolve such a problem, and then suggest QoS controlled handoff based on SNMP Information-Based routing. After modeling of suggested method and existing handoff method, simulations are carried out with NS-2 for performance evaluation. The results of simulations show the some improvement on handoff delay, and therefore on QoS improvement.

  • PDF

An Analysis on Work Delaying Factors in Apartment Building Construction (공동주택 공사의 작업지연요소 분석)

  • Ahn, Sang-Hyun;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.496-501
    • /
    • 2006
  • Work delay is the one of facts that make the reliability of construction business decrease. Building a causal classification system of work delay and deducing the managemental item for it gives a great competition to the construction industry. It is, however, so rare to study about work delay so far. Therefore, this research analyzed a questionnaire, which is focussing on the public apartment construction, to look into the causal root factors and deduce the work delay factors. Finally, we suggest a major managing point to remove effectively the work delay factors.

  • PDF

Analytical Framework for Promoting Customer Participation in Benefit Delay Type Services

  • Cho, Myung-Rae
    • The Journal of Economics, Marketing and Management
    • /
    • v.6 no.1
    • /
    • pp.9-16
    • /
    • 2018
  • Purpose - Benefit delay type services have a characteristic of benefit delay that does not immediately appear at the time of delivery of service. Due to a characteristic of benefit delay, the customer's participation in the service delivery system is hindered, and the quality of service declines. As a result, customer satisfaction would be reduced. The purpose of this study is to construct an analytical framework to analyze a mechanism that promotes customer participation in benefit delay type services. Research design, data, and Methodology - Existing research has considered only the performance of service companies to enhance the quality of service and customer satisfaction. This study focused on customer participation as a factor affecting the quality of service and customer satisfaction and attempted to construct an analytical framework based on a theoretical perspective of motivational research. Results - By adopting the motivation theory, this research derived three concepts, the possibility of gaining benefits, the emotional experience, and the desire of benefit. And motivation is created when the three factors interact with each other. Conclusions - This paper has constructed an analytical framework for analyzing factors that promote customer participation in the benefit delay service and finally has proposed case study for further research.

A Study on the Priority Analysis of Work Delay Factors in Steal-frame Work using FMEA (FMEA를 활용한 철골공사 작업지연요인의 중요도에 관한 연구)

  • Lee, Hyun-Chul;Lee, Jae-Hong;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.91-101
    • /
    • 2009
  • The factors of uncertainty such as work delay could cause many problems, for example, increase of construction cost and terms of work, and the deterioration of quality. Because of these, the uncertainty risk is regarded as an important management factor to obtain the success of construction project. So, the systematic management plan about the uncertainty factors is needed because it plays an important role in the completion of entire project. And also analysis of some factors which can cause the work delay can be one way of improving construction project's certainty and making it competitive. In this reason, we have to make an effort to set a priority based on analysis of quantitatively numerical value about work delay factors to manage them effectively. Thus, this study aims to suggest the basic data for the effective management and prevention of work delay in steel-frame work which is progressive actively now, along with increasing of demand of high-rise buildings by analyzing each reasons of work delay factors and also by suggesting important management factors that are coded according to each construction work using FMEA method which could give a data about the importance of work delay factors through quantitatively numerical value.