• Title/Summary/Keyword: delay field test

Search Result 83, Processing Time 0.027 seconds

An On-Chip Test Clock Control Scheme for Circuit Aging Monitoring

  • Yi, Hyunbean
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.13 no.1
    • /
    • pp.71-78
    • /
    • 2013
  • In highly reliable and durable systems, failures due to aging might result in catastrophes. Aging monitoring techniques to prevent catastrophes by predicting such a failure are required. Aging can be monitored by performing a delay test at faster clocks than functional clock in field and checking the current delay state from the test clock frequencies at which the delay test is passed or failed. In this paper, we focus on test clock control scheme for a system-on-chip (SoC) with multiple clock domains. We describe limitations of existing at-speed test clock control methods and present an on-chip faster-than-at-speed test clock control scheme for intra/inter-clock domain test. Experimental results show our simulation results and area analysis. With a simple control scheme, with low area overhead, and without any modification of scan architecture, the proposed method enables faster-than-at-speed test of SoCs with multiple clock domains.

New Scan Design for Delay Fault Testing of Sequential Circuits (순차 회로의 지연 고장 검출을 위한 새로운 스캔 설계)

  • 허경회;강용석;강성호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.9
    • /
    • pp.1161-1166
    • /
    • 1999
  • Delay testing has become highlighted in the field of digital circuits as the speed and the density of the circuits improve greatly. However, delay faults in sequential circuits cannot be detected easily due to the existence of state registers. To overcome this difficulty a new scan filp-flop is devised which can be used for both stuck-at testing and delay testing. In addition, the new scan flip-flop can be applied to both the existing functional justification method and the newly-developed reverse functional justification method which uses scan flip-flops as storing the second test patterns rather than the first test patterns. Experimental results on ISCAS 89 benchmark circuits show that the number of testable paths can be increased by about 10% on the average.

  • PDF

Efficient Path Delay Testing Using Scan Justification

  • Huh, Kyung-Hoi;Kang, Yong-Seok;Kang, Sung-Ho
    • ETRI Journal
    • /
    • v.25 no.3
    • /
    • pp.187-194
    • /
    • 2003
  • Delay testing has become an area of focus in the field of digital circuits as the speed and density of circuits have greatly improved. This paper proposes a new scan flip-flop and test algorithm to overcome some of the problems in delay testing. In the proposed test algorithm, the second test pattern is generated by scan justification, and the first test pattern is processed by functional justification. In the conventional functional justification, it is hard to generate the proper second test pattern because it uses a combinational circuit for the pattern. The proposed scan justification has the advantage of easily generating the second test pattern by direct justification from the scan. To implement our scheme, we devised a new scan in which the slave latch is bypassed by an additional latch to allow the slave to hold its state while a new pattern is scanned in. Experimental results on ISCAS'89 benchmark circuits show that the number of testable paths can be increased by about 45 % over the conventional functional justification.

  • PDF

Application and Evaluation of a Traffic Signal Control Algorithm based on Travel Time Information for Coordinated Arterials (연동교차로를 위한 통행시간기반 신호제어 알고리즘의 현장 적용 및 평가)

  • Jeong, Yeong-Je;Kim, Yeong-Chan
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.5
    • /
    • pp.179-187
    • /
    • 2009
  • This study develops a real-time signal control algorithm based on sectional travel times and includes a field test and evaluation. The objective function of the signal control algorithm is the equalization of delay of traffic movements, and the main process is calculating dissolved time of the queue and delay using the sectional travel time and detection time of individual vehicles. Then this algorithm calculates the delay variation and a targeted red time and calculates the length of the cycle and phase. A progression factor from the US HCM was applied as a method to consider the effect of coordinating the delay calculation, and this algorithm uses the average delay and detection time of probe vehicles, which were collected during the accumulated cycle for a stabile signal control. As a result of the field test and evaluation through the application of the traffic signal control algorithm on four consecutive intersections at 400m intervals, reduction of delay and an equalization effect of delay against TOD control were confirmed using the standard deviation of delay by traffic movements. This study was conducted to develop a real-time traffic signal control algorithm based on sectional travel time, using general-purpose traffic information detectors. With the current practice of disseminating ubiquitous technology, the aim of this study was a fundamental change of the traffic signal control method.

A Study on Mix Design of Concrete Pavement on Early Strength Development in Cool Weather Condition (저온 환경에서의 조기강도 발현을 위한 콘크리트 포장 배합 연구)

  • Ryu, SungWoo;Kim, JinHwan;Hong, SeungHo;Park, JeJin
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.1-10
    • /
    • 2017
  • PURPOSES : This paper focuses on strength development according to the mix design with cement type and mineral admixture from laboratory and field tests in cool weather. METHODS : Two methods evaluated the mix design of concrete pavement in cool weather. Firstly, laboratory tests including slump, air contents, setting time, strength, maturity, and freezing-thawing test were conducted. Three alternatives were selected based on the tests. Secondly, a field test was conducted and the optimum mix design in cool weather was suggested. RESULTS : It is an evident from the laboratory test that a mix with type III cement showed better performance than the one with type I cement. There was a delay in strength development of a mix with mineral admixture compared to mix design without any mineral admixture. In the field test, type III cement+flyash 20% mix design proved the best performance. CONCLUSIONS : For concrete pavement in cool weather, mix design using type III cement could overcome the strength delay due to mineral admixture. Moreover, it is possible to make sure of durability of pavement. Therefore, strength and durability problems due to cool weather would decrease.

An Effective Shared-Slate Management using Network Delay Estimation in Client-Sewer-Based Networked Virtual Environment (클라이언트-서버기반 분산가상환경에서의 지연예측을 통한 효율적 공유상태관리)

  • 심광현;최병태;김종성;오원근
    • Proceedings of the IEEK Conference
    • /
    • 2000.11c
    • /
    • pp.189-192
    • /
    • 2000
  • This paper presents a new DR(Dead Reckoning) algorithm in client-server-based networked virtual environment using network delay estimation. In the algorithm, a new update packet is sent to server (or client) whenever the difference of current real value and tracking value after network delay is larger than threshold. To confirm the proposed algorithm, a test network game was implemented. Through iterative field tests, we knew that this algorithm provides fair service and stability.

  • PDF

A study on charging and electrical stability characteristics with no-insulation and metal insulation in form of racetrack type coils

  • Quach, Huu Luong;Kim, Ho Min
    • Progress in Superconductivity and Cryogenics
    • /
    • v.22 no.3
    • /
    • pp.13-19
    • /
    • 2020
  • This study presents the experiment and simulation results on the magnetic field response and electrical stability behaviors of no-insulation (NI) and metal insulation with stainless steel tape (MI-SS) which wound in form of racetrack type coils. First of all, the structural design of the racetrack type bobbin was shown along with its parameters. Then, the current-voltage tests were carried out to measure the critical current of both test coils. Also, the sudden discharging and charging tests were performed in the steady state to estimate the decay field time and magnetic field response, respectively. Finally, the overcurrent tests were conducted in the transient state to investigate the electrical stability of these test coils. Based on the experimental results, the contact surface resistances were calculated and applied to the field coils (FCs) of 10-MW-class second generation high temperature superconducting generator (2G HTSG) used in wind offshore environment. The charging delay time and electrical stability for NI and MI-SS HTS FCs of 10-MW-class 2G HTSG are analyzed by the equivalent circuit model and the key parameters which were obtained from the electromagnetic finite element analysis results.

CDMA Mobile System Testbed and Field Test

  • Kwon, Dong-Seung;Hahm, Young-Kwon;Jeong, In-Myoung;Im, Duck-Bin
    • ETRI Journal
    • /
    • v.19 no.3
    • /
    • pp.259-280
    • /
    • 1997
  • This paper briefly explains the configuration of CDMA Mobile System (CMS) test bed. The measured fading and delay results of CDMA signal in Taejon area are shown. In comparison to other cellular systems, there are more parameters in the CDMA systems that affect system performance and capacity. We performed the optimization test of the selected parameters and present the effect of each parameter on the performance. This paper presents the capacity and performance test results of CMS. The capacity test was performed on ETRI site of three sectors in Taejon area. The performance tests include call completion rate, busy hour call attempt, and the delay characteristics of voice.

  • PDF

A Study of Storage Life Estimation for Delay System in the Fuse of 81mm Illuminating Projectile (81미리 조명탄용 신관 KM84A1E1 지연제의 저장수명 예측 연구)

  • Chang, Il-Ho;Kim, Ji-Hoon;Lee, Woo-Chul;Back, Seung-Jun;Son, Young-Kap
    • Journal of Korean Society for Quality Management
    • /
    • v.40 no.3
    • /
    • pp.270-277
    • /
    • 2012
  • Purpose: In this paper, storage lifetime of delay system in the fuse of 81MM illuminating projectile is estimated. Methods: Accelerated degradation testings of tungsten delay system using both temperature and humidity stresses were performed, and then delay time increase of the systems were analyzed as degradation data based on distribution-based degradation processes. Results: The estimated storage lifetime of detonator is between 11.8 years and 17.6 years with each stress-life relationship. Conclusion: Comparing with field data, storage lifetime of 90% reliability is about 12 years.

Measurement Procedure and Analysis of Terrestrial DTV Field Test in Taejeon (대전지역의 지상파 DTV 현장 측정 및 결과 분석)

  • 김종호;조진호;이형수;박재홍
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.11 no.5
    • /
    • pp.830-838
    • /
    • 2000
  • This paper represents measurement prodcedure and analysis of terrestrial DTV field test results over Taejeon city area. Thirty three points were selected as measuring points. Signal power, noise power, Segment Error Rate, RMS delay spread and equalizer performance was measured. The video and audio quality of DTV was good over half of test sites. Equalizer, could correct signal ghost and improve S/N up to 13.7 dB. From this test, the test procedure for DTV will be estabilished.

  • PDF