• Title/Summary/Keyword: data management plans

Search Result 805, Processing Time 0.028 seconds

Accelerated Life Test Plans Based on Small Sample Property

  • Yun, Won Young
    • Journal of Korean Society for Quality Management
    • /
    • v.23 no.1
    • /
    • pp.41-49
    • /
    • 1995
  • This paper suggests optimal accelerated constant stress life tests in Exponential distribution. The relationship between the log-mean life and the loaded stress is assumed to be linear. Optimal plans considering mean square errors of maximum likelihood estimators of the log mean life and test costs are obtained. We consider accelerated life tests with two stress levels, and as data types, failure censoring( type II) and time censoring(type I) data are used. We propose the procedure to obtain the optimal plans for each case. Some examples are also included.

  • PDF

The effect of informal grandparent-provided child care and support on married women's additional birth plans: A panel data analysis (조부모에 의한 비공식 자녀돌봄 및 지원이 기혼여성의 추가출산 계획에 미치는 영향: 패널분석 방법을 이용하여)

  • Han, Young-Sun;Lee, Yon-Suk
    • Journal of Family Resource Management and Policy Review
    • /
    • v.18 no.2
    • /
    • pp.163-182
    • /
    • 2014
  • This study examined the effects of informal grandparent-provided child care and support on married women's additional birth plans. This study applied panel data analysis to three waves of the Korean Longitudinal Survey of Women and Family (KLoWF) and obtained two major findings, as follows. First, having a mother-in-law and co-residing with parents-in-law had a positive influence on married working women's additional birth plans. Child care provision from the parents of a married working woman also positively influenced her additional birth plans. Second, the analysis showed that housework assistance from a woman's mother-in-law or mother had no effect on her birth plans in both models investigated: the additional birth plan model for all women, both employed and unemployed, and the additional birth plan model for only working women. In conclusion, the findings of this study demonstrated that child care availability, with grandparents as the trusted providers, is a more important factor in married women's additional birth plans than housework assistance from their mothers-in-law and mothers.

Optimal Road Maintenance Section Selection Using Mixed Integer Programming (혼합정수계획법을 활용한 도로포장 보수구간 선정 최적화 연구)

  • Cho, Geonyoung;Lim, Heejong
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.65-70
    • /
    • 2017
  • PURPOSES : Pavement Management System contains the data that describe the condition of the road. Under limited budget, the data can be utilized for efficient plans. The objective of this research is to develop a mixed integer program model that maximizes remaining durable years (or Lane-Kilometer-Years) in road maintenance planning. METHODS : An optimization model based on a mixed integer program is developed. The model selects a cluster of sectors that are adjacent to each other according to the road condition. The model also considers constraints required by the Seoul Metropolitan Facilities Management Corporation. They select two lanes at most not to block the traffic and limit the number of sectors for one-time construction to finish the work in given time. We incorporate variable cost constraints. As the model selects more sectors, the unit cost of the construction becomes smaller. The optimal choice of the number of sectors is implemented using piecewise linear constraints. RESULTS : Data (SPI) collected from Pavement Management System managed by Seoul Metropolitan City are fed into the model. Based on the data and the model, the optimal maintenance plans are established. Some of the optimal plans cannot be generated directly in existing heuristic approach or by human intuition. CONCLUSIONS:The mathematical model using actual data generates the optimal maintenance plans.

Plans for establishing a database for Managing Railway System Safety (철도시스템 안전관리를 위한 데이터베이스 구축 방안 연구)

  • Hong Seon-Ho;Kim Sang-Ahm
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.605-611
    • /
    • 2005
  • System safety management to secure complicated system safety such as railway and nuclear includes various factors. Those are prevention of accidents, faults management, human factor, men-machine relation, organization factor, safety culture, quality/quantity safety performance goal, and safety regulations. To manage them, it is required that database which is based on most analysis is established. Therefore system safety could be controlled. This research defines data required to safety management, and that is aimed at deriving plans in order to establish them as database. To accomplish that, safety information management of other systems such as aviation and marine is reviewed. Also, the present conditions of available data in the filed of domestic railway are analysed, and then it provides plans for. establishing database to build up advanced railway system safety information management systems.

  • PDF

Machine-actionable Data Management Plans Model Analysis and Improvement Direction

  • Kim, Suntae
    • Journal of Information Science Theory and Practice
    • /
    • v.8 no.4
    • /
    • pp.20-28
    • /
    • 2020
  • In this study, the RDA DMP Common Standard (RDCS), a data model for implementing a machine actionable Data Management Plan (maDMP), was analyzed in four aspects. First, the twelve class models proposed by RDCS were analyzed. Second, whether the DMP attribute was included in the class attribute was analyzed. Third, we analyzed the namespace used for RDCS properties. Fourth, the values and identifiers used in RDCS properties were analyzed. As a result of the analysis, four directions for improvement were derived. First, it is necessary to add an academic record class to describe information such as papers and reports, which are representative academic documents. Second, the primary research institution, responsibility, resources, option attribute, and additional attributes are needed to describe the researcher's affiliation information. Third, it is necessary to additionally use a namespace such as Friend of a Friend that can be used universally. Fourth, the use of digital object identifier should be considered to identify academic literature.

A Study on Activation Policy of Smart Construction Safety Cost by Analyzing Actually Estimated Amount in Safety Management Plan (스마트건설안전 비용의 안전관리계획서 계상 현황 분석을 통한 활성화 방안 연구)

  • Won, Jeong-Hun;Jang, Nam Gwon;Yu, Ji Young
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.3
    • /
    • pp.34-44
    • /
    • 2022
  • This study analyzed the smart construction safety cost included in safety management plans that are approved before construction. Specifically, it refers to the cost incurred in constructing and operating a safety management system using wireless communication and facilities. Based on the obtained statistical results, an activation policy for the inclusion of the smart construction safety cost in building safety management plans was proposed. The smart construction safety cost must be included in the safety management cost; notably, this is mandated by the Construction Technology Promotion Act. However, there are some problems with the inclusion of smart construction safety costs. To analyze the problems encountered when calculating the smart construction safety cost and including it in safety management plans, in this study, statistical analysis was performed using the data of 1,334 safety management plans received at the Construction Safety Management Integrated Information (CSI) from June to August 2021. The results show that only 50.7% of the safety management plans included the smart construction safety cost although the current law mandates 100% inclusion of these costs. Thus, it is apparent that the smart construction safety costs are only included in a low proportion of sites. In addition, the calculated smart construction safety costs were shown to have a small correlation with the construction cost; moreover, they appeared to be distributed at a constant cost level. In this context, it is believed that perfunctory cost calculations were performed at most sites since the effect of the construction cost on the smart construction safety cost was negligible. Therefore, it is necessary to improve the inclusion of smart construction safety costs by strengthening the authorization process of the approval institute of safety management plans. In addition, institutional support, such as guidelines that promote the calculation and inclusion of appropriate smart construction safety costs according to the characteristics of sites, are needed.

A Study on the Development of the Template for creating the Data Management Plans (데이터 관리 계획 작성을 위한 템플릿 개발에 관한 연구)

  • Kim, Juseop;Kim, Suntae
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.55 no.3
    • /
    • pp.373-396
    • /
    • 2021
  • The government is establishing a national governance system so that research data can be systematically preserved and reused as a national asset. Recently, as DMP submission has become mandatory in some research institutes, it is a reality that DMP preparation is becoming a necessity for researchers. Therefore, the purpose of this study is to develop a template so that the researcher can easily write the DMP that must be submitted when planning the project. To develop such a DMP template, 27 domestic and foreign DMP templates were investigated and analyzed, and as a result, a DMP template for domestic researchers was proposed. It is judged that the DMP template proposed as a result of this study can be used as an exemplary case that can be used in other research institutes and universities.

The Improvement of Wetland Conservation Plan for Upo Wetland Protected Area (우포늪 습지보호지역 보전계획 개선방안)

  • Kim, Su-Ryeon;Song, Won-Kyong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.4
    • /
    • pp.65-80
    • /
    • 2019
  • The Wetland Conservation Plan is used as a tool to set the management direction of wetland protected areas, and which is establishing a plan for the conservation, wise-use, and management based on wetland's condition. This study was conducted to establish a conservation plan considering the functions and management conditions of Upo wetland protected area. To this end, there are analyzed the current issues, plans and implementation status of Upo Wetland Conservation Plans in the past. The management elements to be considered in establishing the Wetland Conservation Plan were selected through prior research analysis and the priority of those elements was identified through the AHP. As a result, it was found that lack of considering the changes and performance evaluation of the existing plans in wetlands, conducting short-term projects related to maintenance original function of wetland, different management methods for wetland protected areas and other adjacent areas, lack of understanding and cooperation by stakeholders, inconsistencies in timing of the Conservation Plan and survey of wetland protected areas. In order to improve the problem, it needs to include the performance evaluation stage of establishing the conservation plan, strengthen cooperation of stakeholders and expertise, continuing of projects for wetlands' maintenance, priority of the project considering the management side, and to adjust the timing of plans to improve data availability.

The Impact of Difference of Linkages between Manufacturing Strategy and Action Plans - An Empirical Comparison of U.S. and Korean Manufacturers -

  • Lee, Sang-Gun;Lee, Choong-Kwon;Park, Boo-Ho
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.5 no.4
    • /
    • pp.81-93
    • /
    • 2000
  • It is important to find the competitive priority, which makes a great contribution to the action plans. The reason is that this makes it possible to provide Korean manufacturers with effective behavioral model to break through the depression after 1997'financial crisis in Korea. Focused priority has become a focus of organizations faced with the need to survive in a highly uncertain business environment characterized by rapid technological change, global competition, and demanding customers. Many believe that better linkages of priority and action plans are fundamental to surviving in the world market. However, there was little previous research dealing with the relationship between the strategic priority and action plans in the view of competitive weapon. This study presents empirical findings on differences between U.S. and Korean manufacturing approach to relationship of priority and plans. Specially, Korean manufacturers are eager for good model to overcome depression of 1997' financial crisis in Korea. Data was collected as part of the Manufacturing Futures Project completed in 1996. The results indicate that U.S. manufacturers maintain focused linkages from priority to action plans than do Korean manufacturers.

  • PDF

Automated Data Analysis of Floor Plans for the Remodeling of Apartment Housing

  • Seo, Wonseok;Kim, Seongah;Park, Junseok;Kim, Jinyoung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1059-1066
    • /
    • 2022
  • In 2020, it was estimated that more than 2.4 million households in South Korea are over 30 years old. That is, more than 40% of all houses in Korea are old and that they require proper rehabilitation. The two options to improve poor living conditions are reconstruction and remodeling. Compared to reconstruction, remodeling has advantages in terms of the construction period, cost, and environmental impact. As such, the current Korean regulations are more favorable for remodeling than reconstruction. Typically, several candidate floor plans are presented in the early stages of an apartment remodeling project. Extracting information about bearing walls and other structural elements from the multiple plans to compare those plans quantitatively is one of the essential tasks during the early stage of a project. To cope with this task, an automated data extraction method for walls and slabs from before and after remodeling plans is developed. Through the developed program, load-bearing walls, non-bearing walls, slabs, and weight changes after remodeling can be analyzed and visualized in a fast and automated manner.

  • PDF