• Title/Summary/Keyword: dam storage

Search Result 241, Processing Time 0.027 seconds

Identification of Uncertainty on the Reduction of Dead Storage in Soyang Dam Using Bayesian Stochastic Reliability Analysis (Bayesian 추계학적 신뢰도 기법을 이용한 소양강댐 퇴사용량 감소의 불확실성 분석)

  • Lee, Cheol-Eung;Kim, Sang Ug
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.3
    • /
    • pp.315-326
    • /
    • 2013
  • Despite of the importance on the maintenance of a reservoir storage, relatively few studies have addressed the stochastic reliability analysis including uncertainty on the decrease of the reservoir storage by the sedimentation. Therefore, the stochastic gamma process under the reliability framework is developed and applied to estimate the reduction of the Soyang Dam reservoir storage in this paper. Especially, in the estimation of parameters of the stochastic gamma process, the Bayesian MCMC scheme using informative prior distribution is used to incorporate a wide variety of information related with the sedimentation. The results show that the selected informative prior distribution is reasonable because the uncertainty of the posterior distribution is reduced considerably compared to that of the prior distribution. Also, the range of the expected life time of the dead storage in Soyang Dam reservoir including uncertainty is estimated from 119.3 years to 183.5 years at 5% significance level. Finally, it is suggested that the improvement of the assessment strategy in this study can provide the valuable information to the decision makers who are in charge of the maintenance of a reservoir.

Parameter Decision of Muskingum Channel Routing Method Based on the Linear System Assumption (선형시스템가정에 근거한 Muskingum 하도추적방법의 매개변수 결정)

  • Yoo, Chulsang;Sin, Jiye;Jun, Chang Hyun
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.5
    • /
    • pp.449-463
    • /
    • 2013
  • This study proposes the method for determining the Muskingum channel routing model parameters based on the assumption of linear system. The proposed method was applied to the Chungju dam basin for the evaluation. Additionally, the rainfall-runoff was repeated for the Yeongchun-Chungju dam reach using seven rainfall events observed. Summarizing the results is as follows. First, the concentration time and storage coefficient of a channel reach formed by the subdivision can be expressed as the difference between the concentration times and storage coefficients of upstream and downstream basins. The storage coefficients of the channel reach estimated is equal to the storage coefficient of the Muskingum channel routing model and the weight factor can be simply estimated using the ratio between the concentration time and storage coefficient. Second, the weight factor of the Muskingum model is in inverse proportion to the Russel coefficient, which is in between 0.4166 and 0.625 when considering the Russel coefficients generally applied. Finally the application to the Yeongchun-Chungju dam reach showed that the proposed method is still valid regardless of the limitations such as the uncertainty of the observed data.

Economic Analysis of Dam Operation Improvement by Dam Downstream River Improvement Works (II)-Economic Benefit and Cost Allocation Analysis (댐하류하천정비사업의 댐 운영개선 효과 경제성 분석 (II) -경제적 편익 및 비용분담률 분석)

  • Yoo, Seung-Hoon;Lee, Gwang-Man;Lee, Eul-Rae
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.9
    • /
    • pp.765-776
    • /
    • 2011
  • Flood discharge capacity in a dam downstream reach has been decreased after dam construction because of the river cross section reduction impacted by farm lands, sand-bars and parking lots, etc. in river flood plains. Those obstacles being in the river inside areas have caused negative influences to the dam operation policy. Therefore, the dam downstream river improvement work associated with the dam operation improvement plan is under construction for removing reduction factors on the dam effective storage, assuring flood safety in the dam downstream river and incrementing dam operation benefits. But the project has issued some problems such as project feasibility, economic evaluation, cost allocation and benefit share, etc. Since a dam enterpriser has not committed such kind of project before, it is necessary to set up an objective analysis process and a quantitative financial valuation. This study examines the measurable economic benefits and the cost allocation of the project for the fairness between benefit owners (central government and water electricity enterprisers). As a result, the total economic benefit from 3 dams (Imha, Daechung and Youngdam Dam) accounts for 14.41 Billion Won/year. The financial valuation of K-water as a project enterpriser is approximately estimated at 40% of the total value and the government is 60%.

Bhumipol Dam Operation Improvement via smart system for the Thor Tong Daeng Irrigation Project, Ping River Basin, Thailand

  • Koontanakulvong, Sucharit;Long, Tran Thanh;Van, Tuan Pham
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.164-175
    • /
    • 2019
  • The Tor Tong Daeng Irrigation Project with the irrigation area of 61,400 hectares is located in the Ping Basin of the Upper Central Plain of Thailand where farmers depended on both surface water and groundwater. In the drought year, water storage in the Bhumipol Dam is inadequate to allocate water for agriculture, and caused water deficit in many irrigation projects. Farmers need to find extra sources of water such as water from farm pond or groundwater as a supplement. The operation of Bhumipol Dam and irrigation demand estimation are vital for irrigation water allocation to help solve water shortage issue in the irrigation project. The study aims to determine the smart dam operation system to mitigate water shortage in this irrigation project via introduction of machine learning to improve dam operation and irrigation demand estimation via soil moisture estimation from satellite images. Via ANN technique application, the inflows to the dam are generated from the upstream rain gauge stations using past 10 years daily rainfall data. The input vectors for ANN model are identified base on regression and principal component analysis. The structure of ANN (length of training data, the type of activation functions, the number of hidden nodes and training methods) is determined from the statistics performance between measurements and ANN outputs. On the other hands, the irrigation demand will be estimated by using satellite images, LANDSAT. The Enhanced Vegetation Index (EVI) and Temperature Vegetation Dryness Index (TVDI) values are estimated from the plant growth stage and soil moisture. The values are calibrated and verified with the field plant growth stages and soil moisture data in the year 2017-2018. The irrigation demand in the irrigation project is then estimated from the plant growth stage and soil moisture in the area. With the estimated dam inflow and irrigation demand, the dam operation will manage the water release in the better manner compared with the past operational data. The results show how smart system concept was applied and improve dam operation by using inflow estimation from ANN technique combining with irrigation demand estimation from satellite images when compared with the past operation data which is an initial step to develop the smart dam operation system in Thailand.

  • PDF

Flood Inflow Estimation at Large Multipurpose Dam using Distributed Model with Measured Flow Boundary Condition at Direct Upstream Channels (직상류 계측유량경계조건과 분포형모델을 이용한 대규모 다목적댐 홍수유입량 산정)

  • Hong, Sug-Hyeon;Kang, Boosik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.5
    • /
    • pp.1039-1049
    • /
    • 2015
  • The inflow estimation at large multipurpose dam reservoir is carried out by considering the water balance among the discharge, the storage change during unit time interval obtained from the observed water level near dam structure and area-volume curve. This method can be ideal for level pool reservoir but include potential errors when the inflow is influenced by the water level slope due to backwater effects from upstream flood inflows and strong wind induced by typhoon. In addition, the other uncertainties arisen from the storage reduction due to sedimentation after the dam construction and water level noise due to mechanical vibration transmitted from the electric power generator. These uncertainties impedes the accurate hydraulic inflow measurement requiring exquisite hydrometric data arrangement for reservoir waterbody. In this study, the distributed hydrologic model using UBC-3P boundary setting was applied and its feasibility was evaluated. Finally, the modeling performance has been verified since the calculated determination coefficient has been in between 0.96 to 0.99 after comparing with observed peak inflow and total inflow at Namgang dam reservoir.

Real time forecasting of rainfall-runoff using multiple model adaptive estimation (다중모델적응추정방식을 이용한 강우-유출량의 실시간 예측)

  • 최선욱;김운해;김영철
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.24-27
    • /
    • 1996
  • The storage function method(SFM) is one of hydrologic flood routings which has been used most widely in Korea and Japan. This paper presents a storage function method using multiple model adaptive estimation(MMAE), in which a model set is generated by partitioning storage parameters over feasible range, and each storage function model is estimated, and then the weighted average of them is calculated. Finally, the future runoff is predicted in real time by means of observed data of water level at dam and rainfall. Simulation results applied to actual data show that the proposed method has much better performance than that of conventional SFM.

  • PDF

A Study of Operation Standard and Method of Small Dams (소규모 댐의 운영기준 및 기법 연구)

  • Kim, Phil-Shik;Kim, Sun-Joo;Lee, Joo-Yong
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.260-265
    • /
    • 2005
  • The purpose of this study is to established a storage management method and operation standard for irrigation dams occupying the largest portion of small dams using storage management system. The system can be applied to seongju dam for effective management. The storage management method was established considering hydrology simulation and statistical analysis using the system. This method and operation standard are capable of analyzing additional available water, considering the water demand and supply of basin actually. It can improve the flood control capacity and water utilization efficiency by the flexible operation of storage space.

  • PDF

Optimum Size Analysis for Dam Rehabilitation Using Reliability Analysis (신뢰성 분석을 통한 기존 댐 재개발의 적정규모 결정의 관한 연구)

  • Kwon, Hyun-Han;Moon, Young-Il;Choi, Byung-Gyu;Yoon, Yong-Nam
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.2
    • /
    • pp.97-110
    • /
    • 2005
  • This paper presents a procedure of evaluation of reservoir capacity for additional water storage for dam rehabilitation. One of the techniques on the extension of rainfall has been developed, and the daily stream flows were simulated by the NWS-PC long-term rainfall-runoff model with the input of the extended daily rainfall which was stochastically generated by the nonhomogeneous markov chain model. We peformed a reliability analysis to Guisan dam about the optimal capacity of dam rehabilitation by using performance criteria that Hashimoto et al. (1982) presented. We estimated that the most suitable water level is approximately 155EL.M. suggested that this method can use supplemental methods to estimate optimum dam scale.

Comparison of Water Supply Reliability by Dam Operation Methods (댐 운영방식에 따른 이수안전도의 비교)

  • Choi, Si Jung;Lee, Dong-Ryul;Moon, Jang Won
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.6
    • /
    • pp.523-536
    • /
    • 2014
  • A water supply reliability is mainly influenced by water demand, reservoir storage, and inflow change caused from drought. The water supply reliability can vary depending on the method of dam operation. In Korea, the deficit-supply method which complements water deficit as water shortage occurs in downstream areas has been used for the national water resources master plan using K-WEAP, but the prime flow method, an alternative approach, would show different results of water supply reliability in comparison to the deficit-supply method. The objective of this research is to compare and analyze differences in water supply reliability according to dam operation methods. These results can be used to re-evaluate water supply reliability of dam in a circumstance considering steady dam release for instreamflow in downstream and hydroelectric power generation.

Adaptation Capability of Reservoirs Considering Climate Change in the Han River Basin, South Korea (기후변화를 고려한 한강유역 저수지의 적응능력 평가)

  • Chung, Gunhui;Jeon, Myeonho;Kim, Hungsoo;Kim, Tae-Woong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5B
    • /
    • pp.439-447
    • /
    • 2011
  • It is a main concern for sustainable development in water resources management to evaluate adaptation capability of water resources structures under the future climate conditions. This study introduced the Fuzzy Inference System (FIS) to represent the change of release and storage of reservoirs in the Han River basin corresponding to various inflows. Defining the adaptation capability of reservoirs as the change of maximum and/or minimum of storage corresponding to the change of inflow, the study showed that Gangdong Dam has the worst adaptation capability on the variation of inflow, while Soyanggang Dam has the best capability. This study also constructed an Adaptive Neuro-Fuzzy Inference System (ANFIS) for the more accurate and efficient simulation of the adaptation capability of the Soyanggang Dam. Nine Inflow scenarios were generated using historical data from frequency analysis and synthetic data from two general circulation models with different climate change scenarios. The ANFIS showed significantly different consequences of the release and reservoir storage upon inflow scenarios of Soyanggang Dam, whilst it provides stable reservoir operations despite the variability of rainfall pattern.