• Title/Summary/Keyword: dams

Search Result 1,104, Processing Time 0.03 seconds

Development of Measuring System for On-Line Test and Evaluation of High Speed Rail(I) - Hardware (고속철도 시운전시험 및 평가용 측정시스템 개발(I) - 하드웨어)

  • 김석원;김영국;백광선;김진환;한영재
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.168-173
    • /
    • 2002
  • In this paper, we introduce the hardware of the measuring system for on-line test and evaluation of high speed rail. It is composed of 6 DAMs(Data Aquisition modules), 2 monitoring modules and 1 main computer. Each of DAMs is connected many kinds of sensors, such as accelerometers, thermocouples, strain gauges, volt meters, current meter, odermeter, and measures the signals from sensors, saves it and displays it on the displayer. Two monitoring modules monitor the major signals transferred from DAMs. A main computer controls 4 DAMs(DAM1, DAM2, DAM31 and DAM32) and 2 monitoring modules and also monitors the major signals transferred from DAMs.

  • PDF

Prediction of earthquake-induced crest settlement of embankment dams using gene expression programming

  • Evren, Seyrek;Sadettin, Topcu
    • Geomechanics and Engineering
    • /
    • v.31 no.6
    • /
    • pp.637-651
    • /
    • 2022
  • The seismic design of embankment dams requires more comprehensive studies to understand the behaviour of dams. Deformations primarily control this behaviour occur during or after earthquake loading. Dam failures and incidents show that the impacts of deformations should be reviewed for existing and new embankment dams. Overtopping erosion failure can occur if crest deformations exceed the freeboard at the time of the deformations. Therefore, crest settlement is one of the most critical deformations. This study developed empirical formulas using Gene Expression Programming (GEP) based on 88 cases. In the analyses, dam height (Hd), alluvium thickness (Ha), the magnitude-acceleration-factor (MAF) values developed based on earthquake magnitude (Mw) and peak ground acceleration (PGA) within this study have been chosen as variables. Results show that GEP models developed in the paper are remarkably robust and accessible tools to predict earthquake-induced crest settlement of embankment dams and perform superior to the existing formulation. Also, dam engineering professionals can use them practically because the variables of prediction equations are easily accessible after the earthquake.

Current Status and Application of Agricultural Subsurface Dams in Korea (국내 농업용 지하댐의 현황 및 활용 사례)

  • Yong, Hwan-Ho;Song, Sung-Ho;Myoung, Woo-Ho;An, Jung-Gi;Hong, Soon-Wook
    • Journal of Soil and Groundwater Environment
    • /
    • v.22 no.3
    • /
    • pp.18-26
    • /
    • 2017
  • The increasing frequency of droughts has been increasing the necessity of utilizing subsurface dams as reliable groundwater resources in areas where it is difficult to supply adequate agricultural water using only surface water. In this study, we analyzed the current status and actual conditions of five agricultural subsurface dams as well as the effect of obtaining additional groundwater from subsurface dams operated as one aspect of the sustainable integrated water management system. Based on the construction methods and functions of each subsurface dam, the five subsurface dams are classified into three types such as those that derive water from rivers, those that prevent seawater intrusion, and those that link to a main irrigation canal. The classification is based on various conditions including topography, reservoir location, irrigation facilities, and river and alluvial deposit distributions. Agricultural groundwater upstream of subsurface dams is obtained from four to five radial collector wells. From the study, the total amount of groundwater recovered from the subsurface dam is turned out to be about 29~44% of the total irrigation water demand, which is higher than that of general agricultural groundwater of about 4.6%.

Dam Inflow Evaluation using Hydrograph Analysis (수문곡선 분리를 통한 댐 유입량 평가)

  • Jung, Younghun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.3
    • /
    • pp.95-105
    • /
    • 2018
  • Understanding the composition of the dam inflow can improve the efficiency of dam operation considering the seasonal characteristics. Hydrograph analysis is one of the methods to identify the characteristics of dam inflow. In addition, baseflow separation on the dam inflow can be affected by anthropogenic influences depending on dam locations. In this regard, the objectives of this study are 1) to analyze yearly and monthly baseflow contribution to the dam inflow and 2) to compare the baseflow contribution to the inflow in dams located upstream and downstream of the watershed. The result shows that the estimated baseflow index was smaller in the upstream dams compared to the downstream dams. Discharge from the upstream water infrastructure including dams and reservoirs can be a part of inflow into the downstream water infrastructure. Based on this scenario, the discharge regulated from the upstream dam could lead to overestimation of baseflow contribution to inflow into the downstream dam. We expect that the results from this study elucidate the role and function of dams and hence, contribute to the efficient operation of dams located in the upstream and the downstream of the watershed.

The Establishment Plan of Strong-Motion Instrumentation of Dams for Monitoring of Seismic Behavior and Taking An Urgent Countermeasure (댐의 지진관측 및 내진대책 수립을 위한 지진계측시스템 구축 방안에 관한 연구)

  • Oh, Byung-Hyun;Lee, Jong-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1588-1595
    • /
    • 2005
  • In this study, the installation location of accelerometer and accelerograph for dam are investigated in the field to establish of emergency action against dam failure when earthquake occur and to guarantee the results of seismic stability of dams which are analysed with dynamic analysis method during 1999 to 2003 by KOWACO. By a comparative study concerning of domestic and foreign guidelines of seismic strong motion instrumentation for dams, "Guidelines of Seismic Strong-Motion Instrumentation Installation, Operation and Maintenance for Dams" is established to set up the standard of seismic strong-motion instrumentation for dam, are supervised by KOWACO There is some problems in taking a measure of stability of dams when earthquake event occur because the existing seismic strong motion instruments are operated independently. This make difficult to confirm the occurrence of seismic event. For that reason, in this study the plan of unified operation and maintenance system for strong-motion instrument for dams is designed. It will make possible real-time seismic monitoring, data transmission and receiving, giving warning for earthquake, and exchanging data with national seismic network.

  • PDF

Reproductive Toxicity Study of DA-125, A New Anthracycline Anticancer Agent: (I) Teratogenicity Study in Rats (새로운 안트라사이클린계 항암제 DA-125의 생식독성연구: (I) 랫트 최기형시험)

  • 정문구;한상섭;양중익;노정구
    • Biomolecules & Therapeutics
    • /
    • v.2 no.1
    • /
    • pp.82-93
    • /
    • 1994
  • DA-125, a new anthracycline antitumor antibiotic, was at dose levels of 0, 0.1, 0.3 and 1.0 mg/kg/day administered intravenously to pregnant Sprague-Dawley rats during the organogenetic period. Two-third of dams per group were subjected to caesarean section on day 20 of pregnancy and the remaining 10 dams per group were allowed to deliver. Effects of test substance on dams, embryonal development of Fl fetuses, as well as growth, behaviour and mating performance of Fl offspring were examined. 1. At 1 mg/kg, one out of the 10 dams showed difficult delivery. A decrease in food consumption, a loss in body weight and a decrease of spleen weight were found in this dose level group. At 0.3 mg/kg, difficult deliverys were observed in two out of the 10 dams. 2. At 1 mg/kg, an increased resorption rate and a decreased fetal weight were found. In addition, various types of external, visceral and skeletal malformations occurred at an incidence of 11.9, 41.8 and 14.5%, respectively. 3. At 1 mg/kg, body weight reduction, small eyeball, hydrocephalus and atrophy of sexual organs were observed in Fl offspring. One male pup receiving 0.3 mg/kg died on day 2 of lactation. The results show that the no-effect dose levels (NOELs) for dams and Fl offspring are 0.1 mg/kg/day and NOEL for Fl fetuses is 0.3 mg/kg/day.

  • PDF

A Teratogenicity Study on Original Woo-Whang-Chung-Sim-Won in Rats (원방우황청심원의 랫드 최기형성에 관한 연구)

  • 한순영;박귀례;신재호;김판기;권석철;장성재
    • Toxicological Research
    • /
    • v.13 no.4
    • /
    • pp.331-338
    • /
    • 1997
  • A teratogenic study on Original Woo-Whang-Chung-Sim-Won was carried out in SpragueDawley rats. Original Woo-Whang-Chung-Sim-Won suspended in distilled water was administered to pregnant dams by oral gavage during organogenesis period (from 7th to 17th day of gestation) at daily doses of 1/9, 1/3 and I pill/kg. About two-thirds of dams were sacrificed at 20th day of gestation to scrutinize the pregnant performances and fetal development, and the remaining dams were allowed to deliver. The growth, reflex, behaviour and reproductive function of F1 offsprings were examined. There was no treatment-related difference in body weight, food consumption and necropy findings of dams. No gross, skeletal and visceral abnormalities was observed in F1 fetuses from dams treated with Original Woo-Whang-Chung-Sim-Won. F1 offsprings did not show any treatment-related difference in growth, reflex, behaviour and reproductive peuformance. At caesarean section of F1 dams, no growth retardation and gross abnormality was observed in F2 fetuses. In conclusion, Original Woo-Whang-Chung-Sim-Won did not show any potential teratogenic activity in rats.

  • PDF

Vibration based damage identification of concrete arch dams by finite element model updating

  • Turker, Temel;Bayraktar, Alemdar;Sevim, Baris
    • Computers and Concrete
    • /
    • v.13 no.2
    • /
    • pp.209-220
    • /
    • 2014
  • Vibration based damage detection is very popular in the civil engineering area. Especially, special structures like dams, long-span bridges and high-rise buildings, need continues monitoring in terms of mechanical properties of material, static and dynamic behavior. It has been stated in the International Commission on Large Dams that more than half of the large concrete dams were constructed more than 50 years ago and the old dams have subjected to repeating loads such as earthquake, overflow, blast, etc.,. So, some unexpected failures may occur and catastrophic damages may be taken place because of theloss of strength, stiffness and other physical properties of concrete. Therefore, these dams need repairs provided with global damage evaluation in order to preserve structural integrity. The paper aims to show the effectiveness of the model updating method for global damage detection on a laboratory arch dam model. Ambient vibration test is used in order to determine the experimental dynamic characteristics. The initial finite element model is updated according to the experimentally determined natural frequencies and mode shapes. The web thickness is selected as updating parameter in the damage evaluation. It is observed from the study that the damage case is revealed with high accuracy and a good match is attained between the estimated and the real damage cases by model updating method.

Flood Routing of Sequential Failure of Dams by Numerical Model (수치모형을 이용한 순차적 댐 붕괴 모의)

  • Park, Se Jin;Han, Kun Yeun;Choi, Hyun Gu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.1797-1807
    • /
    • 2013
  • Dams always have the possibility of failure due to unexpected natural phenomena. In particular, dam failure can cause huge damage including damage for humans and properties when dam downstream regions are densely populated or have important national facilities. Although many studies have been conducted on the analysis of flood waves about single dam failure thus far, studies on the analysis of flood waves about the sequential failure of dams are lacking. Therefore, the purpose of this study was to calculate the peak discharge of sequential failure of dams through flood wave analysis of sequential failure of dams and this analysis techniques to predict flood wave propagation situation in downstream regions. To this end, failure flood wave analysis were conducted for Lawn Lake Dam which is a case of sequential failure of dams among actual failure cases using DAMBRK to test the suitability of the dam failure flood wave analysis model. Based on the results, flood wave analysis of sequential failure of dams were conducted for A dam in Korea assuming a virtual extreme flood to predict flood wave propagation situations and 2-dimensional flood wave analysis were conducted for major flooding points. Then, the 1, 2-dimensional flood wave analysis were compared and analyzed. The results showed goodness-of-fit values exceeding 90% and thus the accuracy of the 1-dimensional sequential failure of dams simulation could be identified. The results of this study are considered to be able to contribute to the provision of basic data for the establishment of disaster prevention measures for rivers related to sequential failure of dams.

Improvement of Water Supply Capability of the Nakdong River Basin Dams with Weirs (보를 포함한 낙동강 다목적댐 용수공급능력 개선에 관한 연구)

  • Jang, Cheol-Ho;Kim, Young-Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.637-644
    • /
    • 2016
  • This study sought to reevaluate the water supply capacities of the Nakdong river dams, and identify measures to remedy any shortages using weirs, focusing on 5 multipurpose dams and 8 weirs. The reevaluation of the dams was performed by the HEC-5 program using the original design criteria and inflow data recorded for each dam. The results show that the capacities of the 3 dams has decreased to 73~87%. Three simulations were performed to determine the effect of coordinating the dams and weirs. The first simulation was based on individual operation of the dams; the second on coordinated operation of the dams; and the third on coordinated operation of the dams and weirs. To obtain a water supply reliability of 95%, the annual water shortage was calculated for a 20-year period (1992~2011). In addition, long-term runoff simulation data used in the national river basin investigation by the Ministry of Land, Infrastructure and Transportation were used with the dam discharge data, because long-term inflow data for the weirs were not available. The simulations were performed by the HEC-ResSim program, with the reservoir network divided into 2 groups based on the Waegwan water station. The results show that water supply capacity for the 3 simulations to be $2424Mm^3/yr$, $2612Mm^3/yr$ and $2734Mm^3/yr$, respectively. This indicates that coordinated operation of the dams and weirs could provide an additional water supply of $122Mm^3/yr$.