Browse > Article
http://dx.doi.org/10.3741/JKWRA.2014.47.2.195

Performance Evaluation of Water Supply for a Multi-purpose Dam by Deficit-Supply Operation  

Lee, Dong Ryul (Korea Institute of Construction Technology)
Moon, Jang Won (Korea Institute of Construction Technology)
Choi, Si Jung (Korea Institute of Construction Technology)
Publication Information
Journal of Korea Water Resources Association / v.47, no.2, 2014 , pp. 195-206 More about this Journal
Abstract
In this study, a performance evaluation method of water supply for a multi-purpose dam based on deficitsupply method and reservoir storage is presented. The method is applied to 16 multi-purpose dams and water supply performance is evaluated. As a result, 6 dams (Soyanggang, Chungju, Hoengseong, Andong, Imha, and Hapcheon dam) have highest performance and 2 dams (Sumjingang and Buan dam) have relatively low performance. Particularly, Buan dam is the most vulnerable in the analysis results of reliability, resiliency, and vulnerability. Therefore, measures to improve the performance of water supply are needed in Buan multi-purpose dam.
Keywords
deficit-supply operation; water supply reliability; multi-purpose dam; reservoir operation; K-WEAP;
Citations & Related Records
Times Cited By KSCI : 9  (Citation Analysis)
연도 인용수 순위
1 Cha, H.S., Lee, G.M., and Jung, K.S. (2011). "Assessing appropriateness of water supply reliability in water resources planning." Proceedings of the Korea Water Resources Association Conference, KWRA, Daegu, pp. 108-115.
2 Chae, S., Kim, J., and Kim, S.K. (2012). "A study on evaluation of water supply capacity with coordinated weirs and multi-reservoir operating model." Journal of Korea Water Resources Association, KWRA, Vol. 45, No. 8, pp. 839-851.   과학기술학회마을   DOI   ScienceOn
3 Dandy, G.C., Connarty, M.C., and Loucks, D.P. (1997). "Comparison of methods for yield assessment of multiple reservoir systems." Journal ofWater Resources Planning and Management, Vol. 123, No. 6, pp. 350-358.   DOI   ScienceOn
4 Hashimoto, T., Stedinger, J.R., and Loucks, D.P. (1982). "Reliability, resiliency, and vulnerability criteria for water resources system performance evaluation." Water Resources Research, Vol. 18, No. 1, pp. 14-20.   DOI
5 Hsu, S. K. (1995). "Shortage indices for water-resources planning in Taiwan." Journal of Water Resources Planning and Management, Vol. 121, No. 2, pp. 119-131.   DOI   ScienceOn
6 Kang, M.G., and Park, S.W. (2005). "Assessment of additional water supply capacity using a reservoir optimal operation model." Journal of Korea Water Resources Association, KWRA, Vol. 38, No. 11, pp. 937-946.   과학기술학회마을   DOI
7 KICT(Korea Institute of Construction Technology). (2007). Korea Water Evaluation And Planning System Linked QUAL2K Manual.
8 K-water. (2011). Practical Manual of Dam Operation.
9 Labadie, J.W. (2004). "Optimal operation of multireservoir systems: state-of-the-art review." Journal ofWater Resources Planning and Management, Vol. 130, No. 2, pp. 93-111.   DOI   ScienceOn
10 Lee, G.M., and Yi, J. (2012). "Analysis of emergency water supply effects of multipurpose dams using water shortage index." Journal of Korea Water Resources Association, KWRA, Vol. 45, No. 11, pp. 1143-1156.   과학기술학회마을   DOI   ScienceOn
11 Lee, D.H., Choi, C.W., Yu, M.S., and Yi, J.E. (2012). "Reevaluation of multi-purpose reservoir yield." Journal of Korea Water Resources Association, KWRA, Vol. 45, No. 4, pp. 361-371.   과학기술학회마을   DOI   ScienceOn
12 Lee, D.R., Moon, J.W., Lee, D.H., and Ahn, J.H. (2006). "Development of water supply capacity index to monitor droughts in a reservoir." Journal of Korea Water Resources Association, KWRA, Vol. 39, No. 3, pp. 199-214.   과학기술학회마을   DOI   ScienceOn
13 Lee, G.M., and Lee, Y. (2012). "Analysis of problems on application of water yield appraisal indicators." Proceedings of the Korea Water Resources Association Conference, KWRA, Taebaek, pp. 222-226.
14 Noh, J. (1998). "A criterion for evaluating capacity of multi-purpose reservoir." Proceedings of the Korea Water Resources Association Conference, KWRA, Muju, pp. 245-250.
15 Lee, S.H., and Kang, T.U. (2006). "An evaluation method of water supply reliability for a dam by firm yield analysis." Journal ofKorea Water Resources Association, KWRA, Vol. 39, No. 5, pp. 467-478.   과학기술학회마을   DOI
16 MLTM. (2011). National Water Resources Plan (2011-2020).
17 Moy, W.S., Cohon, J.L., and Revelle, C.S. (1986). "A programming model for analysis of the reliability, resilience, and vulnerability of a water supply reservoir." Water Resources Research, Vol. 22, No. 4, pp. 489-498.   DOI
18 Yi, J.E., and Song, J.W. (2002). "Evaluation of water supply capacity for multi-purpose dam using optimization and simulation techniques." Journal of the Korean Society of Civil Engineers, KSCE, Vol. 22, No. 6-B, pp. 811-818.   과학기술학회마을
19 Park, S.S., Lee, D.R., Kim, H.J., and Shin, Y.H. (2001). "Evaluation of water supply capability on multipurpose dam in Korea." Proceedings of the Korea Water Resources Association Conference, KWRA, Daegu, pp. 533-538.
20 Yi, J.E., and Kwon, D.S. (2007). "Effects on conservation and flood control systems according to normal water level change from daechung multi-purpose reservoir." Journal ofKoreaWater Resources Association, KWRA, Vol. 40, No. 1, pp. 1-10.   과학기술학회마을   DOI   ScienceOn
21 Yi, J.E., Lee, G.M., and Cha, K.U. (2012). "Idea on the improvement of water yield evaluation methodology." Magazine of Korea Water Resources Association, KWRA, Vol. 45, No. 12, pp. 51-57.   과학기술학회마을