• Title/Summary/Keyword: dam

Search Result 4,301, Processing Time 0.024 seconds

UNCERTAINTY IN DAM BREACH FLOOD ROUTING RESULTS FOR DAM SAFETY RISK ASSESSMENT

  • Lee, Jong-Seok
    • Water Engineering Research
    • /
    • v.3 no.4
    • /
    • pp.215-234
    • /
    • 2002
  • Uncertainty in dam breach flood routing results was analyzed in order to provide the basis fer the investigation of their effects on the flood damage assessments and dam safety risk assessments. The Monte Carlo simulation based on Latin Hypercube Sampling technique was used to generate random values for two uncertain input parameters (i.e., dam breach parameters and Manning's n roughness coefficients) of a dam breach flood routing analysis model. The flood routing results without considering the uncertainty in two input parameters were compared with those with considering the uncertainty. This paper showed that dam breach flood routing results heavily depend on the two uncertain input parameters. This study indicated that the flood damage assessments in the downstream areas can be critical if uncertainty in dam breach flood routing results are considered in a reasonable manner.

  • PDF

Analysis of Hydrograph by Dam Breach Shapes (댐 파괴형상에 따른 수문곡선 해석)

  • Park, Ki-Bum
    • Journal of Environmental Science International
    • /
    • v.16 no.4
    • /
    • pp.487-493
    • /
    • 2007
  • In this study is analysis which dams breach shapes are effect on peak discharge of dam-failure. The dam breach shapes and failure time are important peak discharge when dam failure. When dam failure times are 1hr, 2hr and 3hr condition for the ECRD and 0.1hr and 0.2hr for the CG and CFRD that breach shapes changed base length $B_b=1Hd,\;B_b=2Hd\;and\;B_b=3Hd$. As the results from DAMBRK(Dam Break model) peak discharge are increase base widths lengthen. As failure time is longer then peak discharge is decrease. So peak discharge is increase more short of dam failure time. Also peak discharge is increase become larger dam breach shapes.

Fractal behavior identification for monitoring data of dam safety

  • Su, Huaizhi;Wen, Zhiping;Wang, Feng
    • Structural Engineering and Mechanics
    • /
    • v.57 no.3
    • /
    • pp.529-541
    • /
    • 2016
  • Under the interaction between dam body, dam foundation and external environment, the dam structural behavior presents the time-varying nonlinear characteristics. According to the prototypical observations, the correct identification on above nonlinear characteristics is very important for dam safety control. It is difficult to implement the description, analysis and diagnosis for dam structural behavior by use of any linear method. Based on the rescaled range analysis approach, the algorithm is proposed to identify and extract the fractal feature on observed dam structural behavior. The displacement behavior of one actual dam is taken as an example. The fractal long-range correlation for observed displacement behavior is analyzed and revealed. The feasibility and validity of the proposed method is verified. It is indicated that the mechanism evidence can be provided for the prediction and diagnosis of dam structural behavior by using the fractal identification method. The proposed approach has a high potential for other similar applications.

Effects of a Degree of Discretization in the Direction of Longitudinal Dam Axis on the Results of 3-D Fill Dam Response Analysis (댐 축방향 분할도가 3차원 필댐 지진응답해석 결과에 미치는 영향)

  • Ha, Ik-Soo;Oh, Byung-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.72-83
    • /
    • 2009
  • The purpose of this study is to examine the effects of a degree of discretization in the direction of longitudinal dam axis on the results of three dimensional fill dam dynamic analysis. In this study, the three dimensional dynamic analyses of the existing 'H' dam which is modeled with a different degree of discretization were carried out. From these results, the fundamental frequency of the dam and the responses at the dam crest such as acceleration and settlement were compared and analyzed. It was concluded that the size of finite element discretized in the direction of the longitudinal axis mush be smaller than 1/8 of dam length in order to obtain the reasonable fundamental frequency and response of acceleration and mush be smaller than 1/10 in order to obtain the reasonable settlement behaviors from the three dimensional dynamic analysis of the fill dam.

  • PDF

Senstivity analysis by seismograph of composition Dam (복합댐의 지진계수별 민감도 분석)

  • Kim, Jae-Hong;Oh, Byung-Hyun;Hong, Won-Pho;Jeon, Je-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.820-826
    • /
    • 2008
  • Differ number of seismograph to the composition dam by recently frequent earthquake and analyzed responsiveness. Interest for dam inner place by increase of something wrong flood and inside and outside of the country earthquake appearance according to unusual change of weather is risen, on important urea in dam safety floodgate school register by structural safety divide can. Therefore, by PMP (PMF) of dam and increase of domestic earthquake occurrence, need research about earthquake resistant nature ability estimation of water resources facilities. Because responsiveness analysis applies number 0.154 ~ 0.25 g of seismograph, seismic wave that use in analysis is being suitable in dynamic analysis of construction such as Rockfill dam from representative chapter cycle faction and recommend in domestic internal examination design workbook, and use results applied much Hachinohe wave onions in van abroad.

  • PDF

Application of subspace identification on the recorded seismic response data of Pacoima Dam

  • Yu, I-No;Huang, Shieh-Kung;Loh, Kenneth J.;Loh, Chin-Hsiung
    • Structural Monitoring and Maintenance
    • /
    • v.6 no.4
    • /
    • pp.347-364
    • /
    • 2019
  • Two seismic response data from the CSMIP strong motion instrumentation of Pacoima dam are selected: San Fernando earthquake (Jan 13, 2001; ML=4.3) and Newhall earthquake (Sept. 1, 2011; ML=4.2), for the identification of the dam system. To consider the spatially nonuniform input ground motion along the dam abutment, the subspace identification technique with multiple-input and multiple-output is used to extract the dynamic behavior of the dam-reservoir interaction system. It is observed that the dam-reservoir interaction is significant from the identification of San Fernando earthquake data. The influence of added mass (from the reservoir) during strong ground motion will create a tuned-mass damper phenomenon on the dam body. The fundamental frequency of the dam will be tuned to two different frequencies but with the same mode shapes. As for the small earthquake event, the dam-reservoir interaction is insignificant.

Altitude Changes of Riverbedsin Naeseong River Before and After Yeongju Dam Construction (영주댐 건설 전후 내성천의 하상 고도 변화)

  • Lee, Gwang-Ryul
    • Journal of The Geomorphological Association of Korea
    • /
    • v.24 no.1
    • /
    • pp.13-24
    • /
    • 2017
  • This study analyzes altitude changes of riverbed at 6 bridges in the upper and lower reaches of Yeongju Dam in Naeseong River, from 2009 to 2016 just before and after the dam construction. For 5 years from November 2010 to December 2015 when the dam was under construction, approximately 0.091m of the riverbed altitude in average more than twice before the dam construction was lowered, because of the effects of riverbed excavation for riverside maintenance in the upper reaches and transport limitation of flow and sediment by the dam in the lower reaches. Between November 2009 and December 2016 when the dam was in pre-construction and post-construction stages, respectively, the most sites in this study in the upper and lower reaches showed lowering in the riverbed altitudes. On the other hand, the riverbed around Hoeryongpo closed to the river mouth seems to be influenced by channel changes in Nakdong River rather than by the dam construction.

Dam Failure and Unsteady Flow Analysis through Yeoncheon Dam Case(II) - Unsteady Flow Analysis of Downstream by Failure Scenarios - (연천댐 사례를 통한 댐 파괴 부정류해석 및 하류 영향 검토(II) -시나리오에 따른 댐 하류 부정류 해석 및 범랑특성 연구-)

  • Jang, Suk-Hwan
    • Journal of Environmental Science International
    • /
    • v.17 no.11
    • /
    • pp.1295-1305
    • /
    • 2008
  • This study aims at the analyze of unsteady downstream flow due to dam failure along dam failure scenario and applied to Yeoncheon Dam which was collapsed August 1st 1999, using HEC-RAS simulation model. The boundary conditions of this unsteady flow simulation are that dam failure arrival time could be at 02:45 a.m. August 1st 1999 and failure duration time could be also 30 minutes. Downstream 19.5 km from dam site was simulated for unsteady flow analysis in terms of dam failure and non-failure cases. For the parameter calibration, observed data of Jeonkok station were used and roughness coefficient was applied to simulation model. The result of the peak discharge difference was 2,696 to $1,745\;m^3/sec$ along the downstream between dam failure and non-failure and also peak elevation of water level showed meanly 0.6m difference. Those results of these studies show that dam failure scenarios for the unknown failure time and duration were rational because most results were coincident with observed records. And also those results and procedure could suggest how and when dam failure occurs and downstream unsteady flow analyzes.

Evaluation of Fundamental Frequency of Rockfill Dam using Microearthquake Records (미소지진 계측기록을 이용한 사력댐 고유진동수 산정)

  • Ha, Ik-Soo;Lee, Jong-Wook;Oh, Byung-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.1438-1445
    • /
    • 2008
  • The purpose of this study is to evaluate the fundamental frequency of the dam by the various methods using real microearthquake records which were measured on 'H' dam site and to compare each results. In this study, the fundamental frequency was evaluated by the frequency analysis of the microearthquake records which were measured on the dam crest, by the evaluation of acceleration amplification ratio between the foundation and the crest of dam, and by the evaluation of acceleration response spectrum ratio between the foundation and the crest of dam, respectively. Among these methods, it was found that the method by the evaluation of acceleration response spectrum ratio between the foundation and the crest of dam was the most effective method. But, if the simple engineering judgement can be considered, it was thought that the all three methods could reasonably evaluate the fundamental frequency of the dam.

  • PDF

Parallel reservoirs system operation using NYC-Space Allocation-Rule (NYC-Space Allocation Rule을 이용한 병렬저수지 연계운영)

  • Park Ki-Bum;Lee Soon-Tak
    • Journal of Environmental Science International
    • /
    • v.14 no.6
    • /
    • pp.533-542
    • /
    • 2005
  • In this study, an optimization technique was developed from the application of Allocation Rule. Average Allocation coefficients of the Andong and Imha dam compare constant water supply condition with vary water supply condition that are above the contribute ratio $67\%\~50\%$ the Andong dam in Rule(A)-Rule(C). In the Refill Season, Andong dam water supply contribution is higher than Imha dam at the Control point water supply. In the Allocation analysis results, Rule(A) is calculated storage ratio because Andong dam contribute to Control point larger than Imha dam which Andong dam storage is larger than Imha dam storage. Rule(B) calculated sum of the storage and inflow ratio for Andong dam and Imha dam, as Andong dam contribution is higher than Imha dam. Rule(C) calculated that sum of storage, inflow and water supply is divided average storage ratio, as the best results of the Allocation coefficients and water supply capacity. The results of storage analysis is larger vary water supply condition than constant water supply condition and the results of water supply analysis is larger vary water supply condition than constant water supply condition. Water supply deficit is decrease $30\%$ for vary water supply condition.