• Title/Summary/Keyword: dam storage

Search Result 241, Processing Time 0.027 seconds

Impact of Parameters of Nonlinear Breach Progression Curve on Outflow Rate (저수지 붕괴함수의 매개변수 결정이 유량과 침수범위에 미치는 영향)

  • Lee, Khil-Ha
    • Journal of Environmental Science International
    • /
    • v.28 no.2
    • /
    • pp.211-217
    • /
    • 2019
  • A Numerical modeling approach is usually applied to reproduce the physical phenomena of a fill dam-break. The accuracy of the dam-break model depends on the physical structure that defines input variables such as the storage volume, breach formation and progress, and the parameters of the model, which are subjective as they are prescribed by users. In this study, a sensitivity analysis was performed for the nonlinear breach progression curve that was already developed, which includes four parameters. The study focuses on the two of the parameters which control the breach forming time and peak discharge. The model is coupled with a two-dimensional flood simulation model (FLO-2D) to examine flood coverage and depth. It is generally observed that the parameter ${\beta}$ controls only the breach forming time, the parameter ${\gamma}$ is particularly sensitive to the peak flow.

A Study for Storage Reallocation of Multipurpose Reservoir(I) - Flood Control Storage Analysis (다목적댐 용량 재할당에 대한 연구(I)- 치수용량 분석)

  • Yi, Jae-Eung;Kwon, Yong-Ik;Yoon, Young-Nam;Ahn, Tae-Jin
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.4
    • /
    • pp.273-281
    • /
    • 2004
  • Generally, reservoir storage is allocated according to planned purposes established before construction and operating policies are established through release control. The established reservoir allocation is hardly changed unless the special cases such as raising dam or changed purposes occur It Is, however, likely that public needs and objectives can be changed as time go on, the study for multipurpose reservoir storage reallocation is performed as an alternative to reflect these. In this study, flood control analysis is performed for several alternatives of reallocation for the Daechung multi-purpose reservoir in Geum river. As a result, it is confirmed that flood control capability is not decreased compared to single operation of Daechung reservoir for the same flood condition even if conservation level of Daechung multi-purpose reservoir is increased.

Deformation Measurements of Dam using Terrestrial Laser Scanner (지상레이저스캐너를 이용한 댐의 변위관측)

  • Park, Sae-Hoon;Choi, Duk-Hwa;Han, Dong-Yeob
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.1
    • /
    • pp.645-655
    • /
    • 2009
  • Deformations of the dam have been monitored by control points buried in the upper and lower dam of Samrangjin pumped storage power plant. The horizontal and vertical deformation observations performed in 1997, 2002, 2007 are to identity movements of the dam body by comparing and analyzing control points. For that reason, it was difficult to analyze movements of the dam in detail. Therefore, this research has observed surface of the dam using terrestrial laser scanner and estimate movements of the dam by comparing and analyzing scanned and designed surfaces of the dam since building completion. Vertical deformation of upper dam took place in the middle of ridge of dam, maximum cross section, up to 1.5m. In the middle and middle bottom of the downstream slope, vertical deformation was produced 0.75m around SP4-2 point and 0.5m around SP4-4 point. The maximum subsidence of vertical deformation in the lower dam took place in the middle of ridge of dam and upper part of upstream slope and subsidence was analyzed from -0.4 to -1.0m respectively. The result of this research can be used as initial observation to analyze whole movement of the dam in the future.

Deformation Behavior of Existing Concrete-Faced Rockfill Dam due to Raising (증고에 따른 기존 CFRD 댐체의 변형거동)

  • Shin, Donghoon;Cho, Sungeun;Jeon, Jesung;Lee, Jongwook
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.6
    • /
    • pp.77-83
    • /
    • 2007
  • In this study, deformation behavior of existing concrete face rockfill dam, which is raised to a certain height to enhance storage capacity or to improve hydraulic and hydrologic stability, is examined using numerical analysis method. The results obtained from FEM analysis show a possibility that additional fill at downstram slope of existing CFRD dam body may lead undesirable deformations and stresses in existing dam body, especially in face concrete, such as settlements in upper part and bulging in lower part, excessive bending moments, and eventualy tensile cracks. Therefore, in designing multi-staged raising construction of CFRD, it is essential to consider deformations and stresses to be developed within and between exisiting dam body and added parts due to additional fill, and to prepare a proper measure to prevent abnormal deformations and stresses in the dam body including added parts.

  • PDF

Hydrological Stability Analysis of the Existing Soyanggang Multi-Purpose Dam (소양강 다목적댐의 수문학적 안정성 검토)

  • 고석구;신용노
    • Water for future
    • /
    • v.28 no.3
    • /
    • pp.187-195
    • /
    • 1995
  • This study aims at suggesting an alternative to improve current capacity of flood control for the existing Soyanggang multi-purpose dam which was constructed 20 years ago as a largest dam in Korea. The newly estimated value of the probable maximum precipitation(PMP) is 760.0 mm which is based on the hydrometeorological method. The peak inflow of 1000 years return period at the time of construction was 13,500$m^3$/s. However, the newly estimated peak inflow of the PMF is 18,100$m^3$/s which is 1.34 times bigger than the original one. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared; (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing one, (3) raising the existing dam crest, (4) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang multipurpose dam. The preliminary evaluation of these alternatives resulted in that the second alternative is most economical and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multi-purpose dam, a detailed study of an additional spillway tunnel has to be followed.

  • PDF

Effect of Flow-Regime Change due to Damming on the River Morphology and Vegetation Cover in the Downstream River Reach: A case of Hapchon Dam on the Hwang River (댐 건설에 의한 유황 변화에 따른 하류 하도에서 하천지형학적 변화 및 식생피복의 변화: 황강 합천댐 사례)

  • Choi, Sung-Uk;Yoon, Byung-Man;Woo, Hyo-Seop;Cho, Kang-Hyun
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.1
    • /
    • pp.55-66
    • /
    • 2004
  • The Hapchon Dam, located upstream of the Hwang River, Korea, was constructed in December, 1988. Due to the lack of storage of water, the dam gate has not been operated during last ten years. Thus, a new ecosystem has been established at the downstream part of the dam. This is not a common phenomenon which can be found elsewhere in the country. The present study investigates the effect of flow regime change on the river morphology and vegetation cover in the downstream river reach after the dam construction. The analysis of flow regime is carried out, and the changes in bed elevation and in channel cross sections are examined. Site investigations including tree ring tests are also performed. The increase in the vegetation cover is estimated by comparing aerial photographs taken before and after dam construction.

Performance Evaluation of Water Supply for a Multi-purpose Dam by Deficit-Supply Operation (물 부족량 공급 운영 방식에 의한 다목적댐 물 공급의 안정성 평가)

  • Lee, Dong Ryul;Moon, Jang Won;Choi, Si Jung
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.2
    • /
    • pp.195-206
    • /
    • 2014
  • In this study, a performance evaluation method of water supply for a multi-purpose dam based on deficitsupply method and reservoir storage is presented. The method is applied to 16 multi-purpose dams and water supply performance is evaluated. As a result, 6 dams (Soyanggang, Chungju, Hoengseong, Andong, Imha, and Hapcheon dam) have highest performance and 2 dams (Sumjingang and Buan dam) have relatively low performance. Particularly, Buan dam is the most vulnerable in the analysis results of reliability, resiliency, and vulnerability. Therefore, measures to improve the performance of water supply are needed in Buan multi-purpose dam.

Hydrological Stability Analysis of the Existing Soyanggang Multipurpose Dam

  • Ko, Seok-Ku;Shin, Yong-Lo
    • Korean Journal of Hydrosciences
    • /
    • v.7
    • /
    • pp.37-49
    • /
    • 1996
  • This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.

  • PDF

Assessment of Drought Index considering Dam Water Shortage (댐 갈수를 고려한 가뭄관리지수 산정연구)

  • Kwak, Jaewon;Kim, Keuksoo;Kim, Taeyoung;Ha, Sangbong;Choi, Kyuhyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.311-311
    • /
    • 2018
  • Generally, the water resources in South Korea were supplied from river flow and dam. Among them, the dam is the most important supplier for the residential and industrial water. However, the climate change has caused a setback in water supply chain. The objective of the study is therefore to suggest a drought index consideing dam water shortage for efficiently dam and water resources management. The standardzied balanced index(SBI), which has same concept with the standardzied precipitation index, were suggested. Also, the management index for the dam were established with SSVI and the storage percentage that compared to previous years.

  • PDF

Water Quality Assessment for pre and post-Impoundment of 6 Multipurpose Dam Reservoirs in Korea (국내 6개 다목적댐 저수지의 담수 전·후 수질 비교평가)

  • Park, Jae-Chung;Shin, Jae-Ki;Song, Young-Il;Jeong, Yong-Moon;Song, Sang-Jin
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.1
    • /
    • pp.89-96
    • /
    • 2011
  • This study was carried out to assess the variations of water quality caused by the dam construction on the river. Six dams-Yongdam, Miryang, Hoengseong, Boryeong, Jangheung and Buan- constructed recently in Korea were selected for the study. Chemical oxygen demand(COD) was increased in the initial stage of water storage at dams compared to the lotic(river) environment, but after 3 years it was maintained lower and stabilized concentrations. Five dams except for Jangheung Dam were maintained Ia~Ib grade conditions under the water quality criteria of Korea. The concentrations of total nitrogen(T-N) were decreased under the lentic(reservoir) environment compared to the river status. Total phosphorus(T-P) was decreased 13~63% at the reservoir condition. We concluded that increase of COD concentration was due to the debris organic materials of the land, but temporary phenomenon. T-N and T-P concentrations were decreased at the lentic condition compared to the lotic.