• Title/Summary/Keyword: delay factors

Search Result 679, Processing Time 0.029 seconds

Factors Related to Prehospital Delay Time in Patients with Stroke (뇌졸중 환자의 병원 내원전 지연시간 관련 요인)

  • Lee Jong-Kyung
    • Journal of Korean Academy of Fundamentals of Nursing
    • /
    • v.10 no.2
    • /
    • pp.154-162
    • /
    • 2003
  • Purpose: The purpose of this study was to investigate factors which can delay hospital arrival for patients with acute stroke. Method: The participants for this study were 102 patients who were admitted to the Department of Neurology in a hospital in Chungnam province. Data were collected from Oct, 2002 to June, 2003. The data were analyzed with frequencies, percentages, and $x^2$ test using the SPSS PC program. Result: The results of this study were as follows: 1. Only 33.8 % of participants arrived at the hospital within 3 hours. 2. Educational level, economic status, people living in same residence, and place of residence were factors which significantly affected prehospital delay time. Also there were significant differences in prehospital delay time according to family history of stroke, day of the week when symptoms began, perception of seriousness of symptoms, type of hospital first used, and transportation. Conclusion: Therefore, to reduce prehospital delay time, educational programs which focus on the above factors need to be developed. Also, a public campaign for utilizing emergency service to reduce transportation time for acute stroke patients need to be facilitated.

  • PDF

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

Dilemma of Saudi Arabian Construction Industry

  • Albogamy, Abdullah;Scott, Darren;Dawood, Nashwan
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.35-40
    • /
    • 2013
  • Currently, the Kingdom of Saudi Arabia (KSA) is the epicentre of building services engineering encapsulating the construction industry. On rise of technological advancements, engineers have the ease to thoroughly investigate engineering aspects. Not only engineers, but other stakeholders, tender related people, financial analysts work in parallel as well. However, there are some factors that are stumbling blocks in the way of progression including delaying factors in the construction industry. The paper provides deep insights of delaying factors regarding public building projects of the KSA. Collection of primary data was carried out by conducting a survey which comprised of 63 chief delay factors. Professionals related to construction industry were asked for ranking the factors in terms of their frequency of occurrence and degree of impact. Seven groups of risk factors are categorized and a correlation analysis is performed by identifying the correlation amongst the variables. Finally, 31 leading delay factors are extracted and reported.

A Study on Implementation Delay Factors of the Block-unit Housing Renewal Project - Focused on the Incheon Metropolitan City - (가로주택정비사업의 사업시행 지연요인에 관한 연구 - 인천광역시 사례를 중심으로 -)

  • Han, Young Hoon;Na, In Su
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.32-40
    • /
    • 2022
  • The block-unit housing renewal project was presented as an alternative method to overcome the side effects of large-scale renewal projects while improving poor residential conditions. However, projects implementation is prolonged and even the pace of projects, which was considered an various incentives, is being delayed for the most part. In this study, delay factors are drawn by eight; conflict among association members, contract delay of joint implementation, participation paucity of constructor, inadequate project guidelines, alteration of project plan, lack of renewal project professionals, stricter loan restriction of HUG, lack of capacity of project operator. We categorized those eight factors to three aspects such as implementation, participants and proposition and suggested improvement alternatives according to three aspects.

A Study on the Consumer's Purchasing Motives toward Casual Hanbok - in the areas of Pusan - (생활한복의 구매동기에 관한 연구 -부산지역을 중심으로-)

  • 최은경
    • Journal of the Korean Society of Costume
    • /
    • v.45
    • /
    • pp.71-84
    • /
    • 1999
  • This study was to identify the dimensions of consumer's purchasing motives and purchasing delay reasons toward casual hanbok. Other objective was to examine relationship between these variables and future purchasing intention. Th 22 purchasing motive questions and 19 purchasing delay reasons were selected through the result of self-questionnaire analysis. 302 purchaser and 297 consumers who delay for particular reasons in Pusan responsed to the second questionnaire of purchasing motives and purchasing delay reasons toward casual Hanbok. The results as follows: 1. For factor analysis 22 purchasing motive questions were subjected to the principle component analysis with orthogonal rotation after extraction of 6 major factors. Six dimensions are consciousness of nation goodness of design conformity with fashion charming apperance relaxation fo body and mind nation goodness of design conformity with fashion charming appearance relaxation of body and mind and pursuit of individuality. These factors explained 62.0% of total variables. 2. Consumer's purchasing motives such as consciousness of nation goodness of design charming appearance and relaxation of body and mind has predicting power to the re-purchasing intention of casual hanbok 3. For factor analysis 19 delay reason question were subjected to the principle component analysis with orthogonal rotation after extraction of 5 major factors. Five dimensions are non-fitness for occasion and body shape unsatisfaction with design unsatisfaction with price need of information search for better product and preference for traditional hangok. These factors explained 60.4% of total variables. 4. Delay reasons of unsatisfaction with design and price were positively related to the future purchasing intention. This delay reason is caused by forces external to the consumer and the consumer has engaged in information search. This result explained this type of consumer has the strong future purchasing intention.

  • PDF

A Study on the Priority Analysis of Work Delay Factors in Steal-frame Work using FMEA (FMEA를 활용한 철골공사 작업지연요인의 중요도에 관한 연구)

  • Lee, Hyun-Chul;Lee, Jae-Hong;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.91-101
    • /
    • 2009
  • The factors of uncertainty such as work delay could cause many problems, for example, increase of construction cost and terms of work, and the deterioration of quality. Because of these, the uncertainty risk is regarded as an important management factor to obtain the success of construction project. So, the systematic management plan about the uncertainty factors is needed because it plays an important role in the completion of entire project. And also analysis of some factors which can cause the work delay can be one way of improving construction project's certainty and making it competitive. In this reason, we have to make an effort to set a priority based on analysis of quantitatively numerical value about work delay factors to manage them effectively. Thus, this study aims to suggest the basic data for the effective management and prevention of work delay in steel-frame work which is progressive actively now, along with increasing of demand of high-rise buildings by analyzing each reasons of work delay factors and also by suggesting important management factors that are coded according to each construction work using FMEA method which could give a data about the importance of work delay factors through quantitatively numerical value.

Investigating Main Causes for Schedule Delay in Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.33-46
    • /
    • 2014
  • Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.

A COMPARATIVE STUDY OF DELAYS FACTORS IN PROJECT COMPLETION IN LIBYA AND UK CONSTRUCTION INDUSTRY

  • Shebob, A;Dawood, N; Xu, Q
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.614-620
    • /
    • 2011
  • Delays in completing construction projects have significant financial and social impact to all parties involved in the construction process and in particular in developing countries. This is very evident in most construction projects in Libya and in both public and private sectors. The research study was initiated by Libyan Government and the main aim of the project is to develop a new strategy in reducing the impact of delay factors. In order to achieve this, a number of objectives have been set-to conduct a comprehensive literature survey, to conduct a comparative study of the delay factors in project completion in both Libya and UK using semi structured questionnaire and finally, to identify and analyse the causes of delay and ranked them using frequency of occurrence and severity. The critical causes of delay for construction projects were quite different between Libya and UK. For the former, the most critical causes of delay in Libyan construction industry were low skills of manpower, changes in the scope of the project, slowness in giving instruction and poor qualification of consultant, while for the latter they were financial problems, bad weather conditions on the job site and change in the scope of project. Statistical experiments including Paired Samples T-Test, was run to test the significance of the survey data in both countries Libya and UK. The statistical results confirmed the collected data from the survey were significant.

  • PDF

Analysis of Progress Schedule and Delay Element of Frame Works in Apartments (아파트 구체공사의 공정관리 및 공기지연요소 분석에 관한 연구)

  • 최은준;최민권;조형근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.157-160
    • /
    • 2003
  • In order to reduce the construction cost and period without degrading the quality, construction companies are making a lot of efforts to prefabricate and mechanize the construction process, and introducing and utilizing various techniques of construction time management in the process of construction. However, due to the various factors (such as weather conditions, labor factors, supply of equipment and materials, safety accident, etc) in the process of construction, construction projects are not frequently completed within the scheduled Period. This research is to examine the current status of construction time management and factors causing delay in construction with regard to the concrete work (such as form work, steel reinforcement, and concrete work) in building apartments.

  • PDF

Factors Delaying Presentation of Sudanese Breast Cancer Patients: an Analysis Using Andersen's Model

  • Salih, Alaaddin M;Alfaki, Musab M;Alam-Elhuda, Dafallah M;Nouradyem, Momin M
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.4
    • /
    • pp.2105-2110
    • /
    • 2016
  • Purpose: A multicenter, observational, cross-sectional study was conducted to assess factors delaying presentation of breast cancer cases. Materials and Methods: Data were collected from a pair of highly specialized referral centers, both located in the center of the Sudanese capital, Khartoum. For a total of 153 eligible respondents, durations of delay, clinicodemographic factors and reasons of referral were collected from our respondents through self-administered questionnaires. Logistic regression analysis and ANOVA were used to test the relation between periods of delay and different factors. Odd ratios (OR's) and their correspondent Confidence intervals (95% CI's). Delay periods were studied with Andersen's model. Results: The average duration of delay in our study was 11.9 (${\pm}11.2$) months. Only a quarter of our patients presented early within the first 3 months after onset of their symptoms. About 47.7% arrived later during the course of the first year, while it took beyond that for the last 27% to come. A prior diagnosis of BC was the only predictor of early presentation (for 3-12 months OR=9.6 (p<0.00), 95% CI 9.55-9.75; for >12 months OR=9.3 (p<0.00), 95% CI 9.33-9.33). Out of the 12 different reasons for delay given by our respondents, none showed a significant difference between patients presenting early or late. Financial incapacity (17.5%), ignorance about BC (14.3), and misinterpreting symptoms (12.7%) were the top three whys of delay. Conclusions: Our findings support existence of a non-uniform pattern of delay among Sudanese BC patients. Changing currently adopted awareness elevating strategies into much more inclusive approaches is strongly recommended.