• Title/Summary/Keyword: dam sedimentation

Search Result 54, Processing Time 0.041 seconds

Numerical Analysis for Bed Changes in the Upstream Channel due to the Installation of Sediment Release Openings in the Flood Control Dam (홍수조절댐에서의 배사관 설치에 따른 상류 하천의 하상변동에 관한 수치모의 연구)

  • Ji, Un;Son, Kwang-Ik;Kim, Mun-Mo
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.4
    • /
    • pp.319-329
    • /
    • 2009
  • Sediment release openings or pipes are installed in the flood control dam constructed to reduce flood damages, which are to allow water and sediments pass through the dam and to prevent flow blockage and sedimentation in the upstream area of the dam. The Hantan River Flood Control Dam (HRFCD) has been projected for flood damage reduction and sediment release openings and ecological passages are considered for the dam design. In this study, sediment deposition due to the construction of HRFCD was analyzed using the HEC-6 model and compared with the state before the dam construction with respect to the conditions of the annual mean daily discharge and annual discharge hydrograph. According to the numerical results, although downstream water levels were changed by the dam structure, the effects of bed changes were not propagated from the dam over 2 km upstream. Also, 2D numerical models of RMA2 and SED2D were used to predict bed changes in the upstream area with and without sediment release openings. Consequently, it is presented that sediment release openings decreased maximum deposition height in the upstream channel of the dam.

Comparative Study on the Distribution of Sediment Deposits Along the Soyang-gang Dam by Measurement Data (소양강댐의 퇴사용량산정에 관한 연구)

  • Seo, Kwang-Suk;Lee, Joo-Heon;Lee, Eun-Tae
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.2 no.3 s.6
    • /
    • pp.109-117
    • /
    • 2002
  • An analysis to allocate storage space for sediment accumulation during the economic life of the reservoir is required in the planning or design of a reservoir. This analysis has been the most difficult and tedious aspect to deal with reservoir sedimentation because of the interaction between the various parameters related to the hydraulics of flow, reservoir operating policy, inflowing sediment load. The approach to analyzing spatial distribution of deposits has relied on empirical methods, all of which required a great deal of simplification from the actual physical phenomena. For the purpose of this study, reservoir sedimentation rate computed by Empirical Area Reduction Method is compared with measuring rate along the Soyang-gang Dam. As a conclusion, reservoir sedimentation rate can be estimated exactly by Empirical Area Reduction Method.

Depositional Environment and Distribution of Heavy Metal off the Shihwa Dam

  • Oh, Jae-Kyung
    • Journal of the korean society of oceanography
    • /
    • v.32 no.3
    • /
    • pp.120-127
    • /
    • 1997
  • Depositional environment off the Shihwa Dam has been studied to investigate the change of sedimentation process and the pollution. In order to understand how the sediments are distributed, polluted and modified, depositional factors have been analyzed and compared with the previous data. Study area, located off the Shihwa Dam, was surveyed to collect 25 bottom samples and 2 cores in 1996 and echo-sounding in 1997. These sediments were analyzed for the study of the global characteristics of sediment such as grain size and organic matter. Among these samples, the selected twenty surface sediments were analyzed for the comparison with their contents of metallic elements (Al, Mn, Fe, V, Cr, Co, Ni, Cu, Zn, Cd, Pb, As). According to field and lab analysis of sediments, three sedimentological zones have been generally identified around study area; near the dam (sandy Silt), near the dike (Sand) and offshore (silty Sand) zones. Textural parameters show that the content of silt and clay is dominant near the dam excepting the dike zone of LNG Storage Base and offshore (Palmido). The total concentration of Mn, Ni, Fe, Zn and Cd in bulk sediments was increased after the construction of the dam, while the content of Mn and Cr were higher near tidal channel than in the offshore area. Meanwhile, the annual increasing pattern of some heavy metal has appeared in this area. Based on this primary study, modification of the depositional environment may be caused by the construction of the dam and LNG Storage Base. Additionally, environmental evaluation on organic/inorganic factors has been suggested for interpreting environmental changes caused by coastal development in the nearshore such as the Shihwa coastal area.

  • PDF

Simulation of Reservoir Sediment Deposition in Low-head Dams using Artificial Neural Networks

  • Idrees, Muhammad Bilal;Sattar, Muhammad Nouman;Lee, Jin-Young;Kim, Tae-Woong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.159-159
    • /
    • 2019
  • In this study, the simulation of sediment deposition at Sangju weir reservoir, South Korea, was carried out using artificial neural networks. The ANNs have typically been used in water resources engineering problems for their robustness and high degree of accuracy. Three basic variables namely turbid water inflow, outflow, and water stage have been used as input variables. It was found that ANNs were able to establish valid relationship between input variables and target variable of sedimentation. The R value was 0.9806, 0.9091, and 0.8758 for training, validation, and testing phase respectively. Comparative analysis was also performed to find optimum structure of ANN for sediment deposition prediction. 3-14-1 network architecture using BR algorithm outperformed all other combinations. It was concluded that ANN possess mapping capabilities for complex, non-linear phenomenon of reservoir sedimentation.

  • PDF

Sediment Estimation of Large Reservoir Using Daily Flowrate Analysis (일유량 분석을 이용한 대규모 저수지의 퇴사량 추정)

  • 정재성
    • Journal of Environmental Science International
    • /
    • v.6 no.5
    • /
    • pp.417-423
    • /
    • 1997
  • The objective of this study Is to supply basic data for large reservoir sedimentation research In future and make suggestions to maintain and opera능 the reservoir more of efficiently. At first, previous studios about the estimation of sediment yield rate were reviewed in Korea. And the discharge rating curves of upstream stage gauging stations and the correlation between dam Inflow and stage discharge were analyzed. With the analysis results, the spec유c sediment rate of Soyanggang dam was estimated as 608 m3/km2/yr. It was similar to that of Soyanggang dam feasibility study and 1994's field surveys of the reservoir than that of 1983's field surveys. Because the sediment rating curves were derived under the low discharge conditions, It needs to be checked under the flood conditions. However, the suggested methods such as flowrate analysis and sediment estimation will be useful to the sediment studios In future. Key words . reservoir sediment, sediment yield rate, rating curve, flowrate analysis.

  • PDF

Numerical Analysis of Dam-break Waves in an L-shaped Channel with a Movable Bed (L자형 이동상수로에서 댐 붕괴파의 수치해석)

  • Kim, Dae-Geun;Hwang, Gun
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.3
    • /
    • pp.291-300
    • /
    • 2012
  • We conducted a three-dimensional numerical simulation by using the FLOW-3D, with RANS as the governing equation, in an effort to track the dam-break wave.immediately after a dam break.in areas surrounding where the dam break took place as well as the bed change caused by the dam-break wave. In particular, we computed the bed change in the movable bed and compared the variation in flood wave induced by the bed change with our analysis results in the fixed bed. The analysis results can be summarized as follows: First, the analysis results on the flood wave in the L-shaped channel and on the flood wave and bed change in the movable-bed channel successfully reproduce the findings of the hydraulic experiment. Second, the concentration of suspended sediment is the highest in the front of the flood wave, and the greatest bed change is observed in the direct downstream of the dam where the water flow changes tremendously. Generated in the upstream of the channel, suspended sediment results in erosion and sedimentation alternately in the downstream region. With the arrival of the flood wave, erosion initially prove predominant in the inner side of the L-shaped bend, but over time, it tends to move gradually toward the outer side of the bend. Third, the flood wave in the L-shaped channel with a movable bed propagates at a slower pace than that in the fixed bed due to the erosion and sedimentation of the bed, leading to a remarkable increase in flood water level.

Recent Advances in Sedimentation and River Mechanics

  • Pierre Julien
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2002.05a
    • /
    • pp.3-16
    • /
    • 2002
  • This article describes some of the recent and on-going research developments of the author at Colorado State University. Advances in the field of sedimentation and river mechanics include basic research and computer modeling on several topics. Only a few selected topics are considered here: (1) analytical determination of velocity profiles, shear stress and sediment concentration profiles in smooth open channels; (2) experiments on bedload particle velocity in smooth and rough channels; (3) field measurements of sediment transport by size fractions in curved flumes. In terms of computer modeling, significant advances have been achieved in: (1) flashflood simulation with raster-based GIOS and radar precipitation data; and (2) physically-based computer modeling of sediment transport at the watershed scale with CASC2D-SED. Field applications, measurements and analysis of hydraulic geometry and sediment transport has been applied to: (1) gravel-bed transport measurements in a cobble-bed stream at Little Granite Creek, Wyoming; (2) sand and gravel transport by size fraction in the sharp meander bends of Fall River, Colorado; (3) changes in sand dune geometry and resistance to flow during major floods of the Rhine River in the Netherlands; (4) changes in hydraulic geometry of the Rio Grande downstream of Cochiti Dam, New Mexico; and (5) analysis of the influence of water temperature and the Coriolis force on flow velocity and sediment transport of the Lower Mississippi River in Louisiana. Recent developments also include two textbooks on "Erosion and Sedimentation" and "River Mechanics" by the author and state-of-the-art papers in the ASCE Journal of Hydraulic Engineering.

  • PDF

Pollutant Removal Efficiency of Sedimentation Basin at Inlet of an Irrigation Reservoir (저수지 내 유입부 침강지의 수질정화 효율)

  • Jang, Jeong-Ryeol;Choi, Sun-Hwa;Kwun, Soon-Kuk
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.5
    • /
    • pp.473-479
    • /
    • 2004
  • A sedimentation basin (SB) at the inlet of an irrigation reservoir which was constructed using an auxiliary dam was monitored to evaluate its pollutant removal efficiency. Water sampling at three points, i.e., inflow stream, upstream and downstream of the reservoir, were taken 5 times before and after the construction of the SB in 1999 and 2003, respectively. No significant water quality variations in inflow stream were observed during these periods. The COD, T-N, T-P and SS removal efficiencies were 38, 24, 35 and 49%, respectively. The results indicated that those removal efficiencies significantly increased during the rainy season and COD removal efficiency, especially, was higher than others studies. The scale of SB in this study was rational as aspects of pollutant removal efficiency and hydraulic detention time. And it is recommended that SB, at inlet of an reservoir, should be constructed as completely separated structure from reservoir water body and having SAR Index from 0.7% to 1.0%.

Analysis of Erosion Risk in a Catchment using Projected Rainfall Data and Spatial Rainfall-Erosion Model

  • Felix, Micah Lourdes;Kim, Joocheol;Choi, Mikyoung;Jang, Ning;Jung, Kwansue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.316-316
    • /
    • 2021
  • Erosion in a watershed is one of the main sources of sediment inflow in dams. While sediment management practices can be performed to reduce and manage sedimentation in reservoirs, managing the sediment inflow before it reaches the reservoir should also be consider. The accurate location of areas with high erosion and deposition rates should be determined in order to propose an appropriate sediment management procedure such as the construction of check dams. In this study, the projected rainfall from HadGEMRA-3 for RCP 8.5, was used in C-SEM, a distributed rainfall-erosion model, to determine the projected spatial erosion patterns in Cheoncheon catchment, which is located in the upstream part of Yongdam Dam.

  • PDF

Identification of Uncertainty on the Reduction of Dead Storage in Soyang Dam Using Bayesian Stochastic Reliability Analysis (Bayesian 추계학적 신뢰도 기법을 이용한 소양강댐 퇴사용량 감소의 불확실성 분석)

  • Lee, Cheol-Eung;Kim, Sang Ug
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.3
    • /
    • pp.315-326
    • /
    • 2013
  • Despite of the importance on the maintenance of a reservoir storage, relatively few studies have addressed the stochastic reliability analysis including uncertainty on the decrease of the reservoir storage by the sedimentation. Therefore, the stochastic gamma process under the reliability framework is developed and applied to estimate the reduction of the Soyang Dam reservoir storage in this paper. Especially, in the estimation of parameters of the stochastic gamma process, the Bayesian MCMC scheme using informative prior distribution is used to incorporate a wide variety of information related with the sedimentation. The results show that the selected informative prior distribution is reasonable because the uncertainty of the posterior distribution is reduced considerably compared to that of the prior distribution. Also, the range of the expected life time of the dead storage in Soyang Dam reservoir including uncertainty is estimated from 119.3 years to 183.5 years at 5% significance level. Finally, it is suggested that the improvement of the assessment strategy in this study can provide the valuable information to the decision makers who are in charge of the maintenance of a reservoir.